A record should be made of the proposed route details (e.g., path,
quantity, size, depth)
Give this one a try later!
Documentation Reporting
, Evaluation Observation
Don't know?
2 of 27
Term
Alternate Route Considerations
Give this one a try later!
To reduce the cost of multiple trenches and minimize the potential for damage to
the existing facilities, dig a single trench and share it with one or all of the other
parties
The existing route may be fully adequate. The OSP designer should evaluate the
existing:
• Pole lines.
• Conduit.
• MHs.
• Handholes (HHs).
• Tunnels.
An alternative route may be considered if the field investigation indicates the
proposed route would
• High installation costs.
• An unsafe working environment.
• Future maintenance issues.
, In planning for OSP cabling, cable infrastructure must be determined irst. The
choices are underground, direct-buried, and aerial.
Don't know?
3 of 27
Definition
When working on public or private right-of-way, necessary permits and
easements should be obtained before beginning construction. If
construction is planned on a:
Give this one a try later!
Yield Right-of-Way
Right-of-space Emergency Vehicle
Don't know?
4 of 27
Term
Pathway Considerations
Definition
A record should be made of the proposed route details (e.g., path,
quantity, size, depth)
Give this one a try later!
Documentation Reporting
, Evaluation Observation
Don't know?
2 of 27
Term
Alternate Route Considerations
Give this one a try later!
To reduce the cost of multiple trenches and minimize the potential for damage to
the existing facilities, dig a single trench and share it with one or all of the other
parties
The existing route may be fully adequate. The OSP designer should evaluate the
existing:
• Pole lines.
• Conduit.
• MHs.
• Handholes (HHs).
• Tunnels.
An alternative route may be considered if the field investigation indicates the
proposed route would
• High installation costs.
• An unsafe working environment.
• Future maintenance issues.
, In planning for OSP cabling, cable infrastructure must be determined irst. The
choices are underground, direct-buried, and aerial.
Don't know?
3 of 27
Definition
When working on public or private right-of-way, necessary permits and
easements should be obtained before beginning construction. If
construction is planned on a:
Give this one a try later!
Yield Right-of-Way
Right-of-space Emergency Vehicle
Don't know?
4 of 27
Term
Pathway Considerations