100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Resumen

Summary Nearly Free: Budget Analysis and Cost Estimating Capella University MBA-FPX 53333 1 Conte

Puntuación
-
Vendido
-
Páginas
27
Subido en
20-04-2025
Escrito en
2024/2025

Nearly Free: Budget Analysis and Cost Estimating Capella University MBA-FPX 53333 1 Contents Budget Analysis Report...............................................................................................................3 Current Financial State............................................................................................................... 3 Cost Estimation Techniques.......................................................................................................5 Cost Estimate of Individual Activities or Work Packages.......................................................8 Failure Points................................................................................................................................ 8 Appendix..................................................................................................................................... 13 2

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
20 de abril de 2025
Número de páginas
27
Escrito en
2024/2025
Tipo
Resumen

Temas

Vista previa del contenido

Nearly Free: Budget Analysis and Cost Estimating


Capella University

MBA-FPX 53333




1

,Contents
Budget Analysis Report...............................................................................................................3

Current Financial State............................................................................................................... 3

Cost Estimation Techniques.......................................................................................................5

Cost Estimate of Individual Activities or Work Packages.......................................................8

Failure Points................................................................................................................................ 8

Appendix..................................................................................................................................... 13




2

, Nearly Free.com: Budget Analysis and Cost Estimating

Budget Analysis Report

Project Revive has been contracted to consult and provide analysis and turnaround
proposal for a recently failed project by NearlyFree.com. The NearlyFree.com project was
originally scoped to develop and deploy an automated web-based training system for new
employee orientations to reduce the workload and cut down personnel resources required to
complete the new employee orientation (NEO) training. The web-based module must be
integrated within the company Intranet and provide electronic presentation of all existing human
resources processes, contain online help for assistance during the new hire process, and
contain at least one quiz to assess employee understanding. The training also must incorporate
electronic sign-off upon completion and documentation and tracking of training and feedback to
the human resources department.

Project Revive will provide a detailed financial analysis of the failed project and provide a
project estimation report for the turnaround project. The financial analysis will include a review
of the project’s current financial state, review and analysis of the cost estimating techniques and
work breakdown structure, and a summary of the project’s failure points. The turnaround
proposal and project estimation report will include the Total Cost of Ownership (TCO), Return
on Investment (ROI), the detailed project budget proposal, contingency and management
reserves, and summary of cost estimating techniques used for the proposal.

Current Financial State

The initial budget for the NearlyFree Employee Orientation project was $25,000. The
project cost baseline was estimated at $22,300 with an estimated project duration of 92 days.
The project was suspended on 12/7/24 due to significant cost and schedule overruns that
threatened the success of the project. At that point in the project, the actual cost of the work
completed was $20,453.95 (82% of the total budget), with less than half of the project work
completed (46%). An analysis of the following reports has been completed to further evaluate
the project performance and determine the failure points of the project:

 Project Cost Overview Report
 Earned Value Report
 Variance
 Performance Index

Project Cost Overview

The project cost overview report, included as Figure 1, shows the overall financial status of
the Nearly Free project. The total project cost is estimated at $30,380, which includes the cost
of actual work completed and estimated cost of the remaining work. The project is currently on
track to exceed the $25.000 budget by $8,080, which is 21% of the project budget.

Earned Value Management

Earned value management is a technique used to measure project performance and assess
progress during project execution. EVM measures project performance against the project
estimated baselines to provide objective data, increase accountability, encourage proactivity to


3
$7.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
helperatsof1 Wgu
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2523
Miembro desde
5 año
Número de seguidores
2045
Documentos
7896
Última venta
2 semanas hace
Best class tutorials

Well written guides to enhance your learning potential

4.0

439 reseñas

5
224
4
88
3
56
2
30
1
41

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes