Click here for more: Scholarsnexus - Stuvia US
CON 101 Chapter 1 (Exam 1) Questions
with Detailed Verified Answers (100%
Correct Answers) /Already Graded A+
Base Isolators
Ans: Large shock absorbers made of alternating layers of rubber and steel
attached to a building's foundation to allow movement of the structure without
causing damage.
Brownfield Sites
Ans: A property that is abandoned or underused because of historic
environmental contamination.
Constructability Review
Ans: A design review process in which experienced contractors and
construction managers work with the designers to ensure that the details of
the design actually can be built in an efficient and cost-effective manner. The
process entails review of materials, application, installation techniques, field
execution, and building systems.
Cofferdams
Ans: Temporary watertight enclosures erected to prevent water from
seeping into an area, allowing construction to take place in the water-free
space.
Curtain Wall
, Page | 2
Click here for more: Scholarsnexus - Stuvia US
Ans: An exterior cladding system that is supported entirely by the frame of
the building, rather than being self-supporting or load-bearing.
Infrastructure
Ans: The basic roadways, bridges, and railroad networks that support a
community or society.
Lean Principles
Ans: Principles that stem from the Toyota Production System (TPS) and focus
on creating more value for customers with less work and the elimination of
waste. These principles are now being applied to the construction industry.
Program
Ans: A written statement that identifies and describes an owner or end user's
needs and requirements for a facility. Every design starts with a program.
Project Delivery
Ans: A comprehensive process by which a building, facility, or structure is
designed and constructed.
Self-performed Work
Ans: Construction work that is performed with the general contractor's own
forces or labor. This is work that is not subcontracted.
Slip Forms