100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CSI CDT Study info Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
16-04-2025
Escrito en
2024/2025

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 1 CSI CDT Study info Exam Questions And Answers |Latest 2025 | Guaranteed Pass Construction Documents consist of - Answerprocurement documents and contract documents elements of construction documents - Answerwritten and graphic documents prepared for communicating the project design for construction and administering the construction contract (Procurement and Contract Documents) A/E - AnswerThe principle, who acts as a Team to provide planning, design, and construction administration services for the project. Letter of intent to Award - AnswerPreconstruction activities begin when the contractor has received Payment and Performance Bond - AnswerA part of preconstruction submittals integrated project delivery - AnswerBased on approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to owner, reduce waste and maximize efficiency through all phases of design, fabrication, and construction ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 2 Principles of Integrated Project Delivery - AnswerTakes increased planning effort and expense, change in practice habits including risk management, early agreement on use of technology, and the ability to play multiple roles. Mutual efforts toward risk management and assignment of responsibility, as well as emphasis on collaborative action, seeks to minimize the isolation of risk and associated damage claims. Construction Budget - Answerthe biggest portion of the project budget. It includes the cost of bonds, insurance, products and systems, and labor both to construct the facility and to verify and administer the construction process Change Directive - Answerdirects the contractor to make a change to the project before the owner and contractor have agreed upon the proposed changes in contract sum or time competitive bidding - Answercreates an environment where bidders at every level, contractor, subcontractor, and supplier, must carefully and seriously consider every aspect of their bid in the attempt to be awarded the work by providing a lower price than any of the other bidders. Addenda - Answerwritten or graphic instruments issued to clarify, revise, add to, or delete information in the procurement documents or in previous addenda. Typically addenda are issued before the opening of bids. Bid - Answeran offer to perform a contract for work and labor or supply materials or goods at a specific price. CMa - AnswerConstruction Management as Adviser CMc - AnswerConstruction Manager as Contractor ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 3 Commissioning - AnswerIdentifies process and requirements for facility, system, and component operation testing and checkout. Construction - Answerthe execution of the work as required by the contract documents Construction Manager - AnswerAn entity that typically contracts with the owner to provide construction management services Design-Bid-Build - AnswerA delivery method that is the traditional method for moving a project from conception to completion. It is a linear sequence of activities generally occurring in the following order: project conception, design (including schematic and design development) construction documents, competitive bidding, and then construction. Design-Build - Answerthe owner contracts with a single entity for the complete design and construction of a project. under a single contract with the owner. Express Warranty - AnswerAny affirmation of fact or promise made by the seller to the buyer that relates to the goods or installation Facility Life Cycle - Answerfrom concept through construction to use and eventual deconstruction (demolition), follows a number of stages: Project conception, project delivery methods, design, construction documents, bidding/negotiating/purchasing, construction, and facility management. The four Cs of communication - AnswerClear, Concise, Correct and Complete General Aggregate Limit - AnswerThe maximum limit of liability payable during any given annual policy period

Mostrar más Leer menos
Institución
CSI CDT
Grado
CSI CDT









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CSI CDT
Grado
CSI CDT

Información del documento

Subido en
16 de abril de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+




CSI CDT Study info Exam Questions And
Answers |Latest 2025 | Guaranteed Pass




Construction Documents consist of - Answer✔procurement documents and contract
documents



elements of construction documents - Answer✔written and graphic documents prepared for
communicating the project design for construction and administering the construction contract
(Procurement and Contract Documents)



A/E - Answer✔The principle, who acts as a Team to provide planning, design, and construction
administration
services for the project.



Letter of intent to Award - Answer✔Preconstruction activities begin when the contractor has
received



Payment and Performance Bond - Answer✔A part of preconstruction submittals



integrated project delivery - Answer✔Based on approach that integrates people, systems,
business structures and practices into a process that collaboratively harnesses the talents and
insights of all participants to optimize project results, increase value to owner, reduce waste
and maximize efficiency through all phases of design, fabrication, and construction




1

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+


Principles of Integrated Project Delivery - Answer✔Takes increased planning effort and
expense, change in practice habits including risk management, early agreement on use of
technology, and the ability to play multiple roles. Mutual efforts toward risk management and
assignment of responsibility, as well as emphasis on collaborative action, seeks to minimize the
isolation of risk and associated damage claims.



Construction Budget - Answer✔the biggest portion of the project budget. It includes the cost of
bonds, insurance, products and systems, and labor both to construct the facility and to verify
and administer the construction process



Change Directive - Answer✔directs the contractor to make a change to the project before the
owner and contractor have agreed upon the proposed changes in contract sum or time



competitive bidding - Answer✔creates an environment where bidders at every level,
contractor, subcontractor, and supplier, must carefully and seriously consider every aspect of
their bid in the attempt to be awarded the work by providing a lower price than any of the
other bidders.



Addenda - Answer✔written or graphic instruments issued to clarify, revise, add to, or delete
information in
the procurement documents or in previous addenda. Typically addenda are issued before the
opening of bids.



Bid - Answer✔an offer to perform a contract for work and labor or supply materials or goods at
a specific price.



CMa - Answer✔Construction Management as Adviser



CMc - Answer✔Construction Manager as Contractor




2
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
194
Miembro desde
1 año
Número de seguidores
7
Documentos
12191
Última venta
4 días hace
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reseñas

5
10
4
4
3
8
2
3
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes