CON 367 Exam 1
Which one of the following is not a Project Delivery System? - ANS -Professional CM (Agency
CM) X
Design-Bid-Build
Multiple Prime Contracting
At-Risk CM
In lump-sum contracts, the Owner assumes the risk of cost. - ANS -False
Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. - ANS -False
In the Design-Build project delivery system, the Owner has separate contracts with the Designer
and the Contractor. - ANS -False
The Resident Project Representative should stop the work of the Contractor when the work is
not performed according to the drawings and specifications. - ANS -False
Which of the following should not be performed by the Resident Project Representative for
inspections? - ANS -Providing instructions directly to subcontractors
Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. - ANS -True
According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. - ANS
-True
Shop drawings can be used as change orders. - ANS -False
Which of the following is not a condition where a contract will not be enforced by courts? - ANS
-Seniority
Some contracts must be in writing under the ____________ as adopted by each state: - ANS
-Statute of Frauds
RFI (Request for Information) is the document that is transmitted to the General Contractor from
the Designer to get clarifications with respect to design drawings and specifications. - ANS
-False
Which one of the following is not a Project Delivery System? - ANS -Professional CM (Agency
CM) X
Design-Bid-Build
Multiple Prime Contracting
At-Risk CM
In lump-sum contracts, the Owner assumes the risk of cost. - ANS -False
Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. - ANS -False
In the Design-Build project delivery system, the Owner has separate contracts with the Designer
and the Contractor. - ANS -False
The Resident Project Representative should stop the work of the Contractor when the work is
not performed according to the drawings and specifications. - ANS -False
Which of the following should not be performed by the Resident Project Representative for
inspections? - ANS -Providing instructions directly to subcontractors
Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. - ANS -True
According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. - ANS
-True
Shop drawings can be used as change orders. - ANS -False
Which of the following is not a condition where a contract will not be enforced by courts? - ANS
-Seniority
Some contracts must be in writing under the ____________ as adopted by each state: - ANS
-Statute of Frauds
RFI (Request for Information) is the document that is transmitted to the General Contractor from
the Designer to get clarifications with respect to design drawings and specifications. - ANS
-False