100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NACHI TEST QUESTIONS AND ANSWERS | VERIFIED | GRADED A 2025

Puntuación
-
Vendido
-
Páginas
44
Grado
A+
Subido en
11-04-2025
Escrito en
2024/2025

NACHI TEST QUESTIONS AND ANSWERS | VERIFIED | GRADED A 2025

Institución
NACHI
Grado
NACHI











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NACHI
Grado
NACHI

Información del documento

Subido en
11 de abril de 2025
Número de páginas
44
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1



NACHI TEST QUESTIONS AND ANSWERS | VERIFIED |
GRADED A 2025
A hole may be bored no closer than _____ from the top or bottom of a joist. -
(answers)2 inches



A heater thermostat located in the kitchen will tend to keep the rest of the house
_______ than is desirable. - (answers)Cooler



A home inspector can use a microwave leak-detector to check -
(answers)microwave ovens



A home inspector's liability is ... - (answers)greater if the client's expectations are
not realistic



A home's main fuses or breakers are most likely to trip _____________. -
(answers)when many large appliances are operating simultaneously



A hopper is a common type of - (answers)Window



A horizontal fire block is required around a metal chimney pipe at ___________
lines. - (answers)floor and ceiling



A hot-water supply that is 1/2-inch in diameter for a home that has four
bedrooms and two and a half bathrooms means that there will - (answers)Not be
an adequate water supply

, 2




A joist below and parallel to a bearing wall should be - (answers)doubled



A jumper wire should be used to bridge the electrical ground across a ? -
(answers)water meter



A kitchen split-receptacle is a ? - (answers)duplex receptacle whose top and
bottom halves are on individual dedicated circuits



A lintel can be found - (answers)in a wall



A missing or undersized lintel can put pressure on the ___________. -
(answers)windows



A loose vent connection at the chimney can ______________. - (answers)allow
exhaust gases to enter the home



A louver window is more desirable in a ________ climate. - (answers)warm



A low slope can lead to problems with all of the following types of roof-covering
materials, except ___________. - (answers)roll roofing



A load-bearing stud wall has a ____________. - (answers)double top plate and a
single sole plate

, 3




A non-bearing partition stud can be _____ notched - (answers)40%



A non-metallic sheathed conductor without a bushing at the electrical sub-panel
should be secured at _______ above the panel. - (answers)8 inches



A parapet wall is - (answers)a wall that protrudes above the roofline



A pediment can be found - (answers)at the top of a window



A pitch pocket would most likely be used in or with a - (answers)plumbing stack



A plumbing drain line should run downhill at a slope of - (answers)1/4-inch per
foot



A plumbing inspection does not include the - (answers)lawn sprinkler systems



A pressure/temperature-relief valve on a hot water tank should have an extension
to - (answers)the floor



A problem with homemade leaf screens or guards is that they sometimes -
(answers)fall into the gutters, leading to faster clogging of the guttering system
than if it had no screens at all

, 4




A property's grading should be maintained up to ____ feet away from the house. -
(answers)6



A puddle on a flat roof that is 20 x 20 feet in area and an inch deep weighs -
(answers)1 ton



A pump just before the water return at a boiler is an indication that it is a... -
(answers)forced hot-water system



A radiant-heat systems uses _________ to radiate heat. - (answers)pipes and
panels and/or entire walls, floors and/or the ceiling



Channel and drop" is a type of ? - (answers)wood siding



Which of the following soils can support the least load-bearing pressure? -
(answers)Silt with high compressibility



In general, the grading around a building should be positively sloped for how
many feet

away from the building? - (answers)10 feet



Flashing is not required at which of the following locations? - (answers)Above
projecting masonry
$20.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DocBeast Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
8356
Miembro desde
11 meses
Número de seguidores
3
Documentos
2778
Última venta
5 días hace

5.0

617 reseñas

5
600
4
15
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes