NICET LEVEL 1 IN HIGHWAY CONSTRUCTION 2024 EXAM /ALL QUESTIONS AND CORRECTLY VERIFIED ANSWERS Acceptance - ANSWERS The written acceptance by the Department of the Work. acceptance testing - ANSWERS Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - ANSWERS The computed cost using calculations provided addendum - ANSWERS A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - ANSWERS The quantity of a completed Item eligible for payment authorized funding amount - ANSWERS The amount of funds authorized by the Department for the Contract Bidder - ANSWERS The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. bridge - ANSWERS . A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: bridge length - ANSWERS The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure bridge width - ANSWERS The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing Change Order. - ANSWERS A written order issued by the Department to the Contractor after execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time. Commercially Useful Function - ANSWERS Occurrences in which the subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project.

Mostrar más Leer menos
Institución
NICET
Grado
NICET









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NICET
Grado
NICET

Información del documento

Subido en
9 de abril de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NICET LEVEL 1 IN HIGHWAY CONSTRUCTION 2024 EXAM /ALL
QUESTIONS AND CORRECTLY VERIFIED ANSWERS



Acceptance - ANSWERS The written acceptance by the Department of the Work.



acceptance testing - ANSWERS Testing conducted by the Department to measure the degree of
compliance to the Contract



actual cost - ANSWERS The computed cost using calculations provided



addendum - ANSWERS A Contract revision or response to a Contractor inquiry issued after
advertisement and before the opening of bids.



as-built quantity - ANSWERS The quantity of a completed Item eligible for payment



authorized funding amount - ANSWERS The amount of funds authorized by the Department for
the Contract



Bidder - ANSWERS The individual, firm, partnership, corporation, joint venture, or any
acceptable combination thereof that submits a bid to the Department.



bridge - ANSWERS . A structure, other than a culvert, including supports, erected over a
depression or an obstruction, such as water, highway, or railway, and having a track or
passageway for carrying traffic or other moving loads and having a length 3 measured along the
center of the structure of more than 20 feet between undercopings of abutments or extreme
ends of openings for multiple boxes. Structure dimensions are defined as follows:

, bridge length - ANSWERS The overall length measured along the line of survey stationing from
back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor;
but, in no case less than the total clear opening of the structure



bridge width - ANSWERS The clear width measured at right angles to the longitudinal centerline
of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between
the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or
railing



Change Order. - ANSWERS A written order issued by the Department to the Contractor after
execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2.
Modifications in the basis of payment. 3. Modifications to Contract Time.



Commercially Useful Function - ANSWERS Occurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract and carrying out its
responsibilities by actually performing, managing, and supervising the work involved, and with
respect to materials and supplies used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.



Completion - ANSWERS When all of the following have occurred: 1. The Work has been
satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use
by the Department as required by the Contract. 3. The Contractor has satisfactorily executed
and delivered to the RE all documents, certificates, and proofs of compliance required by the
Contract including the Notice of Completion.



construction operations - ANSWERS Physical work done in the performance of the Contract
within the Project Limits. Does not include off-site mobilization, procurement and off-site
storage of materials and plants, engineering, performance bond and payment bond, surveys,
working drawings, off-site field offices, schedules, certificates, forms, or documents
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
norajuma13 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
239
Miembro desde
2 año
Número de seguidores
165
Documentos
3523
Última venta
1 mes hace
EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Manageme

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Lee mas Leer menos
3.4

46 reseñas

5
19
4
6
3
5
2
8
1
8

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes