Who is responsible for the administration of their cognizant TAG-OUT log? - ANSWER-
Authorizing Officer
What program is used to generate information for maintenance data system (MDS)? -
ANSWER-OMMS-NG
What can go in the location block of an MRC? - ANSWER-See LGL, see EGL, location
of equipment
Who is responsible for placing the work center in revise mode to ensure oversight? -
ANSWER-LCPO
In SKED in order to X or mark a check as complete, what mode must SKED be in? -
ANSWER-Maintenance view
What is an AER and how often are they conducted? - ANSWER-Administrative
Effectiveness Review. Quarterly
When entering a 2k in OMMS-NG, what minimum information is required? - ANSWER-
All items with a red check by them
What does IEM stand for? - ANSWER-Inactive Equipment Maintenance
What can be used in SKED to verify what part of a MIP is carried by a fellow work
center for split MIP and other purposes? - ANSWER-LOEP Manager
What must you bring when you are trying to order a DLR? - ANSWER-DLR(or RIP
Chit), RPPO Log, 2K
An advanced change Notice is received when? - ANSWER-Whenever a change has
been implemented to an existing maintenance requirement
Which document is used to provide shipboard maintenance managers with a
consolidated listing of deferred maintenance to identify material condition of the ship? -
ANSWER-CSMP
Who is the designated person designed to mark the weekly PMS schedule to indicate
that a PMS check has been completed? - ANSWER-Work center supervisor (WCS)
, What is a SCAT code? - ANSWER-A code used to identify test equipment
The cent sign when displayed on the quarterly board indicated what about the MR? -
ANSWER-MR was satisfied by a higher level test
When should equipment be placed in IEM status II? - ANSWER-Equipment is not going
to be used for 7 days or more and is scheduled for overhaul, repair or removal from safe
storage.
Which maintenance action prepares the equipment for periods of prolonged idleness
and are usually performed only once at the beginning of the inactive period? -
ANSWER-Lay-up maintenance
Which status of IEM can equipment leave the ship? - ANSWER-II
Who is responsible for ensuring the CSMP accurately describes the material condition
of the work center? - ANSWER-Work Center Supervisor
Who must initial all line-out and changes on MIPS/MRC? - ANSWER-LCPO/Dept.
LCPO
When are caution tags to be used? - ANSWER-When temporary instructions exist
indicate an unusual actions must be taken
Who may sign for completion of maintenance completion if the outside activity
responsible is unavailable? - ANSWER-Ship maintenance + Material Officer
What is required when placing equipment in status II IEM? - ANSWER-Valid reason,
JSN, Applicable LU check, Letter from Dept. Head
Who maintains 13 weeks of equipment validation? - ANSWER-3-MC
A check note entry must be made on the accountability sheet for what PMS checks? -
ANSWER-Out of periodicity, Reschedule, re-schedule, not applicable, accomplished y
higher authority
To perform an equipment validation you must first do what? - ANSWER-Verify perform
an equipment item exists by opening the item in OMMS-NG
What is OPNAVINST 4790.8C? - ANSWER-Ship's Maintenance and Material
Management manual (3M manual)
Which view on SKED allows the user to view line-outs on (MIPSs)? - ANSWER-PMS
Documents