General Types of Construction Surveys - ANSWER Pipeline stakeout

Building stakeout

Highway stakeout

Basic Method for Construction Surveys - ANSWER Placement of horizontal and vertical
control

Topographic survey

Staking out the design

Periodic checks on the design layout while under construction

Final as-built survey of the project

Horizontal and Vertical Control points should be - ANSWER Located conveniently for
use and clearly marked

Far enough from the actual construction to avoid possible destruction of the stakes

Suitable for securing the accuracy agreed on for the construction layout

Storm sewers - ANSWER Grade of at least 0.5%

Sanitary sewers - ANSWER Steeper grade than storm sewers

Staking out a Pipeline (without GPS) - ANSWER Use of batter boards or laser beams to
guide alignment and vertical placement of the pipe

Surveyor places offset stakes along pipeline trench

Staking out a Pipeline with use of a laser device - ANSWER The beam is oriented along
the pipe's planned horizontal alignment and grade, then the trench is opened

The laser is then used like the top of the batterboard with a measuring stick to check the
elevation of the invert

Staking out a Building - ANSWER Use of batter boards must be set far enough out of the
way of the building corners

A couple of benchmarks should be set outside the construction limits but within easy
sight distance

it is Important when Staking out a Building to - ANSWER Ensure vertical alignment,
especially on multi-story buildings

,Best to check vertical alignment with two set-ups from positions that are perpendicular
to each other

Also check in direct and reversed positions to cancel out errors from the instrument not
being in good adjustment

Staking out Highways, Canals, Railroads - ANSWER Staking will begin on the centerline
and placed at full stations (100-ft intervals) until an alignment change at a point of
intersection

After the initial centerline staking, PC's and PT's are located and staked as well as any
POT's

Points must be referenced so they can be found again once construction has started

Then the right of way is staked at every change in width, all changes in alignment, and
sufficient other points

When Staking out Highways, Canals, Railroads - ANSWER several benchmarks are
typically placed on the right of way so they are not destroyed and can be referenced
again

finally the construction limits are staked

Slope stakes - ANSWER Stake marking the cut/fill at that location

Slope intercepts - ANSWER Intersection of the original ground and the side slope

Grade stakes - ANSWER Set at points that have the same ground and grade elevation

Blue tops - ANSWER Stake set at the actual grade elevation at that location, then
painted blue on top

Errors in Construction Surveys - ANSWER Inadequate number/location of control points

Errors in establishing control

Observational errors in layout

Failure to double-center in laying out angles or extending lines and failure to check
vertical members by plunging the instrument

Careless referencing of key points

Movement of stakes and marks

Public lands - ANSWER Lands that are subject to the administration, survey, and
transfer of title to private owners under the public land laws of the United States since
1785

US Bureau of Land Management is responsible for - ANSWER surveying and managing

, these surveys

Part of Dept. of Interior

Formerly managed by Dept. of Treasury

How many states constitute the public land survey states? - ANSWER 30 states

Public Land Survey System (PLSS) - ANSWER Started in 1784

Territory immediately northwest of the Ohio River was first to be surveyed

Standard unit of measure for PLSS is - ANSWER chains

1 chain (ch) = - ANSWER 4 rods

80 ch = - ANSWER 1 mile

10 square chains (ch2) = - ANSWER 1 acre

1 chain is - ANSWER 66 feet long (100 links)

1 link = - ANSWER 0.66 feet = 7.92 inches

Lengths are recorded in - ANSWER chains and links or as a decimal

The Basic Rules of Survey (1973) - ANSWER Public lands shall be divided by north and
south lines run according to true meridian (Principal Meridian)

PLSS Township Corners will be - ANSWER marked and each mile marked differently

The township will be divided into sections, containing - ANSWER 640 acres (as close as
possible)

Sections will be numbered consecutively starting at the northeast section and
proceeding - ANSWER west and east alternately



Subdivisions in Public Surveys Division into quadrangles (tracts) approximately -
ANSWER 24 mi on a side



Division of quadrangles into townships (16), - ANSWER approximately 6 mi on a side



Division of townships into sections (36) - ANSWER approximately 1 mi square



subdivision of sections - ANSWER usually by local surveyors

Información del documento

Subido en
2 de abril de 2025
Número de páginas
17
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Zayla
3.4
(18)
Vendido
121
Seguidores
13
Artículos
15797
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes