GCSS-Army Watercraft in GCSS-Army Test 1
GCSS-Army Watercraft in GCSS-Army Test 1 1. When creating an OBSL work order, the 4 low priority list item is selected. b. FALSE 2. When a change is made to the OBSL BOM, a new XML file is received into GCSSArmy via the ______, which results in an update to the existing OBSL BOM. d. SAP Business Workplace 3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information from the ______ to GCSS-Army. b. Logistics Support Vessel (LSV) 4. When installing equipment a(n) _____notification must be created. b. D1 Notification 5. The intent of the OBSL work order is to be able to compare the OBSL material requirement quantities with the ______. a. On-hand material quantities 6. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft vessel ______. c. Advanced Shipment Notification (ASN) Number
Escuela, estudio y materia
- Institución
- GCSS-Army Watercraft in GCSS-Army
- Grado
- GCSS-Army Watercraft in GCSS-Army
Información del documento
- Subido en
- 31 de marzo de 2025
- Número de páginas
- 3
- Escrito en
- 2024/2025
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
gcss army watercraft in gcss army test 1
Documento también disponible en un lote