100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Wastewater Exam Class C 59 Questions and Answers verified 2025.

Puntuación
-
Vendido
-
Páginas
13
Grado
A
Subido en
31-03-2025
Escrito en
2024/2025

Wastewater Exam Class C 59 Questions and Answers verified 2025.

Institución
Water Wastewater
Grado
Water wastewater









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Water wastewater
Grado
Water wastewater

Información del documento

Subido en
31 de marzo de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Wastewater Exam Class C 59 Questions and Answer aq aq aq aq aq aq aq




s verified 2025
aq aq




The Activated Sludge Process:
aq aq aq




A. requires preaeration
aq aq




B. requires Activated Carbon
aq aq aq




C. is an aerobic biological process.
aq aq aq aq aq




D. Usually precedes primary sedimentation.
aq aq aq aq




E. Requires 50% by volume old sludge to work effectively. -
aq aq aq aq aq aq aq aq aq aq aq




✅ C. Is an Aerobic biological process
aq aq aq aq aq aq aq




A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc leaving th
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




e clarifier. One way to correct this problem is to :
aq aq aq aq aq aq aq aq aq aq




A. Increase the RAS Flow
aq aq aq aq




B. Reduce Wasting Rates
aq aq aq




C. Increase dissolved oxygen levels.
aq aq aq aq




D. Increase the F/M ratio by wasting more
aq aq aq aq aq aq aq




E. Increase the sludge age by wasting less. -
aq aq aq aq aq aq aq aq aq




✅ D. Increase the F/M Ratio by Wasting More
aq aq aq aq aq aq aq aq aq




Which of the following flow rates should be measured if the operator is to control plant properly?
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




A. Aeration rate or resulting dissolved oxygen level.
aq aq aq aq aq aq aq




B. Influent or effluent.
aq aq aq




C. return sludge
aq aq




D. waste sludge
aq aq




E. all the above -
aq aq aq aq aq




✅ E. all the above
aq aq aq aq aq

, During start up your aeration tank produces excessive amounts of billowing white foam. This can be co
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




rrected by: aq




A. Doing nothing, it will go away in a few hours
aq aq aq aq aq aq aq aq aq aq




B. Increasing the sludge wasting rate
aq aq aq aq aq




C. Seeding the process with sufficient good quality sludge
aq aq aq aq aq aq aq aq




D. Spraying water on the foam until it is gone
aq aq aq aq aq aq aq aq aq




E. Taking a weeks vacation -
aq aq aq aq aq aq




✅ C. Seeding the process with sufficient good quality sludge
aq aq aq aq aq aq aq aq aq aq




In solving an operational problem at a treatment plant:
aq aq aq aq aq aq aq aq




A. there is almost always a good technical solution. It may require considerable experience and time to
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




learn whaat it is.
aq aq aq aq




B. Human errors have to be corrected since the operator is at fault.
aq aq aq aq aq aq aq aq aq aq aq aq aq




C. don't let the laboratory personnel influence you're judgement as to what the best solution is.
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




D. standard textbooks in sanitary engineering are the best source of information.
aq aq aq aq aq aq aq aq aq aq aq aq




E. It is best to do nothing until the TNRCCC sends a violation notice. -
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




✅ A. there is almost always a good technical solution. It may require considerable experience and ti
aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq aq




me to learn whaat it is.
aq aq aq aq aq




When the return sludge rate is too low, what happens?
aq aq aq aq aq aq aq aq aq




A. the aeration tank will not fill
aq aq aq aq aq aq




B. There will be insufficient organisms to treat the wast load entering the aeration basin
aq aq aq aq aq aq aq aq aq aq aq aq aq aq




C. the activated sludge in the aerator will starve.
aq aq aq aq aq aq aq aq




D. the sludge blanket in the secondary clarifier could become too high.
aq aq aq aq aq aq aq aq aq aq aq




E. B and D -
aq aq aq aq aq




✅ E. B and D
aq aq aq aq aq




What factors affect how well the mixed liquor suspended solids settle in the final clarifier?
aq aq aq aq aq aq aq aq aq aq aq aq aq aq
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
academicmaster Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
770
Miembro desde
5 año
Número de seguidores
676
Documentos
5989
Última venta
1 mes hace
MIDTERM & FINALS

Get all latest Quizzes, Test Banks, Midterm and Final Exams. Ace your Exams with My Papers Guaranteed to help you score A in everything.

3.9

111 reseñas

5
60
4
16
3
16
2
7
1
12

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes