USATCES has submitted your ESSP for final approval. Who did they submit
to? - DDESB
What is the minimum distance permitted between an A&E location and the
installation headquarters building? - Inhabited Building Distance (IBD)
What is the minimum distance permitted between a PES and an interstate
highway? - Public Traffic Route Distance (PTRD)
What is the minimum distance permitted between any two operating
buildings and sites within an operating line? - Intraline Distance (ILD)
What is the minimum distance permitted between an earth-covered
magazine and a nearby above-ground magazine? - Intermagazine
Distance (IMD)
What do you call the collection of documents that identifies the
relationship between a PES and any facilities or personnel who may be
exposed to the PES? - ESSP
Your installation is putting a new roof on an existing PES facility. Do
you need to complete an ESSP? - No, this type of change does
not require one
, Your 2installation 2is 2changing 2the 2NEW 2of 2an 2existing 2facility 2and 2will 2be
2storing 2a 2hazard 2division 2not 2previously 2approved 2in 2it. 2Do 2you 2need 2to
2complete 2an 2ESSP? 2- Yes,
2and 2it 2must 2be 2approved 2by 2the 2DDESB
Which 2of 2the 2following 2is 2a 2phase 2of 2the 2ESSP 2process? 2-
Development
2and 2Evaluation
How 2many 2ESSP 2categories 2are 2there? 2- Five
how 2must 2the 2ESSP 2package 2be 2submitted? 2- Electronically
Which 2three 2items 2are 2in 2the 2Maps 2and 2Drawings 2section 2of 2an 2ESSP
2package? 2- 2Facilities 2maps
Installation
2maps 2Site
2maps
Which 2three 2items 2are 2included 2in 2the 2Evaluations 2section 2of 2an 2ESSP
2package? 2- 2Electrical 2installation
Lightning 2protection 2information
2Glass 2hazard 2risk 2assessment
What 2part 2of 2the 2ESSP 2package 2contains 2background 2information, 2site
2location, 2and 2reason 2for 2the 2ESSP? 2- ESSP 2narrative
Who 2has 2ultimate 2approval 2authority 2for 2an 2ESSP? 2- DoD 2explosives
2Safety 2Board 2(DDESB)
The 2purpose 2of 2an 2Expedited 2Approval 2Request 2is 2to 2- Justify 2why 2an
2expedited 2approval 2is 2required
Which 2four 2items 2are 2required 2on 2installation 2maps? 2- Installation 2boundaries
Roads 2and 2railways
Waterways 2and 2ponds
Facilities 2and 2associated 2utilities
Which 2of 2these 2is 2a 2site 2map 2requirement? 2- Scale 21 2in 2= 2400 2ft
Which 2four 2items 2are 2required 2parts 2of 2the 2Transmittal 2Memorandum? 2-
Applicable 2explosives 2safety 2references
Site 2location