questions and answer
Your 2installation 2is 2refurbishing 2an 2existing 2PES 2facility 2built 2in 21968. 2Do
2you 2need 2to 2complete 2an 2ESSP? 2- Yes, 2and 2it 2requires 2DDESB
2approval.
As 2distance 2from 2the 2potential 2explosion 2site 2decreases, 2the 2potential 2for
2damage 2to 2an 2exposed 2site 2from 2an 2explosion.... 2- increases.
Your 2installation 2is 2increasing 2the 2NEW 2for 2a 2storage 2site 2built 2in 21969
2and 2storing 2a 2hazard 2division 2that 2was 2not 2previously 2approved 2for
2that 2location. 2Do 2you 2need 2to 2complete 2an 2ESSP? 2- Yes, 2and 2it
2requires 2DDESB 2approval.
Intraline 2distance 2(ILD) 2is 2the 2minimum 2distance 2permitted 2between... 2-
two
2operating 2buildings.
The 2purpose 2of 2an 2ESSP 2is 2to 2ensure 2safety, 2provide 2specifications, 2and... 2-
establish 2limits.
You 2must 2submit 2an 2ESSP 2for 2DDESB 2approval 2if 2the 2installation 2is... 2-
building 2an
2ES 2within 2an 2existing 2ESQD 2arc.
Failing 2to 2submit 2a 2successful 2ESSP 2may 2result 2in... 2- reduced 2operational
2capacity.
Which 2are 2the 2phases 2of 2the 2ESSP 2process 2in 2order? 2- Development 2and
2Evaluation, 2Submission, 2DDESB 2Review, 2and 2Implementation.