100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

DBIA: Principles of Design-Build and Post Award & Contracts Questions and Answers 100% Solved

Puntuación
-
Vendido
-
Páginas
18
Grado
A+
Subido en
27-03-2025
Escrito en
2024/2025

DBIA: Principles of Design-Build and Post Award & Contracts Questions and Answers 100% Solved Cost Plus Fee Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage GMP (Guaranteed Maximum Price) Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount.

Mostrar más Leer menos
Institución
DBIA ....
Grado
DBIA ....

Vista previa del contenido

DBIA: Principles of Design-Build and Post
Award & Contracts Questions and Answers
100% Solved

Cost Plus Fee Contract Format - contractor reimbursed for actual cost plus an agreed

upon percentage




GMP (Guaranteed Maximum Price) Contract Format - Combines Cost-Plus & Lump-Sum,

contractor reimbursed for actual cost plus a fee only up to a certain amount.




Unit Price Contract Format - cost per piece




Target Price Contract Format - established cost/benchmark determined jointly by project

team.




Trust, Flexibility Successful Design Build requires _____ & _______ between participants

,Hammurabi Singular responsibility for both design & construction was first codified by

____




Bridging Documents Owner provided items such as 20% design or more and provides

prescriptive specs at RFP.




Spearin Doctrine Owner is responsible for implied warranties in the sufficiency of the

specifications.




Performance Requirements ____ ____ should identify end results.




Design Build Single point of responsibility for both design & construction is an attribute of

what delivery method?




Substantiation The process of checking milestones along the way for completeness.




Prescriptive Owner requiring specific products or methods be instituted by DB team in

order to achieve desired performance.

, False T/F Detailed estimating is the Building systems approach to estimating




False T/F feasibility estimate is cost model and establishes budget for project




True T/F key element of quality assurance is keeping communication lines open between

owner and DB




True T/F in Design/cost relationship of DB, the constructor establishes design parameters

for architect




False T/F trust is most important thing for DB




Schematic estimating DB estimating sequence where 15%-20% of design is completed




Trend logs Provides baseline budgets and schedules and list estimate trends

Escuela, estudio y materia

Institución
DBIA ....
Grado
DBIA ....

Información del documento

Subido en
27 de marzo de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ARVEX

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
ARVEX stuvia
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
10 meses
Número de seguidores
0
Documentos
2867
Última venta
2 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes