False Questions with Complete Solutions
A feasibility estimate established whether the project and scope of work is economically and
financially within the client's means. True
The best time to employ value engineering is after the design is complete. Flase
"Choosing by Advantages" is an evaluation process sed to select between options by
considering both the advantages and disadvantages of any given solution. False
The MasterFormat estimate framework is best suited to design-build. False
The owner is responsible for coming up with the performance requirements and criteria in
design-build. True
Contingencies go up as the amount of design completion goes up. False