100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Category 3 Non-Cab Operated Test Questions and Correct Solutions Graded A+.

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
24-03-2025
Escrito en
2024/2025

Category 3 Non-Cab Operated Test Questions and Complete Solutions Graded A+ Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes - Answer: Category 2 The expiration date that is of particular importance to crane operators is - Answer: The certification expiration date of the crane Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness - Answer: crane operator A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. - Answer: Category 3 Components that control, restrain, or position the load, and upon failure would cause dropping, shifting or uncontrolled movement of the loads are ____________. - Answer: load controlling parts All of the following require a license to operate EXCEPT a: - Answer: Non-cab operated category 3-bridge crane What is two-blocking and why is two-blocking dangerous? - Answer: Two-blocking occurs when the hook block comes in contact with the upper sheave block during hoisting of the hook. It is dangerous because it could result in damage to the crane, parting of the hoist lines, and dropping the load. The formula for determining the area of a triangular shaped object is: - Answer: Base x Height divided by 2 When are operators required to perform a pre-use check of the crane? - Answer: Prior to the first use of the crane each day. Regardless of the method of communication used all crane signals must be ____________________. - Answer: clear Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees Fahrenheit. - Answer: True If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object? - Answer: 120 cubic feet Is it necessary for the operator to see the load or work area? - Answer: Not if there is a designated signal person who is in control of the lift and is in view of the operator, or if the signal giver is in constant radio contact with the operator. What is "inching"? - Answer: Performing a motion very slowly, a little at a time The majority of crane accidents are attributed to which of the following? - Answer: Personnel error Crane operators at naval activities may be required to operate various types of cranes for which they hold a license. Which of the following can best assure operator proficiency and safety? - Answer: Be familiarized by a qualified person before operating the crane for the first time Which of the following is NOT an acceptable method of communication between the signal person and the crane operator? - Answer: Signal Flags Which of the following is used with a physical locking device placed at the energy source? - Answer: Lockout Tag Which of the following is considered to be the best way the operator can ensure the crane is safe to operate on any given day? - Answer: Perform Daily Pre-use Checks When crane accidents happen, you must do all of the following EXCEPT: - Answer: Continue to operate the crane until all lifts are completed Components that provide protection for operation and maintenance personnel working on or in the path of cranes. - Answer: General Safety Devices If the crane operator and the rigger in charge disagree on whether or not a load is safe to lift the operator should: - Answer: not operate the crane until contacting the supervisor to resolve the issue. Components that support the load, and upon failure would cause dropping or uncontrolled lowering of the load are ____________. - Answer: load bearing parts What is meant by "skewing"? - Answer: Where one end of the bridge gets ahead of the other end, frequently causing binding on the rails. What are the principal parts of an overhead traveling crane? - Answer: Bridge girders, end trucks, trolley, and operator's cab or pendant control Why shall sudden starts and stops of the bridge and trolley be avoided? - Answer: Sudden starts and stops could cause the trolley or bridge to derail Select the proper method of landing a load. - Answer: Lower the load slowly, stop a few inches from the landing point, then slowly lower the rest of the way. The crane operator must check the certification information on the crane for________ before operating the crane. - Answer: certification expiration date, crane ID, and certified capacity What is the bridge crane communications hand signal pictured, with the palms up, fingers closed; thumb pointing in the direction of motion, and jerking horizontally? - Answer: Trolley travel At what point during a lift may trolley or bridge travel be started? - Answer: When the tracks are clear and the load is high enough off the ground to pass over obstacles safely What is the crane communications hand signal pictured, with the arm extended downward, forefinger pointing down, and moving the hand in a small horizontal circle? - Answer: Lower Why should the hook be positioned directly over the load when attaching the load? - Answer: To avoid side loading and dragging the load as it is picked up Bridge cranes with rated capacities of less than 20,000 lbs. are classified as ______ cranes. - Answer: Category 3 More than one signal person may provide signals to a crane operator at a time. - Answer: False What is the crane communications hand signal pictured, with the arm extended, palm down, moving the arm back and forth horizontally? - Answer: Stop A crane accident occurs when any element of the crane operating envelope fails to perform correctly during crane operations, maintenance, or testing which could result in any of the following EXCEPT: - Answer: NOT Two-Blocking or overload NOT Personnel Injury or Death Equipment malfunction Common modes of operation for typical OET bridge cranes are: - Answer: hoist, trolley, and bridge. The crane operator is responsible for the pre-use ________ of the crane. - Answer: check Shackles, wire rope slings, and /or eyebolts, may be used to their full capacity when used within ____ of vertical. - Answer: 5° Which of the following formulas would be used to find the volume of a rectangular or square shaped 3 dimensional object? - Answer: Length X width X height What should be done when leaving a crane at the end of the work shift? - Answer: Raise blocks into the upper limit switch Ensure all controls are in the neutral or "off" position Position the crane away from boarding platforms Secure power The crane operator STOPS the crane whenever ________ is in question. - Answer: safety What is the purpose of a hoist limit switch? - Answer: To prevent overtravel of the hook block and the possibility of two-blocking Knowing the load's approximate center of gravity prior to rigging or lifting a load is important: - Answer: All of the Above What is the operator's main concern during crane operations? - Answer: Operating safely Who can remove a danger, caution, or lockout tag? - Answer: NOT All crane maintenance personnel The person who attached the tag or his or her supervisor when they are not available New shackles put into the weight handling equipment program are required to have all of the following markings on, or attached to the shackles EXCEPT: - Answer: Date of Manufacture How should an operator check the hoist brakes when lifting a load? - Answer: Lift the load a few inches off the ground and stop hoisting to ensure there is no slippage of the brakes. What are the actions required if an asterisked item on the ODCL is found unsatisfactory during the pre-use check of the crane? - Answer: Stop operation and notify engineering of the deficiency. What is the crane communications hand signal pictured, with both arms extended, palms down, moving arms back and forth horizontally? - Answer: Trolley travel If an object is 6 feet long, 4 feet wide, and 2" thick, what is the area of the object? - Answer: 24 square feet What signal may an operator obey from a person other than the designated signal giver? - Answer: Stop or Emergency Stop When should a tagline be used during lifting operations? - Answer: To prevent the load from swinging or rotating What is "plugging"? - Answer: The use of reverse power instead of a brake to slow or stop the bridge or trolley travel When making two-hook lifts, the capacity of __________ MUST NOT BE exceeded at any time. - Answer: either hook Crane Operators are responsible for all of the following EXCEPT: - Answer: Slowing down when signals are unclear Components that affect the safety and capability of the WHE, by stopping or limiting the operation when activated are __________________. - Answer: operational safety devices What is the minimum amount of rope that shall be on a grooved drum and a smooth drum? - Answer: 2 full wraps, 3 full wraps While performing a pre-use check, the operator must check the wire rope system for all of the following EXCEPT: - Answer: Size and grade of wire rope While performing a monthly ODCL on a crane you find minor deficiencies. What do you do? - Answer: Note the deficiencies on the ODCL A pillar-Jib crane with a capacity of 22,000 lbs. is a __________ crane. - Answer: Category 2 Which of the following tags prohibits operation of equipment when its operation could jeopardize the safety of personnel or endanger equipment? - Answer: Danger Tag Which of the following identify the two categories of crane lifts? - Answer: Complex and Non-Complex What is the weight of a 24 sq ft, 2 inch thick aluminum plate with a unit weight is of 15 lbs. per square foot of material per inch of thickness? - Answer: 720 lbs. When is it permissible for an operator to leave the controls of a crane while a load is suspended from the hook? - Answer: The operator shall remain at the controls at all times while a load is suspended from the hook. Sling angles affect the actual stress on each leg of the sling. Lowering the angle measured from the horizontal will: - Answer: increase the stress on each leg. What is the crane communications hand signal, pictured, with the arm vertical, forefinger pointing up, moving the hand in small horizontal circle? - Answer: Hoist What may cause the bridge to skew? - Answer: Wheel slippage on one side only because of a slippery track, or a heavy load suspended from one end of the bridge Which tag alerts operators to special instructions for operating the equipment? - Answer: Caution Tag Taking the slack out of rigging and starting to move a load or empty hook should be performed in first hoisting position or at the slowest possible speed. - Answer: True What should an operator do if he/she is not sure of the meaning of a signal? - Answer: Stop operation until the meaning of the signal is understood If an object has a volume of 200 cubic feet. and the unit weight is 150 lbs. per cubic foot, what is its weight? - Answer: 30,000 lbs. What is the bridge crane communication hand signal pictured, with the arm extended forward, hand open and slightly raised, making a pushing motion? - Answer: Bridge travel

Mostrar más Leer menos
Institución
CATEGORY 3 NON-CAB OPERATED
Grado
CATEGORY 3 NON-CAB OPERATED









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CATEGORY 3 NON-CAB OPERATED
Grado
CATEGORY 3 NON-CAB OPERATED

Información del documento

Subido en
24 de marzo de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Category 3 Non-Cab Operated Test
Questions and Complete Solutions
Graded A+
Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes - Answer:
Category 2



The expiration date that is of particular importance to crane operators is - Answer: The certification
expiration date of the crane



Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness - Answer:
crane operator



A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. - Answer: Category 3



Components that control, restrain, or position the load, and upon failure would cause dropping, shifting
or uncontrolled movement of the loads are ____________. - Answer: load controlling parts



All of the following require a license to operate EXCEPT a: - Answer: Non-cab operated category 3-bridge
crane



What is two-blocking and why is two-blocking dangerous? - Answer: Two-blocking occurs when the hook
block comes in contact with the upper sheave block during hoisting of the hook. It is dangerous because
it could result in damage to the crane, parting of the hoist lines, and dropping the load.



The formula for determining the area of a triangular shaped object is: - Answer: Base x Height divided by
2



When are operators required to perform a pre-use check of the crane? - Answer: Prior to the first use of
the crane each day.

, Regardless of the method of communication used all crane signals must be ____________________. -
Answer: clear



Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees Fahrenheit. -
Answer: True



If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object? - Answer: 120
cubic feet



Is it necessary for the operator to see the load or work area? - Answer: Not if there is a designated signal
person who is in control of the lift and is in view of the operator, or if the signal giver is in constant radio
contact with the operator.



What is "inching"? - Answer: Performing a motion very slowly, a little at a time



The majority of crane accidents are attributed to which of the following? - Answer: Personnel error



Crane operators at naval activities may be required to operate various types of cranes for which they
hold a license. Which of the following can best assure operator proficiency and safety? - Answer: Be
familiarized by a qualified person before operating the crane for the first time



Which of the following is NOT an acceptable method of communication between the signal person and
the crane operator? - Answer: Signal Flags



Which of the following is used with a physical locking device placed at the energy source? - Answer:
Lockout Tag



Which of the following is considered to be the best way the operator can ensure the crane is safe to
operate on any given day? - Answer: Perform Daily Pre-use Checks



When crane accidents happen, you must do all of the following EXCEPT: - Answer: Continue to operate
the crane until all lifts are completed
$14.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
YourExamplug Grand Canyon University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
172
Miembro desde
1 año
Número de seguidores
26
Documentos
14379
Última venta
5 días hace
Your Exm Plug

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Lee mas Leer menos
4.3

67 reseñas

5
38
4
16
3
7
2
4
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes