Complete Solutions Graded A+
Ture or False? As crane signaling is only a basic function and the signal person knows where the loads
will be positioned, training or testing of the signalperson should not be required. - Answer: False
When using hand signals to direct a crane operator, an extended arm with the with the thumb vertical
and the fingers opening and closing into a fist indicates: - Answer: raise boom and lower load.
Two closed fists with both thumbs pointing toward each other is a signal for : - Answer: Retract hydraulic
boom
Which of the is not a permitted use of an "operational aid"?
warn of approaching two-block condition
indicates changing boom angle
warns of approaching crane overload
used to test weigh a load prior to hoisting - Answer: used to test weigh a load prior to hoisting
T.F. Any crane component can be used on any other crane made by the same company. - Answer: False
A rough terrain crane is commonly referred to as:
1. mobile crane
2. crawler crane
3. carrier crane
4. cherry picker - Answer: cherry picker
Which of these conditions could be dangerous when operating a crane around a newly constructed
building?
1. height of structure
2. uncompacted soil
, 3. protected pedways
4. compacted soil - Answer: uncompacted soil
When hoisting on outriggers with a permitted 360 degree swing, which position is the most hazardous in
most conditions?
1. over front
2. over rear
3. over side
4. over corner - Answer: 4. over corner
T.F. The ground pressure under outriggers is higher than it is under a crawler track because of the
smaller bearing surface. - Answer: True
An outfigger float should be approximately how much larger than the outrigger pad?
1. same
2. 1.5 times
3. 2 time
4. 3 times - Answer: 4. 3 times
When setting up a crawler crane for use on a new site, which of the following is not required prior to
use?
1. operator manual and service manual
2. inspected components
3. crane logbook
4. name of the person who will operate the crane - Answer: 4. name of the person who will operate the
crane.
Where should the slings be attached when lifting lattice boom sections?
1. use the end connections
2. choke at the mid-point of the main chords