100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

LP INSTALLERS PRACTICE EXAM QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
22-03-2025
Escrito en
2024/2025

LP INSTALLERS PRACTICE EXAM QUESTIONS AND ANSWERS

Institución
Lp Installers
Grado
Lp installers









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Lp installers
Grado
Lp installers

Información del documento

Subido en
22 de marzo de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

LP INSTALLERS PRACTICE EXAM QUESTIONS AND
ANSWERS
Where do you file a permit for work to be done in buildings owned or used by the State
of Mass ? - Answers :State Inspector

When pressure testing a system over 1 million btu , which doesn't apply ? - Answers
:Test 1 hour for each 200 ' of developed length

When a vent on a regulator , what is the horizontal distance from the discharge of the
vent to an opening located below ? - Answers :3 feet

How many cycles do you need to keep continuing education certificates ? - Answers :3

On an LP - Gas system , what is considered to be the " Point of Delivery " ? - Answers
:Outlet of 1st stage

How fast does a spill switch need to work ? - Answers :30 seconds

If the firing rate in a combustion chamber exceeds 1,000,000 BTU , but less than
5,000,000 , what is required ? - Answers :2 shut offs in series , or one with overtravel
interlock

What is the maximum pressure allowed for CSST . - Answers :14 " WC

If the maximum firing rate per combustion chamber is ____ , BTU or greater , gas
pressure supervision provided by listed pressure switches or combination high / low
switch , interlocked to accomplish safety shutdown in event of either high or low
pressure . - Answers :1,000,000

Max spacing for support for CSST on a rooftop is every . - Answers :Blocks used for
Support 48 "

A vacuum is considered to be any pressure that is - Answers :Less than atmospheric
pressure (14.7 psi)

If an UG gas line runs under a building , what is required ? - Answers :Conduit must
terminate outside building ,Sleeved in same material as pipe Terminate 4 ' above grade

Apprentice plumber , apprentice gas fitter , or MA Lic . LP Installer - Answers :Must
show license when asked by the Inspector

What is not an acceptable material for LPG piping - Answers :Butylenes

, How far above a forced air inlet must a vent be terminated it within 10 ft horizontally ? -
Answers :3 '

Can you vent into a mechanical vent under a positive pressure ? - Answers :no

What is not an acceptable material for LPG piping ? - Answers :Galvanized

How far above the floor must you have an opening for make - up air ? - Answers :< 12 "

How far can a relief discharge from a rigid LP gas regulator from a Building Opening
below discharge ? - Answers :3'

Which method is not an approved method of connecting pipe ? - Answers :Soldered

When using gas pressure boosters , which of the following apply ? - Answers :All must
meet product - acceptance requirements The serving gas supplier has provided written
authorization Gas pressure boosters shall be located in well - ventilated spaces , and
readily accessible

What percentage of vent height can the length of a single - walled vent connector be ? -
Answers :75 %

What percentage of vent height can the length of Type B , double - walled vent
connector be ? - Answers :100 %

What is the max pressure for natural gas in a house ? - Answers :14 " WC

Within how many feet of an appliance does the shut off need to be ? - Answers :6'

How far does a roof hatch need to be from the edge of a roof to not need guardrails ? -
Answers :6'

Vent termination above a public walkway needs to terminate how high above grade ? -
Answers :7 '

Decorative gas appliance in a vented fireplace must have ? - Answers :Screen door

When opening / adding to a gas system who must be notified prior to commencing work
? - Answers :Local Inspector

When there is suspicion of a defect in the piping system , you must ____ - Answers
:Perform test on system ✓

Installation of fuel gas utilization equipment over BTUs / hr per combustion chamber
shall be governed by 248 CMR 7.00 : Large Gas Utilization Equipment . - Answers
:400,000
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Greaterheights Birkbeck, University of London
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1126
Miembro desde
3 año
Número de seguidores
880
Documentos
18641
Última venta
1 día hace

4.1

218 reseñas

5
120
4
43
3
24
2
10
1
21

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes