Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

COB 300 OPERATIONS FINAL EXAM QUESTIONS WITH CORRECT ANSWERS

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

COB 300 OPERATIONS FINAL EXAM QUESTIONS WITH CORRECT ANSWERS

Vista previa del contenido

COB 300 OPERATIONS FINAL EXAM
QUESTIONS WITH CORRECT ANSWERS
Types of variability - Answer-arrival variability, request variability, capability variability,
effort variability, subjective preference variability

More accommodation - Answer-more cost

Less accommodation - Answer-less satisfaction

Behavioral science in service encounters - Answer-1. the front-end and back-end of the
encounter are not created equal
2. segment the pleasure, combine the pain
3. Let the customer control the process
4. Pay attention to norms and rituals
5. People are easier to blame than systems
6. Let the punishment fit the crime in service recovery

Service Guarantees as Design Driver - Answer-1. any guarantee is better than no
guarantee
2. involve the customer as well as employees in the design
3. do not quibble or wriggle when a customer invokes a guarantee
4. make it clear that you are happy for customers to invoke the guarantee

Service blueprinting & Fail-safing - Answer-unique feature is the distinction between
high customer contact aspects of the service and those activities the customer does not
see (made by "line of visibility"

Dimensions of product quality - Answer-performance, aesthetics, special features,
conformance, reliability, durability, perceived quality, serviceability, consistency

Dimensions of service quality - Answer-convenience, reliability, responsiveness, time,
assurance, courtesy, tangibles, consistency, expectations

Consequences of poor quality - Answer-loss of business, liability, productivity, costs

External failure costs - Answer-costs incurred when a customer is exposed to poor
quality

Internal failure costs - Answer-associated with correcting a defect before the customer
comes into contact with the product or service

Appraisal costs - Answer-costs associated with product inspection, testing, and auditing
of quality related systems

, Testing - Answer-specific type of inspection that is used when visual inspection cannot
reveal whether or not products meet specifications

Prevention costs - Answer-associated with efforts to prevent errors or defects from
happening (employee training, process improvement and control activity, quality
planning activity)

Quality certification programs - Answer-ISO 9000, ISO 9000 2000, ISO 14000

Total quality management - Answer-philosophy that involves everyone in an
organization in a continual effort to improve quality and achieve customer satisfaction; 3
key elements: continuous improvement, involvement of everyone in the organization,
customer satisfaction

TQM Approach - Answer-1. Find out what customers want- include internal customers
as well as external or final customers
2. Design a product or service that will meet or exceed what customers want- make it
easy to use and easy to produce
3. Design processes that facilitate doing the job right the first time- fail-safing:
incorporating design elements that prevent incorrect procedures
4. Keep track of results & use them to guide improvements in the system
5. Extend these concepts throughout the supply chain
6. Top management must be committed and visibly involved

Six Sigma - Answer-business process for improving quality, reducing costs, and
increasing customer satisfaction

Six Sigma: management component - Answer-provide strong leadership, define
performance metrics, select projects likely to achieve business results, select & train
appropriate people

Six Sigma: technical component - Answer-improving process performance, reducing
variation, utilizing statistical methods, designing a structured improvement strategy
(definition, measurement, analysis, improvement, and control), DMAIC (define,
measure, analyze, improve, control)

Plan-Do-Study-Act Cycle - Answer-Plan: study & document current process, develop
plan for improvement and specify measures for evaluating the plan
Do: implement the plan on a small scale if possible, collect data for evaluation
Study: evaluate the data collected in the "do" phase, check how closely the results
match the original goals of the plan phase
Act: if results are successful, standardize the new method, communicate, train for new
method

Seven basic quality tools - Answer-1. flowcharts

Información del documento

Subido en
20 de marzo de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Desconocido
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
biggdreamer
4.0
(46)
Vendido
289
Seguidores
67
Artículos
18421
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes