FLORIDA ELECTRICAL BUSINESS (Actual 2025/2026) 57
QUESTIONS AND 100% Verified ANSWERS
Failure to maintain OSHA logs could result in a base penalty of
?
$1000
The minimum number of employees that will require a
contractor to obtain workmen's compensation insurance is ?
1 employee
The type of bond that guarantees that the contractor is I'll
perform the work in accordance with the contract is know as a
? bond
Performance Bond
Short term project schedule is detailed explanation of the next
two weeks of construction activities and should be developed
and or reviewed by all the following except ?
Architect
, And action for the breach of a written contract must be
brought within ______ years
5 years
All of the following must follow OSHA regulations standards
except _____ establishments
Religious
The type of estimate that provides precise statements of
quantities of materials, equipment, and man power is
considered to be a ______
Detailed estimate
When preparing an equipment estimate ________ would not
need to be evaluated
Safety factors involved
Under the completed contract method the contractor may
realize the profit ______
When the project is nearly complete
QUESTIONS AND 100% Verified ANSWERS
Failure to maintain OSHA logs could result in a base penalty of
?
$1000
The minimum number of employees that will require a
contractor to obtain workmen's compensation insurance is ?
1 employee
The type of bond that guarantees that the contractor is I'll
perform the work in accordance with the contract is know as a
? bond
Performance Bond
Short term project schedule is detailed explanation of the next
two weeks of construction activities and should be developed
and or reviewed by all the following except ?
Architect
, And action for the breach of a written contract must be
brought within ______ years
5 years
All of the following must follow OSHA regulations standards
except _____ establishments
Religious
The type of estimate that provides precise statements of
quantities of materials, equipment, and man power is
considered to be a ______
Detailed estimate
When preparing an equipment estimate ________ would not
need to be evaluated
Safety factors involved
Under the completed contract method the contractor may
realize the profit ______
When the project is nearly complete