OECP Test Questions with All Correct Answers What item can be removed from a carry deck? A. Fire extinguisher B. Load chart C. Anti-two-block device D. Boom extension - Answer-D. Boom extension The lever on the far left of most telescopic cranes is: A. Boom Down B. Boom extend C. Boom up D. Boom swing - Answer-D. Boom swing When making a lift on outriggers, the maximum ground-bearing pressure occurs: A. Over the rear B. Over the corner C. Over the front D. Over the side - Answer-B. Over the corner The safest speed for a crane carrying a load is: A. The manufactures speed limit B. The job sites speed limit C. The speed recommended by the superintendent D. The speed recommended by the oiler - Answer-A. The manufacturer's speed limit When swinging the load of any crane on crawlers, it will exert the most ground pressure over the: A. Front B. Rear C. Side D. Corner - Answer-D. Corner An operator should respond to a "stop" signal from: A. Appointed signal person only B. Project manager only C. Superintendent only D. Anyone - Answer-D. Anyone When preparing to hoist a load, the hook should be positioned: A. Slightly to the side you're planning to swing to B. Slightly to the side opposite you plant to swing to C. Directly above the loads center of gravity D. Above the edge of the load closest to the crane - Answer-C. Directly above the loads center of gravity Who gives the operator hand signals? A. The foreman B. The superintendent C. The person assigned prior to the lift D. Anyone who is qualified - Answer-C. The person assigned prior to the lift When lifting a load with more than one crane, it is important to: A. Use only cranes from the same manufacturer B. Use only crane with the same rated capacity C. Keep the working radius of both cranes the same D. Keep the hoist lines of both cranes vertical - Answer-D. Keep the hoist lines of both cranes vertical Backward stability on a R/T crane could be a problem when the crane is working: A. Over the side at a minimum radius B. Over the rear at a maximum radius C. Over the side at a maximum radius D. Over the rear at a minimum radius - Answer-A. Over the side at a minimum radius

Mostrar más Leer menos
Institución
OECP
Grado
OECP










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
OECP
Grado
OECP

Información del documento

Subido en
10 de marzo de 2025
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

OECP Test Questions with
All Correct Answers
What item can be removed from a carry deck?

A. Fire extinguisher
B. Load chart
C. Anti-two-block device
D. Boom extension - Answer-D. Boom extension

The lever on the far left of most telescopic cranes is:

A. Boom Down
B. Boom extend
C. Boom up
D. Boom swing - Answer-D. Boom swing

When making a lift on outriggers, the maximum ground-bearing pressure occurs:

A. Over the rear
B. Over the corner
C. Over the front
D. Over the side - Answer-B. Over the corner

The safest speed for a crane carrying a load is:

A. The manufactures speed limit
B. The job sites speed limit
C. The speed recommended by the superintendent
D. The speed recommended by the oiler - Answer-A. The manufacturer's speed limit

When swinging the load of any crane on crawlers, it will exert the most ground pressure
over the:

A. Front
B. Rear
C. Side

,D. Corner - Answer-D. Corner

An operator should respond to a "stop" signal from:

A. Appointed signal person only
B. Project manager only
C. Superintendent only
D. Anyone - Answer-D. Anyone

When preparing to hoist a load, the hook should be positioned:

A. Slightly to the side you're planning to swing to
B. Slightly to the side opposite you plant to swing to
C. Directly above the loads center of gravity
D. Above the edge of the load closest to the crane - Answer-C. Directly above the loads
center of gravity

Who gives the operator hand signals?

A. The foreman
B. The superintendent
C. The person assigned prior to the lift
D. Anyone who is qualified - Answer-C. The person assigned prior to the lift

When lifting a load with more than one crane, it is important to:

A. Use only cranes from the same manufacturer
B. Use only crane with the same rated capacity
C. Keep the working radius of both cranes the same
D. Keep the hoist lines of both cranes vertical - Answer-D. Keep the hoist lines of both
cranes vertical

Backward stability on a R/T crane could be a problem when the crane is working:

A. Over the side at a minimum radius
B. Over the rear at a maximum radius
C. Over the side at a maximum radius
D. Over the rear at a minimum radius - Answer-A. Over the side at a minimum radius

Two blocking will not be caused by:

A. Retracting the boom
B. Extending the boom
C. Hoisting the load
D. Booming down - Answer-A. Retracting the boom

, When load testing mobile cranes, test loads must not exceed:

A. 85% of the tipping load
B. 90% of the tipping load
C. 100% of the manufactures load rating
D. 110% of the manufactures load rating - Answer-D. 110% of the manufactures load
rating

How is site access and usability identified and evaluated?

A. Contacting crane manufacturer for permission
B. Checking ASME b30-5 requirements
C. Slowly driving crane onto site being wary of hazards
D. Job site inspection, taking measurements and comparing measurements to crane
specs - Answer-D. Job site inspection, taking measurements and comparing
measurement to crane specs.

Construction site hazards and restrictions such as a electric power lines and piping are
located and identified by:

A. Setting the crane then determining the location and clearance of hazards
B. Setting the crane and using the signalman
C. Reviewing site safety requirements
D. A pre-operational work site inspection and questioning the job site supervisor -
Answer-D. A pre-operational work site inspection and questioning the job site supervisor

What is the best procedure to follow when underground utilities may be present?

A. Set outriggers pads gently
B. Contact local utility company
C. Use blocking under outrigger pads
D. Do not set outriggers, remain on tires - Answer-B. Contact local utility company.

When arriving in the crane at a job site, the operator should first determine the condition
of the:

A. Cranes setup location
B. Access roads
C. Parking lot
D. Headache ball - Answer-B. Access Roads

When preparing to set up a mobile crane for operation, the following steps must be
taken by the operator:

A. Check ground condition for stability
B. Check overhead crane clearance
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
4 meses hace

4 meses hace

thank you for the review

4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Perfectscorer Chamberlain College Of Nursng
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
483
Miembro desde
3 año
Número de seguidores
354
Documentos
8832
Última venta
2 semanas hace

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Lee mas Leer menos
3.6

74 reseñas

5
27
4
15
3
17
2
5
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes