Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

FDOT Final Estimates - Level 1 with correct answers 100%

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
08-03-2025
Escrito en
2024/2025

FDOT Final Estimates - Level 1 with correct answers 100% What two types of Estimates are needed to pay for the work performed by contractors? - Correct Answers Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - Correct Answers Special Provisions Contractors Recieve progress payments on the basis of? - Correct Answers Monthly Progress Estimates Which of the following sets forth the Department's methods and procedures for preparing and checking final estimates? - Correct Answers Preparation and Documentation Manual (PDM) Which Document contains a series of Specially designed forms that show both original estimates of quantities and the final quantities as measured ad accepted? - Correct Answers Computation Books Which Document contains alignment notes, cross-section notes, linear and area measurements and dimension sketches? - Correct Answers Field Notebooks Where are major changes during construction documented and "as-built" conditions shown? - Correct Answers Field Notebooks What identification is needed to show on the front cover of a field book? - Correct Answers FEID, Contract number, General contents of the book When making corrections to a field book entry, you should: - Correct Answers strike through, initial and enter correct data and date What should be started on the first lined page (page 1) of a field book? - Correct Answers INDEX An entire page of a field notebook you are using is incorrect, what do you do to correct the situation? - Correct Answers Mark the page VOID and reference it to a new page showing the correct information. "Check Levels" must be run at the start of a construction project to assure that: - Correct Answers Construction will be done to design elevations & final measurements for payment will be from the same base elevations as the original survey. What should accompany final measurements so that nonstandard measurements may be interpreted accurately? - Correct Answers Sketches In the REMARKS column of most computation book forms a reference should be made to the: - Correct Answers Source Documents When is it permissible to record only the net weight on an asphaltic concrete tabulation form? - Correct Answers Never, gross tare must be included also A limerock base course is constructed in two 13-foot widths between station 19+40.20 and station 84+50.00. What is the area of the base course to the whole square yard? - Correct Answers 18,806 SY How many square yards are in one acre? - Correct Answers 4,840 Determine the area of the section (G) in the circle to the tenth of a square foot. (NOTE: A= pi r(squared) x (angle/360degrees) - Correct Answers 887.3 SF If you have a benchmark at an elevation of 80.25' and a back sight rob reading of 5.45', what is the height of instrument (HI)? - Correct Answers 85.70' If you have a pile cut off elevation of 50.00' and tip elevation of 10.00', what would your pile length be? - Correct Answers 40' Where can you find the typical widths of base and surface courses? - Correct Answers Typical Sections sheets of the plans Thirteen and one-half gallons is equal to how many cubic feet? - Correct Answers 1.8 Cubic Feet Using the data given below, find the volume to the nearest cubic yard. The areas were determined for the cross sections at these stations: Station: Area (Sq Feet): 5091+00 287.60 5091+38 302.0 5091+91 298.10 5092+47 295.50 5092+69 288.30 - Correct Answers 1,857 CY Determine the volume of the cone to the nearest hundredth of a cubic foot. - Correct Answers 42.03 CF Calculate the volume of the geometric shape to the nearest cubic yard: - Correct Answers 1,795 CY Most Linear pay items are measures in linear ________? - Correct Answers Feet Aside from measuring the length of fence, you should count and document the number of: - Correct Answers Corner post assemblies & pull and end post assemblies The various fencing post assemblies are identified by approximate ________ and are totaled in a ___________. - Correct Answers Station; field notbook You should be sure that the batch scales nd automatic printer at an asphalt plant are certified for accuracy every __________. - Correct Answers Six Months The accuracy of batch scales and automatic printers should be checked: - Correct Answers At least once a week & before accepting the first load on a project.

Mostrar más Leer menos
Institución
FDOT Earthwork
Grado
FDOT Earthwork

Vista previa del contenido

What two types of Estimates are needed to pay for the work performed by contractors? - Correct
Answers Final & Progress Monthly



In case of discrepancies among the contract documents, which document takes the highest precedence?
- Correct Answers Special Provisions



Contractors Recieve progress payments on the basis of? - Correct Answers Monthly Progress Estimates



Which of the following sets forth the Department's methods and procedures for preparing and checking
final estimates? - Correct Answers Preparation and Documentation Manual (PDM)



Which Document contains a series of Specially designed forms that show both original estimates of
quantities and the final quantities as measured ad accepted? - Correct Answers Computation Books



Which Document contains alignment notes, cross-section notes, linear and area measurements and
dimension sketches? - Correct Answers Field Notebooks



Where are major changes during construction documented and "as-built" conditions shown? - Correct
Answers Field Notebooks



What identification is needed to show on the front cover of a field book? - Correct Answers FEID,
Contract number, General contents of the book



When making corrections to a field book entry, you should: - Correct Answers strike through, initial and
enter correct data and date



What should be started on the first lined page (page 1) of a field book? - Correct Answers INDEX

, An entire page of a field notebook you are using is incorrect, what do you do to correct the situation? -
Correct Answers Mark the page VOID and reference it to a new page showing the correct information.



"Check Levels" must be run at the start of a construction project to assure that: - Correct Answers
Construction will be done to design elevations & final measurements for payment will be from the same
base elevations as the original survey.



What should accompany final measurements so that nonstandard measurements may be interpreted
accurately? - Correct Answers Sketches



In the REMARKS column of most computation book forms a reference should be made to the: - Correct
Answers Source Documents



When is it permissible to record only the net weight on an asphaltic concrete tabulation form? - Correct
Answers Never, gross tare must be included also



A limerock base course is constructed in two 13-foot widths between station 19+40.20 and station
84+50.00. What is the area of the base course to the whole square yard? - Correct Answers 18,806 SY



How many square yards are in one acre? - Correct Answers 4,840



Determine the area of the section (G) in the circle to the tenth of a square foot. (NOTE: A= pi r(squared)
x (angle/360degrees) - Correct Answers 887.3 SF



If you have a benchmark at an elevation of 80.25' and a back sight rob reading of 5.45', what is the
height of instrument (HI)? - Correct Answers 85.70'



If you have a pile cut off elevation of 50.00' and tip elevation of 10.00', what would your pile length be? -
Correct Answers 40'



Where can you find the typical widths of base and surface courses? - Correct Answers Typical Sections
sheets of the plans

Escuela, estudio y materia

Institución
FDOT Earthwork
Grado
FDOT Earthwork

Información del documento

Subido en
8 de marzo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$9.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
EXAMSBASE
5.0
(1)

Conoce al vendedor

Seller avatar
EXAMSBASE Harvad university
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
5
Miembro desde
1 año
Número de seguidores
1
Documentos
405
Última venta
5 meses hace
STUDYSMART

StudySmart Revising without a good structure can be so frustrating but with StudySmart you are able to get revision questions, summary notes and exams to help you pass with flying colors

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes