100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

SAFe 5 Advanced Scrum Master Exam Questions And Answers 2025 Update.

Puntuación
-
Vendido
-
Páginas
24
Grado
A+
Subido en
06-03-2025
Escrito en
2024/2025

©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 1 SAFe 5 Advanced Scrum Master Exam Questions And Answers 2025 Update. How does a Scrum Master lead a team's in relentless improvement? - AnswerBy facilitating the Iteration Retrospective An effective decision-making framework provides which two ultimate outcomes? - Answer1 - Improves flow 2 - Unlocks the intrinsic motivation of knowledge workres What are two Release Train Enginner responsibilities? - Answer1 - Drive relentles improvement through Inspect and Adapt 2 - Facilitate PI Planning readiness and the event itself What is one way to improve the skills of a team member? - AnswerPair-work with other team members Who should vote on root causes? - AnswerThe team members working on that problem One of the Scrum Master's main responsibilities is to communicate with management and outside stakeholders to hel the team in what way? - AnswerProtect them from uncontrolled addition of work A team's Product Owner (PO) takes an unexxpected leave of absence for the last week of the Iteration. Trhee of the team's Sotires have been completed and are waiting to be accepted. The Scrum Master asks the Product Manager (PM) to attend the Iteration Review and accept the Sotires. The PM responds that he is not familiar enough with the intent to feel comfortable accepting these responsabilities. He suggest keeping the iteration open for additional week and waiting for the PO to come back. What should the team's Scrum Master do? - AnswerWork with the Release Train Enginner to find a solution The Agile Team need to learn or acquire new skills. Where is this list of skills found? - AnswerIn the Improvement backlog Who participates in the Inspect and Adapt event? - AnswerThe entire Agile Release Train ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 2 What are three Interation Retrospective anti-patterns? - Answer1 - When only some of the team attends 2 - When the Scrum Master decides what the retrospective topic(s) will be and directs the team on specific improvement items to work on 3 - When the team's people manager comes in to observe What are two examples of tasking anti-patterns? (Choose two.) - Answer1 - The team focuses on task completion over Story completion and acceptance criteria; 2 - The team provides updates only on tasks during the daily stand up meeting Wich two actions enhance an Agile Release Train's performance? - Answer1 - Collaboration 2 - Team alignment How does the Scrum Master hel teams address the challenges of modern Enterprises? - AnswerBy actively addressing impediments What is the skill type Scrum Masters try to get the Agile Team to achieve? - AnswerT-Shaped One state on the team Kaban board has people waiting while the previous stage is overloaded. What should the Scrum Master consider doing? - AnswerEncourage and coach the people in the under-utilized stage to hel with the work of the overloaded stage How can learning Milestones be used? - AnswerTo test the conecpt of a new Feature or Capability What is one Extreme Programming (XP) rule adopted in SAFe? - AnswerPair Programming Why are SAFe Scrum Masters challenged differently in a Enterprise? - AnswerThe team is affected by teams and stakeholders beyong their control SAFe Scrum Master interact with wich level(s) of Framework? - AnswerAll Levels Wich tow events explicity implement the Lean-Agile Mindset of relentless improvement? - Answer1 - Inspect and Adapt 2 - Iteration Retrospective Who is responsible for assisting to establish Continuous Integration in SAFe? - AnswerThe System Team What is the connection between feedback and optimun batch size? - AnswerLack of feedback contributes to higher cost During Iteration Review, the team decides to carry forward three Stories to the next iteration. This is the second time during this PI that some of the team's Stories are carried over. What are ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 3 two actions the Scrum Master should take? - Answer1 - Discuss the issue at the Itaration Retrospective 2 - Perform the 5 Whys to find the root cause of the delays Who reviews the top Capabilities for the upcoming PI? - AnswerSolution Management Wich statement describes how Kanban teams handle capacity during PI Planning? - AnswerThey use throughput as an indication of their capacity Which technique is used to identify root causes during the problem-solving workshop? - Answer5 Whys What are two key areas a team should be organized aroung? - Answer1 - Enablers 2 - Features What anti-pattern can emerge during the Scrum of Scrums? - AnswerScrum Masters report on the teams' tasks status each day A team achieved less than 80% predictability during the quantitative measurement of the Inspect and Adapt event. What would be an unacceptable action for this team's Scrum Master take? - AnswerDecide improvement actions for the team to implement In complex systems development, what do local integration points ensure? - AnswerThat each Capability of the systems is meeting its responsibilities in contributing of the overall Solution Intent Wich SAFe organizational construct allows businesses to build large and complex systems wich require hundreds of people in a Lean-Agile manner? - AnswerSolution Train Achieving the goals of Release on Demand requires an understanding of how to decouple what? - AnswerThe release from deployment What improves collaboration between Scrum Masters and System Architects, System Teams and Operations? - AnswerProgram Kanban What is the most effective way to estabilish Built-in Quality? - AnswerPerform as many types of testing within the Iteration boundaries as possible What action should be taken on relentless improvement backlog items from the problem- solving worshop? - AnswerUse the items as direct input into the PI Planning event that follows How do Kanban Teams implement the SAFe Lean-Agile mindset of relentless improvement? - AnswerBy using cumulative flow diagrams to objectively measure bottlenecks and variation which could be due to systemic factors Wich SAFe configuratio

Mostrar más Leer menos
Institución
SAFe 5
Grado
SAFe 5

Vista previa del contenido

©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM.




SAFe 5 Advanced Scrum Master Exam
Questions And Answers 2025 Update.


How does a Scrum Master lead a team's in relentless improvement? - Answer✔By facilitating
the Iteration Retrospective

An effective decision-making framework provides which two ultimate outcomes? - Answer✔1 -
Improves flow
2 - Unlocks the intrinsic motivation of knowledge workres

What are two Release Train Enginner responsibilities? - Answer✔1 - Drive relentles
improvement through Inspect and Adapt
2 - Facilitate PI Planning readiness and the event itself

What is one way to improve the skills of a team member? - Answer✔Pair-work with other team
members

Who should vote on root causes? - Answer✔The team members working on that problem
One of the Scrum Master's main responsibilities is to communicate with management and
outside stakeholders to hel the team in what way? - Answer✔Protect them from uncontrolled
addition of work
A team's Product Owner (PO) takes an unexxpected leave of absence for the last week of the
Iteration. Trhee of the team's Sotires have been completed and are waiting to be accepted.


The Scrum Master asks the Product Manager (PM) to attend the Iteration Review and accept
the Sotires. The PM responds that he is not familiar enough with the intent to feel comfortable
accepting these responsabilities. He suggest keeping the iteration open for additional week and
waiting for the PO to come back. What should the team's Scrum Master do? - Answer✔Work
with the Release Train Enginner to find a solution
The Agile Team need to learn or acquire new skills. Where is this list of skills found? -
Answer✔In the Improvement backlog

Who participates in the Inspect and Adapt event? - Answer✔The entire Agile Release Train

1

,©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM.


What are three Interation Retrospective anti-patterns? - Answer✔1 - When only some of the
team attends
2 - When the Scrum Master decides what the retrospective topic(s) will be and directs the team
on specific improvement items to work on
3 - When the team's people manager comes in to observe

What are two examples of tasking anti-patterns? (Choose two.) - Answer✔1 - The team focuses
on task completion over Story completion and acceptance criteria;
2 - The team provides updates only on tasks during the daily stand up meeting

Wich two actions enhance an Agile Release Train's performance? - Answer✔1 - Collaboration
2 - Team alignment
How does the Scrum Master hel teams address the challenges of modern Enterprises? -
Answer✔By actively addressing impediments

What is the skill type Scrum Masters try to get the Agile Team to achieve? - Answer✔T-Shaped
One state on the team Kaban board has people waiting while the previous stage is overloaded.
What should the Scrum Master consider doing? - Answer✔Encourage and coach the people in
the under-utilized stage to hel with the work of the overloaded stage

How can learning Milestones be used? - Answer✔To test the conecpt of a new Feature or
Capability

What is one Extreme Programming (XP) rule adopted in SAFe? - Answer✔Pair Programming

Why are SAFe Scrum Masters challenged differently in a Enterprise? - Answer✔The team is
affected by teams and stakeholders beyong their control

SAFe Scrum Master interact with wich level(s) of Framework? - Answer✔All Levels
Wich tow events explicity implement the Lean-Agile Mindset of relentless improvement? -
Answer✔1 - Inspect and Adapt
2 - Iteration Retrospective

Who is responsible for assisting to establish Continuous Integration in SAFe? - Answer✔The
System Team

What is the connection between feedback and optimun batch size? - Answer✔Lack of feedback
contributes to higher cost
During Iteration Review, the team decides to carry forward three Stories to the next iteration.
This is the second time during this PI that some of the team's Stories are carried over. What are



2

, ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM.


two actions the Scrum Master should take? - Answer✔1 - Discuss the issue at the Itaration
Retrospective
2 - Perform the 5 Whys to find the root cause of the delays

Who reviews the top Capabilities for the upcoming PI? - Answer✔Solution Management
Wich statement describes how Kanban teams handle capacity during PI Planning? -
Answer✔They use throughput as an indication of their capacity
Which technique is used to identify root causes during the problem-solving workshop? -
Answer✔5 Whys

What are two key areas a team should be organized aroung? - Answer✔1 - Enablers
2 - Features

What anti-pattern can emerge during the Scrum of Scrums? - Answer✔Scrum Masters report
on the teams' tasks status each day
A team achieved less than 80% predictability during the quantitative measurement of the
Inspect and Adapt event. What would be an unacceptable action for this team's Scrum Master
take? - Answer✔Decide improvement actions for the team to implement

In complex systems development, what do local integration points ensure? - Answer✔That
each Capability of the systems is meeting its responsibilities in contributing of the overall
Solution Intent
Wich SAFe organizational construct allows businesses to build large and complex systems wich
require hundreds of people in a Lean-Agile manner? - Answer✔Solution Train
Achieving the goals of Release on Demand requires an understanding of how to decouple
what? - Answer✔The release from deployment
What improves collaboration between Scrum Masters and System Architects, System Teams
and Operations? - Answer✔Program Kanban

What is the most effective way to estabilish Built-in Quality? - Answer✔Perform as many types
of testing within the Iteration boundaries as possible
What action should be taken on relentless improvement backlog items from the problem-
solving worshop? - Answer✔Use the items as direct input into the PI Planning event that
follows
How do Kanban Teams implement the SAFe Lean-Agile mindset of relentless improvement? -
Answer✔By using cumulative flow diagrams to objectively measure bottlenecks and variation
which could be due to systemic factors

Wich SAFe configuration requires having a Vision? - Answer✔All SAFe configurations


3

Escuela, estudio y materia

Institución
SAFe 5
Grado
SAFe 5

Información del documento

Subido en
6 de marzo de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
621
Miembro desde
2 año
Número de seguidores
180
Documentos
24417
Última venta
23 horas hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

124 reseñas

5
58
4
22
3
23
2
4
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes