FE CIVIL - CONST ENG Questions With
Solved Solutions


Which equipment has a large bucket that can be raised, lowered, and used to
scoop loose material from the ground and move it from one place to another?
A. Compactor
B. Crane
C. Dump truck
D. Loader - ANSWER>>Loader

Which dewatering method accelerates the flow of water using a direct current?
A. Deep well
B. Wellpoint
C. Vacuum well
D. Electro osmosis - ANSWER>>Electro osmosis

What type of erosion control has graded land that forms a channel for water to
flow? - ANSWER>>Swale

The wellpoints are only effective to ______ in depth. - ANSWER>>about 6m in
depth (no more).

Which of the following is the most effective way to control erosion?
A. Vegetation
B. Swale
C. Check dam
D. Silt fence - ANSWER>>Vegetation

What part of lifting equipment is the fabricated loop, typically at the end of a sling
used as an attachment point?

, A. Angle
B. Eye
C. Leg
D. Reach - ANSWER>>Angle

In productivity analysis, there are four categories of work that take place. During
construction, a truck driver brought the wrong concrete mix to the site. This mix
was placed into a footing molding and was left to harden. Once it was determined
that the mix was incorrect, the crew had to remove the hardened concrete and
place a new footing. What type of work is this called? - ANSWER>>Non-
contributory work

What is not a factor that affects compaction?
A. Moisture content
B. Method of compaction
C. Amount of time spent compacting
D. Area being compacted - ANSWER>>Area being compacted

When looking at construction drawings, what information would you not find?
A. Quality
B. Quantities
C. Elevations
D. Dimensions - ANSWER>>Quality

What ensures that the contractor carries out the construction according to the
contract? - ANSWER>>Performance bond

What is not a direct cost for the contractor? - ANSWER>>Office rent

A contractor is working on a highway construction project. Which of the choices
below is an indirect cost?
A. Architect fee
B. Purchasing asphalt

Información del documento

Subido en
6 de marzo de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
1316
Última venta
6 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes