SAFE 5 ADVANCED SCRUM MASTER EXAM LATEST EXAM QUESTIONS AND CORRECT ANSWERS (ALREADY GRADED A+) | LATEST VERSION | VERIFIED ANSWERS

Institución
SAFE 5 ADVANCED SCRUM MASTER
Grado
SAFE 5 ADVANCED SCRUM MASTER

Vista previa del contenido

1|Page



SAFE 5 ADVANCED SCRUM MASTER EXAM LATEST
EXAM QUESTIONS AND CORRECT ANSWERS
(ALREADY GRADED A+) | LATEST VERSION | VERIFIED
ANSWERS
How does a Scrum Master lead a team's in relentless improvement? - (answers)By
facilitating the Iteration Retrospective

An effective decision-making framework provides which two ultimate outcomes?
- (answers)1 - Improves flow
2 - Unlocks the intrinsic motivation of knowledge workres

What are two Release Train Enginner responsibilities? - (answers)1 - Drive
relentles improvement through Inspect and Adapt
2 - Facilitate PI Planning readiness and the event itself

What is one way to improve the skills of a team member? - (answers)Pair-work
with other team members

Who should vote on root causes? - (answers)The team members working on that
problem

One of the Scrum Master's main responsibilities is to communicate with
management and outside stakeholders to hel the team in what way? -
(answers)Protect them from uncontrolled addition of work

A team's Product Owner (PO) takes an unexxpected leave of absence for the last
week of the Iteration. Trhee of the team's Sotires have been completed and are
waiting to be accepted.

The Scrum Master asks the Product Manager (PM) to attend the Iteration Review
and accept the Sotires. The PM responds that he is not familiar enough with the
intent to feel comfortable accepting these responsabilities. He suggest keeping
the iteration open for additional week and waiting for the PO to come back. What
should the team's Scrum Master do? - (answers)Work with the Release Train
Enginner to find a solution

,2|Page


The Agile Team need to learn or acquire new skills. Where is this list of skills
found? - (answers)In the Improvement backlog

Who participates in the Inspect and Adapt event? - (answers)The entire Agile
Release Train

What are three Interation Retrospective anti-patterns? - (answers)1 - When only
some of the team attends
2 - When the Scrum Master decides what the retrospective topic(s) will be and
directs the team on specific improvement items to work on
3 - When the team's people manager comes in to observe

What are two examples of tasking anti-patterns? (Choose two.) - (answers)1 - The
team focuses on task completion over Story completion and acceptance criteria;
2 - The team provides updates only on tasks during the daily stand up meeting

Wich two actions enhance an Agile Release Train's performance? - (answers)1 -
Collaboration
2 - Team alignment

How does the Scrum Master hel teams address the challenges of modern
Enterprises? - (answers)By actively addressing impediments

What is the skill type Scrum Masters try to get the Agile Team to achieve? -
(answers)T-Shaped

One state on the team Kaban board has people waiting while the previous stage is
overloaded. What should the Scrum Master consider doing? - (answers)Encourage
and coach the people in the under-utilized stage to hel with the work of the
overloaded stage

How can learning Milestones be used? - (answers)To test the conecpt of a new
Feature or Capability

What is one Extreme Programming (XP) rule adopted in SAFe? - (answers)Pair
Programming

, 3|Page


Why are SAFe Scrum Masters challenged differently in a Enterprise? -
(answers)The team is affected by teams and stakeholders beyong their control

SAFe Scrum Master interact with wich level(s) of Framework? - (answers)All Levels

Wich tow events explicity implement the Lean-Agile Mindset of relentless
improvement? - (answers)1 - Inspect and Adapt
2 - Iteration Retrospective

Who is responsible for assisting to establish Continuous Integration in SAFe? -
(answers)The System Team

What is the connection between feedback and optimun batch size? -
(answers)Lack of feedback contributes to higher cost

During Iteration Review, the team decides to carry forward three Stories to the
next iteration. This is the second time during this PI that some of the team's
Stories are carried over. What are two actions the Scrum Master should take? -
(answers)1 - Discuss the issue at the Itaration Retrospective
2 - Perform the 5 Whys to find the root cause of the delays

Who reviews the top Capabilities for the upcoming PI? - (answers)Solution
Management

Wich statement describes how Kanban teams handle capacity during PI Planning?
- (answers)They use throughput as an indication of their capacity

Which technique is used to identify root causes during the problem-solving
workshop? - (answers)5 Whys

What are two key areas a team should be organized aroung? - (answers)1 -
Enablers
2 - Features

What anti-pattern can emerge during the Scrum of Scrums? - (answers)Scrum
Masters report on the teams' tasks status each day

Escuela, estudio y materia

Institución
SAFE 5 ADVANCED SCRUM MASTER
Grado
SAFE 5 ADVANCED SCRUM MASTER

Información del documento

Subido en
4 de marzo de 2025
Número de páginas
25
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Gratis
Accede al documento completo:
Descarga

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
Nelly003

Conoce al vendedor

Seller avatar
Nelly003 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
470
Miembro desde
1 año
Número de seguidores
2
Documentos
3049
Última venta
1 día hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes