NPORS 25 LATEST UPDATED 2025/2026 TEST QUESTIONS AND ANSWERS 2025 WITH VERIFIED SOLUTIONS/100% CORRECT GRADED AT A+ 1. What is the correct method of mounting/ dismounting the machine? - ANSWER S? 2. List 5 checks that must be made to the tracks and running gear during a pre-operational check - ANSWER ? 3. When loading a forward tipping dumper, the dumper driver should be: a) Behind the dumper our of view of the excavator operator b) Sitting on the dumper during loading c) A safe distance away from the dumper our of the excavators working radius in view of the operator - ANSWER ? 4. What is the minimum safe distance from the rear of your machine to any solid structure? a) 2 metres b) 1200 mm c) 500 mm - ANSWER ? 5. When excavating a deep excavation when is a banksman required? a) A banksman is not required b) At all times to direct the excavator operation c) to check the depth of the excavation - ANSWER ? 6. If a fault occurs on the machine during use, when should it be reported? a) immediately to your works supervisor and/ or the plant fitter b) At the end of the day c) In the defect book at the end of the week - ANSWER ? 7. In which position should the throttle be set for excavating? a) Maximise for speed quickness of operation b) Minimum to reduce engine wear c) According to manufacturer's Manila for the type of material excavated - ANSWER ? 8. When changing the bucket using an Automatic Quick Hitch system what must the operator ensure? a) That the rear jaw has fully engaged the rear pin and the switch has been returned to the off position b) That the rear jaw has fully engaged the rear pin and the switch has been returned to the on position c) That the rear jaw has fully engaged the rear pin - ANSWER ? 9. At what intervals should your excavator be greased/ lubricated? - ANSWER ? 10. What must the operator ensure when changing an attachment using a manual or semi-automatic quick hitch system and why? - ANSWER ?

Mostrar más Leer menos
Institución
NPORS
Grado
NPORS









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NPORS
Grado
NPORS

Información del documento

Subido en
3 de marzo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NPORS 25 LATEST UPDATED 2025/2026
TEST QUESTIONS AND ANSWERS 2025
WITH VERIFIED SOLUTIONS/100%
CORRECT GRADED AT A+


1. What is the correct method of mounting/ dismounting the
machine? - ANSWER S?

2. List 5 checks that must be made to the tracks and running gear
during a pre-operational check - ANSWER ?

3. When loading a forward tipping dumper, the dumper driver should
be:
a) Behind the dumper our of view of the excavator operator
b) Sitting on the dumper during loading
c) A safe distance away from the dumper our of the excavators
working radius in view of the operator - ANSWER ?

4. What is the minimum safe distance from the rear of your machine
to any solid structure?
a) 2 metres
b) 1200 mm
c) 500 mm - ANSWER ?

5. When excavating a deep excavation when is a banksman required?
a) A banksman is not required
b) At all times to direct the excavator operation
c) to check the depth of the excavation - ANSWER ?

6. If a fault occurs on the machine during use, when should it be
reported?

, a) immediately to your works supervisor and/ or the plant fitter
b) At the end of the day
c) In the defect book at the end of the week - ANSWER ?

7. In which position should the throttle be set for excavating?
a) Maximise for speed quickness of operation
b) Minimum to reduce engine wear
c) According to manufacturer's Manila for the type of material
excavated - ANSWER ?

8. When changing the bucket using an Automatic Quick Hitch system
what must the operator ensure?
a) That the rear jaw has fully engaged the rear pin and the
switch has been returned to the off position
b) That the rear jaw has fully engaged the rear pin and the
switch has been returned to the on position
c) That the rear jaw has fully engaged the rear pin - ANSWER ?



9. At what intervals should your excavator be greased/ lubricated? -
ANSWER ?

10. What must the operator ensure when changing an attachment
using a manual or semi-automatic quick hitch system and why? -
ANSWER ?

11. Why should an operator not work "across the tracks" of the
excavator at full radius? - ANSWER ?

12. When excavating, how far from the excavation should the
spoil be placed?
a) A distance equal to the depth of the excavation from the side
of the excavation but no less than 1 metre
b) As close as possible from the edge of the excavation
$14.98
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Exchequer Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
60
Miembro desde
1 año
Número de seguidores
1
Documentos
1442
Última venta
3 semanas hace
EXEMPLARY SERVICE IN ACADEMIA EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I CAN DO ASSIGNMENTS, EXAMS,ESSAYS AND RESEARCH PROJECTS FOR YOU EVEN AT STRICT DEADLINES. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, FREE of any fee.

Lee mas Leer menos
2.8

8 reseñas

5
3
4
0
3
1
2
0
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes