C-10 Electrical Part 1 Questions and Answers
Latest Update
Practice questions for this set
2
___
167. Allowable load current will be derated
_____ on
to 50% of normal capacity when there are 4
jobs.
___
Don't know?
, 1. Takeoffs of conduit are Power distribution, branch lighting, and branch power
categorized into ___ _.
2. Raceways are taken off per ___ _. Linear foot, each
Fittings required to make turns and
extensions are taking off per _ _.
3. All wires and conductors are taken Linear foot
off per __ _.
4. All fittings, devices and boxes are Each Item
taken off per _ _.
5. Permits and fees for tie-ins may be Occurrence,Project, and Contract
listed at lump sum and are taken off
per __ _.
6. Control stations are taken off by Individual Unit and Each Item.
_______.
7. Panelboards are taken off Type, Size, and Voltage
individually according to ___ _.
8. Starters, safety switches and fuses Each Item
are taken off per ___ _.
9 _____ should be kept separate Exit Lighting
from general light fixtures.
10. Interior and exterior lighting Separately
should be taken off and listed ____ _.
11. Lamps for light fixtures are ____ _. Taken off per each Item
12. Light fixtures should be listed in Color
the takeoff according to _ _.
13. Working electrical drawings Telecommunications and security systems only
numbered sequentially, prefaced by
the letter "E", include __ _.
14. The _____ shows power Power plan
requirements of the structure.
15. The _____ aids the electrical Panel Schedule
contractor sizing the panel.
16. The _____ plan is supplemented Lighting
by the fixture schedule.
17. The fixture schedule lists lamp Wattage
_______.
18. Electrical specifications provide The grade of materials to be used, Materials installation specifics, and
_______. how materials will be used in the finished system
Latest Update
Practice questions for this set
2
___
167. Allowable load current will be derated
_____ on
to 50% of normal capacity when there are 4
jobs.
___
Don't know?
, 1. Takeoffs of conduit are Power distribution, branch lighting, and branch power
categorized into ___ _.
2. Raceways are taken off per ___ _. Linear foot, each
Fittings required to make turns and
extensions are taking off per _ _.
3. All wires and conductors are taken Linear foot
off per __ _.
4. All fittings, devices and boxes are Each Item
taken off per _ _.
5. Permits and fees for tie-ins may be Occurrence,Project, and Contract
listed at lump sum and are taken off
per __ _.
6. Control stations are taken off by Individual Unit and Each Item.
_______.
7. Panelboards are taken off Type, Size, and Voltage
individually according to ___ _.
8. Starters, safety switches and fuses Each Item
are taken off per ___ _.
9 _____ should be kept separate Exit Lighting
from general light fixtures.
10. Interior and exterior lighting Separately
should be taken off and listed ____ _.
11. Lamps for light fixtures are ____ _. Taken off per each Item
12. Light fixtures should be listed in Color
the takeoff according to _ _.
13. Working electrical drawings Telecommunications and security systems only
numbered sequentially, prefaced by
the letter "E", include __ _.
14. The _____ shows power Power plan
requirements of the structure.
15. The _____ aids the electrical Panel Schedule
contractor sizing the panel.
16. The _____ plan is supplemented Lighting
by the fixture schedule.
17. The fixture schedule lists lamp Wattage
_______.
18. Electrical specifications provide The grade of materials to be used, Materials installation specifics, and
_______. how materials will be used in the finished system