Management by Objectives - ANSWER1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: The bulk of the project budget will be spent in the execution phase - ANSWER2. During the full life cycle of the project, a plot of the project's expected expenditures will usually follow a characteristic S curve. This indicates that: Until the divestment of the operations at the end of the product life cycle - ANSWER14. Projects require project management while operations require business process management or operations management. Projects can intersect with operations at various points during the product lifecycle. Which of the following is not a stage to represent this? Chart of Accounts - ANSWER41. Any numbering system that is used to monitor project costs by category such as labor, supplies, or materials, for example, is called: Reviewing the performance of an installed software module - ANSWER42. An example of 'Validate Scope' process is : The original scope of the project plus or minus any scope changes - ANSWER44. A project manager is reviewing the scope of the project and the scope baseline of the project. Which of the following does it include? Assigning work to a specific resource - ANSWER46. When decomposing project work during WBS creation, which of the following activities is not part of the process : Subprojects - ANSWER17. Large projects may be divided into smaller, more manageable components known as, Program manager - ANSWER18. A manager who manages a group of related projects is called a -

Mostrar más Leer menos
Institución
CAPM
Grado
CAPM








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CAPM
Grado
CAPM

Información del documento

Subido en
1 de marzo de 2025
Número de páginas
3
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CAPM Exam Practice Questions &
Answers Correct 100%
Management by Objectives - ANSWER1. The process of establishing clear and
achievable objectives, measuring their achievement, and adjusting performance in
accordance with the results of the measurement is called:

The bulk of the project budget will be spent in the execution phase - ANSWER2.
During the full life cycle of the project, a plot of the project's expected expenditures
will usually follow a characteristic S curve. This indicates that:

Until the divestment of the operations at the end of the product life cycle -
ANSWER14. Projects require project management while operations require business
process management or operations management. Projects can intersect with
operations at various points during the product lifecycle. Which of the following is not
a stage to represent this?

Chart of Accounts - ANSWER41. Any numbering system that is used to monitor
project costs by category such as labor, supplies, or materials, for example, is called:

Reviewing the performance of an installed software module - ANSWER42. An
example of 'Validate Scope' process is :

The original scope of the project plus or minus any scope changes - ANSWER44. A
project manager is reviewing the scope of the project and the scope baseline of the
project. Which of the following does it include?

Assigning work to a specific resource - ANSWER46. When decomposing project
work during WBS creation, which of the following activities is not part of the process :


Subprojects - ANSWER17. Large projects may be divided into smaller, more
manageable components known as,

Program manager - ANSWER18. A manager who manages a group of related
projects is called a -

customer satisfaction survey - ANSWER19. Which of the following activity is
conducted last as part of closing process group?

Initiation and planning - ANSWER21. A stakeholder has the greatest ability to
influence a project during -

Perform Quality Assurance - ANSWER24. Of the following, which is not a process
from the Planning Process Group?
$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
nursingismylife West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
249
Miembro desde
2 año
Número de seguidores
174
Documentos
9127
Última venta
2 semanas hace

3.6

38 reseñas

5
14
4
12
3
3
2
1
1
8

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes