ACI Concrete Field Testing Technician- Grade I Exam Questions With 100% Correct Answers .A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - ANSWER-2 in. [50 mm] .A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ANSWER-False .A mallet weighing ____ must be used to tap the sides of the bowl after rodding each layer. - ANSWER-1.25 +- 0.50 lb. (600 +- 200 g) .A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - ANSWER-False .A plastic container can be used for the measure in this method. True or False? - ANSWER-False, measure must be steel or another suitable metal .According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER-Verify conformance to a specified requirement for temperature of concrete .After completing the strike-off procedure, what must be done before weighing the measure and sample? - ANSWER-Clean off any excess concrete .After consolidation of the final layer, an excess of concrete ____ above the top of the measure is considered optimum. - ANSWER-1/8 in. [3 mm] .After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False? - ANSWER-False; the specimens must be moved immediately .After rodding each layer, what should be done to the measure before adding another layer of concrete? - ANSWER-Tap the sides of the measure smartly 10 to 15 times with the mallet .After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping rod. True or False? - ANSWER-False

Vista previa del contenido

ACI Concrete Field Testing Technician- Grade I Exam
Questions With 100% Correct Answers




.A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for
concrete containing aggregate with particles not exceeding _____
in size, without the need for wet sieving the concrete. - ANSWER-2
in. [50 mm]


.A composite sample of concrete is required even if the only
purpose for obtaining the sample is to determine temperature.
True of False? - ANSWER-False


.A mallet weighing ____ must be used to tap the sides of the bowl
after rodding each layer. - ANSWER-1.25 +- 0.50 lb. (600 +- 200 g)


.A maximum temperature of freshly mixed concrete is specified in
ASTM C1064. True of False? - ANSWER-False

,.A plastic container can be used for the measure in this method.
True or False? - ANSWER-False, measure must be steel or another
suitable metal


.According to ASTM C1064, what is one reason to take the
temperature of concrete? - ANSWER-Verify conformance to a
specified requirement for temperature of concrete


.After completing the strike-off procedure, what must be done
before weighing the measure and sample? - ANSWER-Clean off
any excess concrete


.After consolidation of the final layer, an excess of concrete ____
above the top of the measure is considered optimum. - ANSWER-
1/8 in. [3 mm]


.After molding test specimens, you should wait two hours before
moving them to the location of initial storage. True or False? -
ANSWER-False; the specimens must be moved immediately


.After rodding each layer, what should be done to the measure

, before adding another layer of concrete? - ANSWER-Tap the sides
of the measure smartly 10 to 15 times with the mallet


.After the final rodding, the sides of the slump mold should should
be tapped lightly with the tamping rod. True or False? - ANSWER-
False


.After the temperature of the concrete is read, what is required? -
ANSWER-Reporting of temperature


.Air meter bowls used for this test must conform to ASTM _____
and be calibrated for volumee according to ASTM _____. -
ANSWER-C231, C29


.ASTM Method gives standardized requirements for _____, _____,
_____, and _____, of test specimens. - ANSWER-Making, curing,
protecting, transporting


.At the end of the procedure, the air meter is _____. - ANSWER-
Disassembled and its contents examined


.Concrete mixtures with specified strengths of 6000 psi [40 MPa]

Información del documento

Subido en
27 de febrero de 2025
Número de páginas
25
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.58

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Docwyne6
3.5
(6)
Vendido
33
Seguidores
11
Artículos
1706
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes