QUESTIONS WITH ALREADY PASSED
ANSWERS!!
1 of 35
Term
Permit fees for an opt-in municipality under the UCC are:
Established by regulation by the Department of Labor and Industry
Established by the legislature via Act 45 of 1999
Required to be in accordance with Formula 1, 2 or 3.
Are not regulated by the UCC
Give this one a try later!
, D.None of the statements are true. D. Neither a) or b).
D.None of the above statements are D. Are not regulated by the
correct. UCC
Don't know?
2 of 35
Term
A residential electrical inspector notifies a building code official that
he intends to begin conducting inspections in the jurisdiction. The
jurisdiction has retained a sole-source third party agency to conduct
all inspections. Which statement is the most accurate?
A. The inspector is allowed to conduct inspections anywhere in the
state and the BCO must accept the results of their inspection.
B. The inspector is allowed to conduct inspections if it is acceptable
to the third party under contract.
C. The building code official should inform the inspector that
only the results of inspections from the third party under contract
will be accepted.
D.The building code official should file a complaint against the
inspector with the Department of Labor and Industry.
Give this one a try later!
C.Be installed in all locations required by the currently adopted International
Residential Code but may be battery operated and may not be required to be
, interconnected.
C.The building code official should inform the inspector that only the
results of inspections from the third party under contract will be accepted.
D. A Building Code Official is required to meet continuing education
requirements unless they submit proof of passing an additional UCC certification
exam.
C. The Building Code Official is never allowed to waive accessibility requirements
for historic buildings.
Don't know?
3 of 35
Term
Select the most correct statement about residential permits that
have been issued:
A. All work must be completed within 180 days or an extension of
the permit must be requested in writing.
B.Work must begin within 180 days or the permit is deemed invalid.
C. Work must begin within 180 days and may not be stopped or
abandoned for more than 60 days without applying for a permit
extension.
D.Work can begin anytime after the permit is issued as long as
it begins within 5 years of the issue date on the permit.
Give this one a try later!
, A. They are only required for B.Work must begin within 180
new construction and days or the permit is
additions. deemed invalid.
C.They must comply with the
B.The permit must be issued within
Uniform Construction Code if they
30 business days.
are open to the general public.
Don't know?
4 of 35
Term
Which of the following do not require a permit and inspection under
UCC regulations:
A. Installation of vinyl siding on an existing commercial structure
B.Installation of a new manufactured home on a foundation
C. Modular construction site trailers to be used for more than
180 days
D.Coal-fired boilers in single family construction
Give this one a try later!
B. Commercial certificate of C. Approval of plans submitted for a
occupancy residential alteration
A.Chapter 11 of the International A.Installation of vinyl siding on
Building Code an existing commercial
structure