Final Estimates Level 1 Exam Questions & Answers Guaranteed Pass

Puntuación
-
Vendido
-
Páginas
24
Grado
A+
Subido en
24-02-2025
Escrito en
2024/2025

T/F: A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - CORRECT ANSWER-True For DOT management of construction and reconstruction projects includes the following specific responsibilities: A. Planning, Programming, and Design B. Contract Administrations C. Contractor Payments D. Design and Contract Management E. All of the above - CORRECT ANSWER-E. All of the above T/F: To pay for work performed by contractors, progress and Final Estimates are needed? - CORRECT ANSWER-True Which of the following is not officially considered a "Contract Document"? A. Supplemental Agreements and Work Orders B. Notebooks and Estimates Procedure Manual. C. Standard Specifications. D .Construction Manual. E. Answers B & D. - CORRECT ANSWER-E. Answers B & D. Between printings of the Standard Specifications, what does the Department publish to identify and describe changes in the Specifications? A. CPAM B. Supplemental Specifications C. Work Orders D. Specification Changes - CORRECT ANSWER-B. Supplemental Specifications

Mostrar más Leer menos
Institución
Estimates Level 1
Grado
Estimates Level 1










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estimates Level 1
Grado
Estimates Level 1

Información del documento

Subido en
24 de febrero de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Final Estimates Level 1 Exam Questions
& Answers Guaranteed Pass

T/F: A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. - CORRECT
ANSWER-True



For DOT management of construction and reconstruction projects includes the following
specific responsibilities:

A. Planning, Programming, and Design

B. Contract Administrations

C. Contractor Payments

D. Design and Contract Management

E. All of the above - CORRECT ANSWER-E. All of the above



T/F: To pay for work performed by contractors, progress and Final Estimates are
needed? - CORRECT ANSWER-True



Which of the following is not officially considered a "Contract Document"?

A. Supplemental Agreements and Work Orders

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D .Construction Manual.

E. Answers B & D. - CORRECT ANSWER-E. Answers B & D.



Between printings of the Standard Specifications, what does the Department publish to
identify and describe changes in the Specifications?

,A. CPAM

B. Supplemental Specifications

C. Work Orders

D. Specification Changes - CORRECT ANSWER-B. Supplemental Specifications



Select the correct sequence of documents in order of precedence, with the document
highest in authority listed first.

A. Contract Plans, Development Specifications, Standard Specifications, Special
Provisions, Technical Special Provisions, Supplemental Specifications, Design
Standards.

B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental
Specifications, Contract Plans, development Specifications, Standard Specifications.

C. Special Provisions, Technical Special Provisions, Contract Plans, Design Standards,
Development Specifications, Supplemental Specifications, Standard Specifications.

D. Supplemental Specifications, Special Provisions, Contract Plans, Development
Specifications, Standards Specifications, Technical Special Provisions, Design
Standards.

E. None of the above. - CORRECT ANSWER-C. Special Provisions, Technical Special
Provisions, Contract Plans, Design Standards, Development Specifications,
Supplemental Specifications, Standard Specifications.



True or False. When checked and verified, final estimates serve as the basis for Final
Payment. - CORRECT ANSWER-True



Which of the following sets for the Department's methods and Procedures for preparing
and checking final estimates?



A. Construction Inspection Mathematics

B. Project Engineer

, C. Preparation and Documentation Manual

D. CPAM - CORRECT ANSWER-C. Preparation and Documentation Manual



Please match the appropriate documentation name with the correct description below:

A. [Final Plans]: For reviewing contract time charges before clearing estimates for final
payment; [Computation Books]: Documents pertinent changes during construction and
show the "as-built' condition; [Field Books]: Contains alignment notes and cross section
notes, etc.

B. [Construction Diaries]: For reviewing contract time charges before clearing estimates
for final payment; [Final Plans]: Documents pertinent changes during construction and
show the "as-built' conditions; [Field Books]: Contains alignment notes and cross
section notes, etc.

C. [Final Plans]: For reviewing contract time charges before clearing estimates for final
payment; [Tabulation Forms]: Documents pertinent changes during construction and
show the "as-built' conditions; [Field Books]: Contains alignment notes and cross
section notes, etc.

D. [Final Plans]: For r - CORRECT ANSWER-B. [Construction Diaries]: For reviewing
contract time charges before clearing estimates for final payment; [Final Plans]:
Documents pertinent changes during construction and show the "as-built' conditions;
[Field Books]: Contains alignment notes and cross section notes, etc.



When using calculators or computers, you should use the:



A. Rules of rounding described in CONSTRUCTION MATH.

B. Full decimal capabilities of the machine

C. CPAM as a guide to rounding

D. Machine only as a backup to your manual computations

E. None of the above - CORRECT ANSWER-B. Full decimal capabilities of the machine
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
remojudytask Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
82
Miembro desde
2 año
Número de seguidores
30
Documentos
3120
Última venta
5 días hace

3.2

25 reseñas

5
6
4
3
3
11
2
0
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes