©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 11:08AM. A+ 1 Foreman Certification Exam Questions And Answers |Latest 2025 | Guaranteed Pass. Which of the following would be considered a prime contractor? - AnswerA contractor with whom the project owner has established a contract Which of the following correctly identifies which is included in legitimate labor costs? - AnswerHourly wages, fringe benefit packages, payroll taxes, insurance and safety costs, and small tools and consumables Which of the following best illustrates the PRIMARY role of a foreman? - Answerto effectively manage and lead the crew As a foreman what should ALWAYS be your FIRST priority when planning for a job? - Answerto effectively manage and lead the crew which of the following is involved in pre-construction planning? - Answerdeveloping a job strategy before the job begins which of the following describe the purpose of "Short interval planning"? - Answerbreaking the job into small manageable pieces which of the following is the FIRST thing a foreman must do before beginning to plan a job? - Answerread all project related documents Which of the following provides the BEST examples of prefabriaction? - Answerto create a product in the shop and install it in the field Which of the following is NOT required on a daily log? - Answerthe work completed by individual crew members Which of the following is NOT likely to lead to improved material handling? - Answerhave all material and equipment delivered at the beginning of the job Which of the following purchasing procedures is MOST likely to reduce material handling time? - Answerbag and tag all materials as appropriate What should a foreman do if damage to a shipment is discovered AFTER the delivery driver has left the job site? - Answernotify the project manager and note the damage on the daily log ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 11:08AM. A+ 2 Which of the following locations represents the BEST place to store job site materials in a manner that enhances productivity? - Answeras close to the point of installation as possible which of the following costs should a foreman be MOST concerned? - Answerlabor Which of the following is NOT considered a direct job cost? - Answerhome office overhead An ____________ occurs when any condition or document modifies the work as defined in the contract documents during the bidding process. - Answeraddendum Where can the requirements for "Job Close Out" be found? - Answerwithin the contract documents During the course of a project you have noticed that there is a greater than normal number of change orders being submitted. Which of the following is the MOST important step that you need to take? - AnswerMaintain an accurate job Log in case specific questions are asked about why the project was completed in the way it was A "Log Book" or "Job Log" is the most appropriate place to document which of the following? - Answerthe events that occurred on the jobsite each day certain steps are typically followed when starting a job. Among those listed below, which of the following options correctly identifies the order these steps should be completed? - Answersketch, layout, order material, install When is the BEST time for a foreman to hold information sharing "Toolbox Safety Talks" - Answerregularly on a weekly basis to address safety issues and learn about new tools or materials The big documents associated with your project state "do not remove or disturb any asbestos containing material (ACM)." You have three days before a planned outage/shutdown to remove a 12-inch insulated gate valve that you suspect has an asbestos covering. What should you do? - Answerverify insulation material While creating the rough layout for a piping project, you discover a problem with the 2'' hot water supply and hot water return piping. By following the design specifications you determine that these pipes will be interfering with the sheet metal subcontractor's 48'' duct work. Which of the following actions should the piping foreman take? - Answer As a general rule, when is the BEST time for a foreman to schedule effective meetings with their work crew? - Answerat the beginning of a shift Which of the following represents an effective way to ensure that the job is progressing within the allotted budget? - Answerkeep a log of man hours used and compare it to the percentage of the job completed Assume each of the following steps below

Mostrar más Leer menos
Institución
Foreman Certification
Grado
Foreman Certification









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Foreman Certification
Grado
Foreman Certification

Información del documento

Subido en
17 de febrero de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 11:08AM. A+




Foreman Certification Exam Questions And
Answers |Latest 2025 | Guaranteed Pass.


Which of the following would be considered a prime contractor? - Answer✔A contractor with
whom the project owner has established a contract
Which of the following correctly identifies which is included in legitimate labor costs? -
Answer✔Hourly wages, fringe benefit packages, payroll taxes, insurance and safety costs, and
small tools and consumables

Which of the following best illustrates the PRIMARY role of a foreman? - Answer✔to effectively
manage and lead the crew
As a foreman what should ALWAYS be your FIRST priority when planning for a job? -
Answer✔to effectively manage and lead the crew

which of the following is involved in pre-construction planning? - Answer✔developing a job
strategy before the job begins

which of the following describe the purpose of "Short interval planning"? - Answer✔breaking
the job into small manageable pieces
which of the following is the FIRST thing a foreman must do before beginning to plan a job? -
Answer✔read all project related documents

Which of the following provides the BEST examples of prefabriaction? - Answer✔to create a
product in the shop and install it in the field

Which of the following is NOT required on a daily log? - Answer✔the work completed by
individual crew members

Which of the following is NOT likely to lead to improved material handling? - Answer✔have all
material and equipment delivered at the beginning of the job
Which of the following purchasing procedures is MOST likely to reduce material handling time?
- Answer✔bag and tag all materials as appropriate
What should a foreman do if damage to a shipment is discovered AFTER the delivery driver has
left the job site? - Answer✔notify the project manager and note the damage on the daily log

1

, ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 11:08AM. A+


Which of the following locations represents the BEST place to store job site materials in a
manner that enhances productivity? - Answer✔as close to the point of installation as possible

which of the following costs should a foreman be MOST concerned? - Answer✔labor

Which of the following is NOT considered a direct job cost? - Answer✔home office overhead
An ____________ occurs when any condition or document modifies the work as defined in the
contract documents during the bidding process. - Answer✔addendum

Where can the requirements for "Job Close Out" be found? - Answer✔within the contract
documents
During the course of a project you have noticed that there is a greater than normal number of
change orders being submitted. Which of the following is the MOST important step that you
need to take? - Answer✔Maintain an accurate job Log in case specific questions are asked
about why the project was completed in the way it was
A "Log Book" or "Job Log" is the most appropriate place to document which of the following? -
Answer✔the events that occurred on the jobsite each day
certain steps are typically followed when starting a job. Among those listed below, which of the
following options correctly identifies the order these steps should be completed? -
Answer✔sketch, layout, order material, install
When is the BEST time for a foreman to hold information sharing "Toolbox Safety Talks" -
Answer✔regularly on a weekly basis to address safety issues and learn about new tools or
materials
The big documents associated with your project state "do not remove or disturb any asbestos
containing material (ACM)." You have three days before a planned outage/shutdown to remove
a 12-inch insulated gate valve that you suspect has an asbestos covering. What should you do? -
Answer✔verify insulation material
While creating the rough layout for a piping project, you discover a problem with the 2'' hot
water supply and hot water return piping. By following the design specifications you determine
that these pipes will be interfering with the sheet metal subcontractor's 48'' duct work. Which
of the following actions should the piping foreman take? - Answer✔
As a general rule, when is the BEST time for a foreman to schedule effective meetings with their
work crew? - Answer✔at the beginning of a shift
Which of the following represents an effective way to ensure that the job is progressing within
the allotted budget? - Answer✔keep a log of man hours used and compare it to the percentage
of the job completed
Assume each of the following steps below must be taken at some point when ordering
materials:

2
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Fyndlay Kaplan University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
352
Miembro desde
1 año
Número de seguidores
80
Documentos
18285
Última venta
1 semana hace
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reseñas

5
32
4
8
3
13
2
6
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes