100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

GE CCC Exam with Answers 100% Correct

Puntuación
-
Vendido
-
Páginas
24
Grado
A+
Subido en
30-01-2025
Escrito en
2024/2025

GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct GE CCC Exam with Answers 100% Correct

Mostrar más Leer menos
Institución
GE CCC
Grado
GE CCC










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
GE CCC
Grado
GE CCC

Información del documento

Subido en
30 de enero de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

GE CCC Exam with answErs 100% CorrECt
Define: General Engineering ✔✔ Those engineering capabilities and activities, other than combat
engineering, that modify, maintain, or protect the physical environment.



Examples include: the construction, repair, maintenance, and operation of infrastructure, facilities, lines
of communication and bases; terrain modification and repair; and selected explosive hazards activities.

(ATP 3-34.40 General Engineering)

Two Levels of Quality Control (QC) ✔✔ 1. Unit - The unit's QC manager and assigned QC specialists
perform and direct activities to execute the unit-level QC program.



2. Project - Project managers and project supervisors perform and direct activities to develop an
individual project QC plan.



Inspections ✔✔ Vital Part of Controlling Quality



• Measure performance against a standard



• Determine the magnitude of the problem(s)



• Seek the root cause(s) of the problem(s)



• Determine a solution



• Assign responsibility to the appropriate individuals or agencies



Reports ✔✔ Reports should list, for each phase of control, the factual results of control actions taken,
observations made, and any remedial and corrective actions.



The frequency of reporting or time for submitting reports must be indicated on the Quality Control Plan

,Performance Work Statement ✔✔ •Keys to a good PWS:

1) Use performance based language

2) Prevent contractor shortcuts

3) Prevent contractor shortcuts.



•Altering the contract costs a lot more money, effort and time than doing it right the first time.



All elements of: Construction Activity (JCMS) ✔✔ 1. NSN's



2. Resources



3. Drawings



4. Support Files



5. TOGs (Theater Oriented Guide Specifications)

- Describe the processes, procedures and construction standard for the associated sequence.

- Ex. Masonry specifications



Power Law



P = ? ✔✔ P = I * E



P (watts) = I (amps) * E (volts)



1 hp = ____ watts ✔✔ 746 watts = 1 hp



Ohm's Law

, R = ? ✔✔ R (ohms) = E / I



Demand Load ✔✔ Demand Load = Total Connected Load * Demand Factor



DL = CL * DF



% Motor Load ✔✔ %ML = (TML/TDL)*100



% ML = ( Total Motor Load (kW) / Total Demand Load (kw)) * 100



Generator Capacity ✔✔ Generator Capacity = Total Demand Load * Generator Factor



GC = TDL * GF



Generator Load Balancing



Determine if the loads are within 10% ✔✔ I (min) * 1.10 > I (max)



Construction Projects can be broken down into three types: ✔✔ - Permanent

• Life expectancy greater than 25 years

• Low maintenance cost

• Only executed by USACE



- Semi-permanent

• Life expectancy between 5 and 25 years

• Only executed by USACE

• Troop construction may be used
$14.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Solution001Master Liberty
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
144
Miembro desde
4 año
Número de seguidores
108
Documentos
3924
Última venta
3 semanas hace
BEST TESTBANK WOLRD

Welcome to the home of all new and latest updated Test Banks,study Guide And Exams All at affordable prizes . Thank You and all the best as you study

3.7

33 reseñas

5
13
4
6
3
9
2
0
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes