100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Solutions Manual for Electrical Wiring Commercial 18th Edition by Phil Simmons Graded A+

Puntuación
-
Vendido
-
Páginas
132
Grado
A+
Subido en
30-01-2025
Escrito en
2024/2025

Solution and Answer Guide SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTER 1 : : COMMERCIAL BUILDING PLANS AND SPECIFICATIONS TABLE OF CONTENTS Review .......................................................................................................................................................... 1 Note to instructor : : It is recommended that students be required to respond, where appropriate, with answers that are complete sentences. REVIEW Refer to the National Electrical Code or the working drawings when necessary. Where applicable, responses should be written in complete sentences. 1. What section of a commercial building’s specification contains a list of contract documents? Answer : : A list of the contract documents is contained in General Clauses and Conditions. A listing of the Commercial Building contract documents is presented in this chapter under the heading “Commercial Building Plans.” The instructor may wish to have the students check over this listing and compare it with the plans provided. 2. The requirement for temporary light and power at the job site will be found in what portion of a commercial building’s specification? Answer : : The Supplementary General Conditions specifies the job site requirements for temporary light and power. In some contracts, this electrical system becomes the responsibility of the general contractor; in other contracts, it is the electrical contractor’s responsibility to install and maintain the temporary electrical system. The instructor may wish to refer the student to NEC Article 590 and discuss the requirements in detail. 3. The electrician uses the Schedule of Working Drawings for what purpose? Answer : : The electrician uses the Schedule of Working Drawings to determine whether all of the drawings are at hand. The information on “the other sheets” may be very important, especially in coordinating with other contractors. 4. Complete the following items by indicating the letter(s) designating the correct source(s) of information : : No. Answer Item Information 4. Sections Ceiling height Sections, Sheet A6 5. Electrical Electrical receptacle Electrical symbol schedule, Chapter symbol style 2, Figure 2–6 schedule 6. Electrical Electrical outlet Electrical layout drawings, Sheets layout location El, E2, and E3 drawings 7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5 8. Site plan Grading elevations Site plan, Sheet A4 9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4 layout drawings 10. Architectural Room width Architectural floor plan, Sheets Al, floor plan A2, and A3 11. Architectural Swing of door Architectural floor plan, Sheets Al, floor plan A2, and A3 12. Sections View of interior wall Sections, Sheet A6 Match the items on the left with those on the right by writing the letter designation of the appropriate organization from the list on the right. 13. NEC Electri

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
30 de enero de 2025
Número de páginas
132
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Solutions Manual for

Electrical Wiring Commercial

18th Edition by Phil Simmons

Graded A+

, Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1 : : COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS

Review ..........................................................................................................................................................
1



Note to instructor : : It is recommended that students be required to respond, where appropriate,
with answers that are complete sentences.



REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer : : A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer : : The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility of
the general contractor; in other contracts, it is the electrical contractor’s responsibility to install
and maintain the temporary electrical system. The instructor may wish to refer the student to
NEC Article 590 and discuss the requirements in detail.

,3. The electrician uses the Schedule of Working Drawings for what purpose?
Answer : : The electrician uses the Schedule of Working Drawings to determine whether all of
the drawings are at hand. The information on “the other sheets” may be very important,
especially in coordinating with other contractors.
4. Complete the following items by indicating the letter(s) designating the correct source(s)
of information : :
No. Answer Item Information

4. Sections Ceiling height Sections, Sheet A6

5. Electrical Electrical receptacle Electrical symbol schedule, Chapter symbol style
2, Figure 2–6 schedule

6. Electrical Electrical outlet Electrical layout drawings, Sheets
layout location El, E2, and E3 drawings

7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5

8. Site plan Grading elevations Site plan, Sheet A4

9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4 layout
drawings

10. Architectural Room width Architectural floor plan, Sheets Al, floor plan A2,
and A3

11. Architectural Swing of door Architectural floor plan, Sheets Al, floor plan A2,
and A3

12. Sections View of interior wall Sections, Sheet A6

Match the items on the left with those on the right by writing the letter designation of
the appropriate organization from the list on the right.

, 13. NEC Electrical Code National Electrical Code (NEC)

14. IAEI Electrical inspectors International Association of
Electrical Inspectors (IAEI)


15. NFPA Fire codes National Fire Protection Association
(NFPA)

16. IESNA Lighting information Illuminating Engineering
Society of North America
(IESNA)

17. UL Listing service Underwriters Laboratories, Inc.
(UL)

18. NEMA Manufacturers’ National Electrical standards Manufacturers
Association
(NEMA)

19. PE Seal Professional Engineer (PE)


Match the items on the left with those on the right by writing the letter
designation of the proper level of NEC interpretation from the list on the
right.


20. with Allowed by the Code Shall be permitted, or Shall not special be required,
NEC permission

21. with May be done Shall be permitted, or Shall not

special be required, NEC permission

22. shall Must be done Shall, National Electrical Code

23. shall Required by the Code Shall, National Electrical Code
$17.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutor23 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
14
Miembro desde
1 año
Número de seguidores
4
Documentos
71
Última venta
7 meses hace
online top tutor 2024

all updated documents

1.3

3 reseñas

5
0
4
0
3
0
2
1
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes