ARE 5.0 Construction & Evaluation UPDATED ACTUAL Exam Questions and CORRECT Answers Competitive bid - CORRECT ANSWER - Can be public or private and involves more than 1 contractor Negotiated Bid - CORRECT ANSWER - For privately funded projects, Owner and Architect work with 1 GC to reach a price

Mostrar más Leer menos
Institución
ARE 5.0
Grado
ARE 5.0










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ARE 5.0
Grado
ARE 5.0

Información del documento

Subido en
30 de enero de 2025
Número de páginas
28
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ARE 5.0 Construction & Evaluation
UPDATED ACTUAL Exam Questions and
CORRECT Answers
Competitive bid - CORRECT ANSWER - Can be public or private and involves more than 1
contractor


Negotiated Bid - CORRECT ANSWER - For privately funded projects, Owner and Architect
work with 1 GC to reach a price


Why would an Owner hire a Construction Manager as Adviser (CMa)? - CORRECT
ANSWER - To assist in project delivery by providing cost estimating, scheduling, and
construction contract management services to the Owner


Which project delivery limits the role and responsibilities of the Architect during
preconstruction? - CORRECT ANSWER - IPD



Who is responsible for cost control in design-build delivery? - CORRECT ANSWER - The
GC (Architect is responsible for controlling cost of design services)


Who must approve a proposed substitution? If approved, what is done with the proposal? -
CORRECT ANSWER - Architect. If approved, it becomes an addendum to be included in the
bid documents


Who is the only party who guarantees by contract all construction costs? - CORRECT
ANSWER - GC


At a public hearing, which two items are announced by the Architect after each bid is opened? -
CORRECT ANSWER - - Bid amount
- Whether bidder has submitted the required supporting documentation

,According to B101 (O+A), what form of dispute resolution must be tried before arbitration? -
CORRECT ANSWER - Mediation


What other construction delivery method is most similar to the Construction Manager as
Constructor (CMc) with regard to the many roles and responsibilities of the Architect? -
CORRECT ANSWER - Design-Bid-Build


During agency review, what is the Architect's role in an IPD project? - CORRECT
ANSWER - Working with AHJ to show code compliance related to the BIM model



What is the purpose of the Architect's site observation? - CORRECT ANSWER - - Becoming
generally familiar w/ progress and quality of the work & to keep Owner informed
- Endeavoring to guard Owner against defects and deficiencies in the work
- Determining if the work is progressing in such a way that it will be in accordance w/ CDs when
completed


What is the Architect not responsible for during the construction of the project? - CORRECT
ANSWER - - Exhaustive or continuous on-site inspections
- Means and methods of construction
- Site safety


Who pays for additional field testing if the work does not conform with the contract documents?
- CORRECT ANSWER - GC pays to correct the work, subsequent testing, and compensation
for Architect's services related to the issue


During construction, why must the Architect speak directly to the GC and not the
subcontractors? - CORRECT ANSWER - Architect is an agent of the Owner who does not
have a contractual relationship with subcontractors


Which document defines the lines of communication among parties during CA? - CORRECT
ANSWER - A201 - General Conditions of the Contract for Construction

, Through whom must the owner and GC communicate during CA? - CORRECT ANSWER -
Architect


Who will pay for work to be uncovered when the work was covered contrary to the architect's
request? - CORRECT ANSWER - GC


If uncovered work is determined to meet project requirements, and the architect had not
previously requested that it remain uncovered, who pays to uncover and replace the work? -
CORRECT ANSWER - Owner



Special Inspections - CORRECT ANSWER - Required by Ch. 17 IBC, verifies that work is
being performed in accordance with AHJ-approved plans and specifications (ex. pre-fab items,
steel, concrete, spray-fireproofing)


Who prepares the Statement of Special Inspections? - CORRECT ANSWER - Architect
develops, then submits to AHJ officials for review and approval; Owner must hire and pay an
independent (not GC) firm to do the inspection work; results are submitted to code officials for
approval


Pre-Construction Conference - CORRECT ANSWER - Organized by Architect; provides
design and construction team members with an understanding of project procedures,
requirements, due dates, and special characteristics


How is "contract time" defined? - CORRECT ANSWER - Starts at date established in the
agreement and ends at Substantial Completion


Which party has sole responsibility for the means and methods of construction? - CORRECT
ANSWER - GC


What two parties should each receive a copy of an Architect's field reports? - CORRECT
ANSWER - Owner and GC
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1053
Miembro desde
1 año
Número de seguidores
100
Documentos
68976
Última venta
4 horas hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reseñas

5
72
4
30
3
42
2
8
1
14

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes