100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CESSWI PART I Exam Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
28
Grado
A+
Subido en
23-01-2025
Escrito en
2024/2025

CESSWI PART I Exam Questions and Answers 100% Pass CESSWI is qualified to preform what inspections? - Construction, post construction, industrial, MS4 Clean Water Act year of creation and intent of law - 1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US CWA Section 402 - Est. NPDES System, originally focused on industrial process waste water and POTW CWA Section 404 - regulated impacts to waters of the US, typically associated with a 401 certification CWA Section 401 - Regulates water quality impacts and state cert systems, required permit issued by a federal agency for any activity that may discharge a pollutant, Applies heavily in industrial sites CWA Section 303 - Establishes Water quality standards Stormwater discharge definition - stormwater runoff, snow melt runoff, and surface runoff/drainage 2Katelyn Whitman, All Rights Reserved © 2025 To be subject to NPDES rules, stormwater must: - be in a discernible conveyance Definitions of waters of the US - All waters used in interstate or foreign commerce, including those subject to tidal flows o All interstate waters, including interstate wetlands o All INTRAstate lakes, rivers, streams (intermittent also), mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lake, or natural ponds that the destruction of which would affect interstate/foreign co

Mostrar más Leer menos
Institución
CESSWI
Grado
CESSWI










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CESSWI
Grado
CESSWI

Información del documento

Subido en
23 de enero de 2025
Número de páginas
28
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CESSWI PART I Exam Questions and
Answers 100% Pass


CESSWI is qualified to preform what inspections? - ✔✔Construction, post construction,

industrial, MS4


Clean Water Act year of creation and intent of law - ✔✔1972, enacted to restore and

maintain the physical, bio, chem integrity of the waters of the US


CWA Section 402 - ✔✔Est. NPDES System, originally focused on industrial process

waste water and POTW


CWA Section 404 - ✔✔regulated impacts to waters of the US, typically associated with a

401 certification


CWA Section 401 - ✔✔Regulates water quality impacts and state cert systems, required

permit issued by a federal agency for any activity that may discharge a pollutant,

Applies heavily in industrial sites


CWA Section 303 - ✔✔Establishes Water quality standards


Stormwater discharge definition - ✔✔stormwater runoff, snow melt runoff, and surface

runoff/drainage



Katelyn Whitman, All Rights Reserved © 2025 1

,To be subject to NPDES rules, stormwater must: - ✔✔be in a discernible conveyance


Definitions of waters of the US - ✔✔All waters used in interstate or foreign commerce,

including those subject to tidal flows


o All interstate waters, including interstate wetlands


o All INTRAstate lakes, rivers, streams (intermittent also), mudflats, sand flats,

wetlands, sloughs, prairie potholes, wet meadows, playa lake, or natural ponds that the

destruction of which would affect interstate/foreign commerce including those which:


Could be used for recreational or other purposes


From which shellfish or fish could be retrieved and sold


Could be used for industrial purposes


o All impoundments of water defined by waters of the US by the above


o Tributaries of the waters defined above


o The territorial sea


o Wetlands adjacent to any of the waters defined above


Beneficial Uses definition - ✔✔Uses necessary for the survival of and well-being of

people, plants, and wildlife




Katelyn Whitman, All Rights Reserved © 2025 2

, Water quality standards definition - ✔✔state or tribal requirements that define the

water quality goals of a lake stream or other wateerbody by designation the benefical

uses and setting criteria to protect those uses


Section 303d - ✔✔est a process for states, territories, and tribes to i.d. impaired waters,

also referred to as water quality limited


TMDL - ✔✔id's the amount of a specific pollutnant that may be dicharged to a water

body, states are responsible for implementing


Waste load allocations - ✔✔allocations of pollutant loadings to point sources


TMDL Implementation - ✔✔Define waste load allocation, develop implementation plan

to connect allocations and permits, translate allocations to permit conditions.


Origin of NPDES stormwater regs - ✔✔NURP studies showed stormwater had many of

the same qualities of commercial, industrial areas


NPDES Phase I and II regs implemented via - ✔✔General permits for a group of similar

dischagers such as consutruction industry, industrial, utilities


Individual permits for a single entity, facility or project


Phase I NPDES Permits ID'd as: - ✔✔Industrial activity


Construction activity <5 acres


Cities over 100k population



Katelyn Whitman, All Rights Reserved © 2025 3
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KatelynWhitman West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1094
Miembro desde
2 año
Número de seguidores
482
Documentos
33057
Última venta
3 días hace
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online&amp; Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&amp;A MATERIALS.

3.6

238 reseñas

5
95
4
38
3
54
2
20
1
31

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes