QSP LASTEST EXAM QUESTIONS AND
ANSWERS

When does the CGP apply? - ANSWER>>Any construction or demolition of
one acre or more

Activities under the CGP include:
a. Routine maintenance to maintain original line and grade, hydraulic
capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - ANSWER>>C

TRUE OR FALSE: if construction of an LUP will occur across several
properties, the utility company, municipality, or other public/private
company/agency that owns or operates the LUP project is responsible for
obtaining coverage - ANSWER>>True

Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - ANSWER>>B

All NAL data must be uploaded within ___ after NAL exceedance has been
identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - ANSWER>>C

Who must file Permit Registration Documents (PRDs) prior to the
commencement of construction activity?
a. Qualified SWPPP Developer (QSD)

, b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - ANSWER>>B

Which regulation establishes a framework for regulating municipal and
industrial storm water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - ANSWER>>A

Certain non-storm water discharges may be necessary for the completion
of construction projects. Therefore the General Permit authorizes such
discharges provided they meet the following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance -
ANSWER>>E

When possible, use erosion controls as the ___ protection, with sediment
controls as a ___system.
a. primary, secondary
b. secondary, primary - ANSWER>>A

A temporary or permanent structural BMP that directs concentrated flows
away from disturbed areas and prevents erosion is...
a. erosion control
b. run on/ run off control
c. sediment control - ANSWER>>B

The amount of eroded soil that settles out at a point in the watershed that is
remote from the origin of the detached soil particles is...

Información del documento

Subido en
22 de enero de 2025
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
1316
Última venta
6 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes