A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - ANSWER c. 4 hours The following would be considered non-critical plant load (Select 2) - ANSWER A. Office Area Air Conditioners C. Lighting During a Cold Weather Alert, PJM will take which of the actions - ANSWER D. Assume an unavailability rate for schedule generation

Mostrar más Leer menos
Institución
PJM Generation
Grado
PJM Generation










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation
Grado
PJM Generation

Información del documento

Subido en
22 de enero de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Practice questions & Answers(RATED
A+)
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual
implementation. - ANSWER c. 4 hours

The following would be considered non-critical plant load (Select 2) - ANSWER A.
Office Area Air Conditioners
C. Lighting

During a Cold Weather Alert, PJM will take which of the actions - ANSWER D. Assume
an unavailability rate for schedule generation

When PJM issues a High System Voltage Message, the GO should have its units
operate at: - ANSWER B. The lower end of their voltage bandwidth

What would the reportable Emergency Reducible Generation be if the Generator Output
is 400 MW, Economic Min is 225 MW and the Emergency Min is 175 MW - ANSWER C.
50 MW

PJM can issue the Deploy All Resources Action for - ANSWER D. The entire RTO,
specific Control Zones, or a subset of a Control Zone if transmission limitations exist

PJM has issued a Minimum Generation Alert. Your current generation is 200 MW. The
Economic Minimum is 150 MW and the Emergency Min is 125 MW. How much ERG
should be reported for this unit? - ANSWER B. 25MW

Which of the following steps would PJM take as part of initiating Conservative
Operations? (Select 2) - ANSWER A. Perform job studies looking at the loss of multiple
pieces of equipment as a single event

C. Initiate additional off-cost operation to limit or reduce flows across critical interfaces

The purpose of the Deploy All Resources Action is to instruct all generating resources to
be on line and at full output ____ - ANSWER D. Immediately upon receipt of dispatch
instructions

Under the National Terrorism Advisory System (NTAS) there are two types of alerts:
Elevated Threat Alert and - ANSWER A. Imminent Threat Alert

What is the requested response time for members to reply to a request for SSR data? -
ANSWER A. 10 minutes

,You are a Generation Owner with the following units. PJM has just requested a
Supplementary Status Report (SSR). what do you report as your total "On Cost" Steam
Capacity

U1: ECO max, 145 - EMR max 145 Current output 140
U2 ECO max, 550 - EMR max 145 Current output 400
U3 ECO max, 400, EMR max 410 Current output - ANSWER 1095MW

Why does PJM require an additional notification time of Unit testing 30 minutes prior to
the GO/MOC performing the reactive capability testing? - ANSWER C. To allow PJM
and TOs to make adjustments to system voltages prior to test

When an outage requires verbal notification to PJM which PJM personnel should be
contacted? - ANSWER B. Master Coordinator

One of the leading causes of the 1999 Low Voltage event in PJM was ___ - ANSWER
B. PJM's EMS at that time had only nameplate D-curve data for

With whom does PJM share the results of generation reactive capability tests? -
ANSWER A. The affected TO

With the exception of intermittent resources, Over-excited (Lagging) test results are the
values of MVAR output that can be sustained for how long? - ANSWER D. 60 min

During the PJM Peak Period Maintenance Season whit is the max amount of
consecutive days the outage can last? - ANSWER C. 9

When PJM requests a Reactive Reserve Check (RRC), how does the GO/MOC report
limitations or restrictions on their unit which would prevent it from being able to follow it's
reactive capability curve as recorded in eDART - ANSWER A. By notifying the effect TO

What is the min time needed to submit a reactive capability test ticket via eDARt prior to
performing the test? - ANSWER C. 3 business days

A unit (or intermittent facility) will be considered as having passed their capability test
and require no further action if their test results are within ___ of the stated limits -
ANSWER D. 5%

Even if no changes are made, MOCs/GOs must review and confirm their unit reactive
capability via eDARt how ofter? - ANSWER D. Twice per year

What is the penalty for units that do not meet their stated reactive capability during
reactive capability - ANSWER B. There is no penalty

When submitted expected capability for "new" units, what reactive capability should be
used? - ANSWER B. Vendor supplied D-curves

, Which of the following statements would be considered as an implication from receiving
power from an outside entity? - ANSWER B. Unintentional interconnection between the
two areas

Which of the following statements is correct concerning PJM assuming frequency of the
restoration process? - ANSWER B. Whenever it becomes too much of a burden for any
one transmission owner within the RTO

Factors that help to determine the sequence of restoration of offline generation include:
- ANSWER A. Unit availability
D. Generation type

Concerning the PJM requirements for critical Blackstart Generation, which of the
following statements applies to the unit's capability to maintain frequency? (select 2) -
ANSWER A. Picking up an isolated block of loads

D. Dynamic offline testing of the unit's governor control

Which of the following would be considered pre-tie preparations when interconnecting
islands? (Select 2)

A. Identification of the transmission line to tie areas together
B. Recalculation of reserves
C. Provide updated hydroelectric capability
D. Ensure reliable communications are available for all entities involved in the
interconnection process - ANSWER A. Identification of the transmission line to tie areas
together
D. Ensure reliable communications are available for all entities involved in the
interconnection process

According to the NERC Standard EOP-005-2, Requirement 9, each TOP shall have
Blackstart Testing requirements in place to verify the capability of each generation
resource to meet the restoration plan requirements. Under this process, each generator
shall be tested at least once every - ANSWER B. 3 years

Which of the following statements is TRUE concerning a system voltage collapse?
(Select 2) - ANSWER B. Through analysis, the boundaries of separation can be
predicted in advance of a voltage collapse
C. Low reactive loading will cause a deficit in MVAR supply


Transmission Owners must include available cranking power and transmission paths in
their individual restoration manuals

True or False - ANSWER True
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lecchris West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
40
Miembro desde
2 año
Número de seguidores
15
Documentos
3203
Última venta
2 semanas hace
LECCHRIS

3.8

6 reseñas

5
2
4
1
3
3
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes