Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CHC Practice Questions with correct answers

Puntuación
-
Vendido
-
Páginas
44
Grado
A+
Subido en
17-01-2025
Escrito en
2024/2025

According to NFPA 99-1999, to which branch of the essential electrical system are the medical gas alarm panels connected? a) Life Safety b) Critical c) Equipment d) Non-essential a) Life Safety In accordance with the interim Life Safety Measures, when temp fire alarm systems are provided, how often must they be tested? a) Weekly b) Monthly c) Semi-annually d) Quarterly b) Monthly Which of the following should not be included in a capital budget for replacement of a central chiller? a) Design Fees b) Cost of removal of the old chiller c) Commissioning d) Service Contract d) Service Contract The emergency PA system has just announced a code blue in the area which you are working. What is the best course of action? a) Evacuate the area in which you are working and leave all tools behind. b) Move al work equipment and tools out of the travel paths and keep travel paths clear. c) Continue to work and advice the the hospital's project manager. d) Evacuate and remove all equipment and tools from the area. b) Move al work equipment and tools out of the travel paths and keep travel paths clear. Any project requires that the piped gas system be shut down and O2 supplied by portable cylinders. A storage area has been set aside for cylinders (23.5 cu ft per cylinder). What is the max number of cylinders that can be stored in the unit? a) 10 b) 12 c) 14 d) 16 b) 12 Max 300 CF A multiphase project will require you to alter egress patterns for several units, the ICU, TCU, and MICU. In some instances, required exists will lead to an active construction site. What ILSM's are most appropriate. a) Provide temp exit signage in affected areas and monitor egress paths to ensure that they remain clear. b) Develop and identify new exit routes, train staff in affected areas, and increase fire drills. c) Provide temp exit signage, implement a fire watch, and document all activities. d) Provide temp exit signage, notify the fire department, and perform additional fire drills. b) Develop and identify new exit routes, train staff in affected areas, and increase fire drills. A renovation project is underway on a nursing unit. The egress corridor is 10'6 wide with a 20" WOW in the corridor and ABHR dispensers that project 4" into the corridor. How much of the corridor can be used to store construction supplies. a) As much as 2'6 provided materials are stored between WOW's b) Materials may be stored against the wall to a maximum width of 8". c) No materials may be stored in the corridor. d) As much as 2'2" provided materials are stored between the WOW's c) No materials may be stored in the corridor. Your estimate is over budget. The owner has expressed a desire to reduce the cost by eliminating the central energy plant and replacing the chillers with direct expansion units. Other than energy efficiency, what other variables should be included in this discussion? a) Projected life, replacement costs, future expansion plans. b) Maintenance and repair costs, salvage value c) Maintenance and repair costs, replacement costs. d) Projected life, maintenance and repair costs, replacement costs. d) Projected life, maintenance and repair costs, replacement costs. According to ASHRAE 170-2008, what is the minimum supply air volume for a 20x20x15 class A operating room? a) 1000 CFM b) 1500 CFM c) 2000 CFM d) 2500 CFM b) 1500 CFM 15-20 Air changes per hour. As you arrive at work, you are notified that the hospital has implemented their EOP overnight. As the project manager, which best describes the steps you should take in order of priority. a) Cease work contract the facility manager for more details, and resume work if adequate power is available. b) Contract the owner's representative and ask for further instructions. c) Cease work, contract inspection Preventionist for instructions. d) Cease work, secure materials and tools as possible, wait for further instructions. b) Contract the owner's representative and ask for further instructions. In which of the following stages of a construction project is an infection control risk assessment best initiated? a) Programming b) Project Mobilization c) Construction Phase d) Commissioning a) Programming Which 1996 Act of Congress requires that patient information remain confidential? a)Health Insurance Portability and Accountability Act b)Health Insurance Protection and Profitability Act c) Health Information Protection and Portability Act d) Health Information Protection and Portability Act. a)Health Insurance Portability and Accountability Act Which of the following is the proper tubing to install in a hospital type 1 oxygen system? a) ASTM 8819 Hard drawn seamless medical gas tubing b) AST MG327 medical gas copper tubing c) Hard drawing seamless coper high pressure rated tubing d) ASGRAW 189 medical gas

Mostrar más Leer menos
Institución
CHC Practice
Grado
CHC Practice

Vista previa del contenido

CHC Practice Questions
hj hj




AccordinghjtohjNFPAhj99-
1999,hjtohjwhichhjbranchhjofhjthehjessentialhjelectricalhjsystemhjarehjthehjmedicalhjgashjalarmhjpanelshjconn
ected?
a)hjLifehjSafety
b)hjCritical
c)hjEquipment
d)hjNon-essential a)hjLifehjSafety
InhjaccordancehjwithhjthehjinterimhjLifehjSafetyhjMeasures,hjwhenhjtemphjfirehjalarmhjsystemshjarehjprovid
ed,hjhowhjoftenhjmusthjtheyhjbehjtested?
a)hjWeekly
b)hjMonthly
c)hjSemi-annually
d)hjQuarterly b)hjMonthly
Whichhjofhjthehjfollowinghjshouldhjnothjbehjincludedhjinhjahjcapitalhjbudgethjforhjreplacementhjofhjahjcentral
hjchiller?

a)hjDesignhjFees
b)hjCosthjofhjremovalhjofhjthehjoldhjchiller
c)hjCommissioning
d)hjServicehjContract d)hjServicehjContract
ThehjemergencyhjPAhjsystemhjhashjjusthjannouncedhjahjcodehjbluehjinhjthehjareahjwhichhjyouhjarehjworking.h
jWhathjishjthehjbesthjcoursehjofhjaction?

a)hjEvacuatehjthehjareahjinhjwhichhjyouhjarehjworkinghjandhjleavehjallhjtoolshjbehind.
b)hjMovehjalhjworkhjequipmenthjandhjtoolshjouthjofhjthehjtravelhjpathshjandhjkeephjtravelhjpathshjclear.
c)hjContinuehjtohjworkhjandhjadvicehjthehjthehjhospital'shjprojecthjmanager.
d)hjEvacuatehjandhjremovehjallhjequipmenthjandhjtoolshjfromhjthehjarea.

b)hjMovehjalhjworkhjequipmenthjandhjtoolshjouthjofhjthehjtravelhjpathshjandhjkeephjtravelhjpathshjclear.
AnyhjprojecthjrequireshjthathjthehjpipedhjgashjsystemhjbehjshuthjdownhjandhjO2hjsuppliedhjbyhjportablehjcyli
nders.hjAhjstoragehjareahjhashjbeenhjsethjasidehjforhjcylindershj(23.5hjcuhjfthjperhjcylinder).hjWhathjishjthehjma
xhjnumberhjofhjcylindershjthathjcanhjbehjstoredhjinhjthehjunit?
a)hj10
b)hj12
c)hj14
d)hj16 b)hj12hjMaxhj300hjCF
Ahjmultiphasehjprojecthjwillhjrequirehjyouhjtohjalterhjegresshjpatternshjforhjseveralhjunits,hjthehjICU,hjTCU,hj
andhjMICU.hjInhjsomehjinstances,hjrequiredhjexistshjwillhjleadhjtohjanhjactivehjconstructionhjsite.hjWhathjIL
SM'shjarehjmosthjappropriate.
a)hjProvidehjtemphjexithjsignagehjinhjaffectedhjareashjandhjmonitorhjegresshjpathshjtohjensurehjthathjtheyhjre
mainhjclear.
b)hjDevelophjandhjidentifyhjnewhjexithjroutes,hjtrainhjstaffhjinhjaffectedhjareas,hjandhjincreasehjfirehjdrills.
c)hjProvidehjtemphjexithjsignage,hjimplementhjahjfirehjwatch,hjandhjdocumenthjallhjactivities.

,d)hjProvidehjtemphjexithjsignage,hjnotifyhjthehjfirehjdepartment,hjandhjperformhjadditionalhjfirehjdrills.

b)hjDevelophjandhjidentifyhjnewhjexithjroutes,hjtrainhjstaffhjinhjaffectedhjareas,hjandhjincreasehjfirehjdrills.
Ahjrenovationhjprojecthjishjunderwayhjonhjahjnursinghjunit.hjThehjegresshjcorridorhjishj10'6hjwidehjwithhjahj20
"hjWOWhjinhjthehjcorridorhjandhjABHRhjdispensershjthathjprojecthj4"hjintohjthehjcorridor.hjHowhjmuchhjofhjt
hehjcorridorhjcanhjbehjusedhjtohjstorehjconstructionhjsupplies.
a)hjAshjmuchhjashj2'6hjprovidedhjmaterialshjarehjstoredhjbetweenhjWOW's
b)hjMaterialshjmayhjbehjstoredhjagainsthjthehjwallhjtohjahjmaximumhjwidthhjofhj8".
c)hjNohjmaterialshjmayhjbehjstoredhjinhjthehjcorridor.
d)hjAshjmuchhjashj2'2"hjprovidedhjmaterialshjarehjstoredhjbetweenhjthehjWOW's
c)hjNohjmaterialshjmayhjbehjstoredhjinhjthehjcorridor.
Yourhjestimatehjishjoverhjbudget.hjThehjownerhjhashjexpressedhjahjdesirehjtohjreducehjthehjcosthjbyhjeliminati
nghjthehjcentralhjenergyhjplanthjandhjreplacinghjthehjchillershjwithhjdirecthjexpansionhjunits.hjOtherhjthanhje
nergyhjefficiency,hjwhathjotherhjvariableshjshouldhjbehjincludedhjinhjthishjdiscussion?
a)hjProjectedhjlife,hjreplacementhjcosts,hjfuturehjexpansionhjplans.
b)hjMaintenancehjandhjrepairhjcosts,hjsalvagehjvalue
c)hjMaintenancehjandhjrepairhjcosts,hjreplacementhjcosts.
d)hjProjectedhjlife,hjmaintenancehjandhjrepairhjcosts,hjreplacementhjcosts.
d)hjProjectedhjlife,hjmaintenancehjandhjrepairhjcosts,hjreplacementhjcosts.
AccordinghjtohjASHRAEhj170-
2008,hjwhathjishjthehjminimumhjsupplyhjairhjvolumehjforhjahj20x20x15hjclasshjAhjoperatinghjroom?
a)hj1000hjCFM
b)hj1500hjCFM
c)hj2000hjCFM
d)hj2500hjCFM b)hj1500hjCFMhj15-20hjAirhjchangeshjperhjhour.
Ashjyouhjarrivehjathjwork,hjyouhjarehjnotifiedhjthathjthehjhospitalhjhashjimplementedhjtheirhjEOPhjovernight.
hjAshjthehjprojecthjmanager,hjwhichhjbesthjdescribeshjthehjstepshjyouhjshouldhjtakehjinhjorderhjofhjpriority.

a)hjCeasehjworkhjcontracthjthehjfacilityhjmanagerhjforhjmorehjdetails,hjandhjresumehjworkhjifhjadequatehjpo
werhjishjavailable.
b)hjContracthjthehjowner'shjrepresentativehjandhjaskhjforhjfurtherhjinstructions.
c)hjCeasehjwork,hjcontracthjinspectionhjPreventionisthjforhjinstructions.
d)hjCeasehjwork,hjsecurehjmaterialshjandhjtoolshjashjpossible,hjwaithjforhjfurtherhjinstructions.
b)hjContracthjthehjowner'shjrepresentativehjandhjaskhjforhjfurtherhjinstructions.
Inhjwhichhjofhjthehjfollowinghjstageshjofhjahjconstructionhjprojecthjishjanhjinfectionhjcontrolhjriskhjassessme
nthjbesthjinitiated?
a)hjProgramminghj
b)hjProjecthjMobilization
c)hjConstructionhjPhase
d)hjCommissioning a)hjProgramming
Whichhj1996hjActhjofhjCongresshjrequireshjthathjpatienthjinformationhjremainhjconfidential?
a)HealthhjInsurancehjPortabilityhjandhjAccountabilityhjAct
b)HealthhjInsurancehjProtectionhjandhjProfitabilityhjAct
c)hjHealthhjInformationhjProtectionhjandhjPortabilityhjAct
d)hjHealthhjInformationhjProtectionhjandhjPortabilityhjAct.
a)HealthhjInsurancehjPortabilityhjandhjAccountabilityhjAct
Whichhjofhjthehjfollowinghjishjthehjproperhjtubinghjtohjinstallhjinhjahjhospitalhjtypehj1hjoxygenhjsystem?

,a)hjASTMhj8819hjHardhjdrawnhjseamlesshjmedicalhjgashjtubing
b)hjASThjMG327hjmedicalhjgashjcopperhjtubing
c)hjHardhjdrawinghjseamlesshjcoperhjhighhjpressurehjratedhjtubing
d)hjASGRAWhj189hjmedicalhjgashjcopperhjtubing
a)hjASTMhj8819hjHardhjdrawnhjseamlesshjmedicalhjgashjtubing
Basedhjonhjthehjfollowinghjwhichhjishjthehjlowesthjpriorityhjforhjreplacement?
a)hjAcutehjCarehjHospital
b)hjMOB
c)hjChildren'shjHosptial
d)hjBehaviorhjHealthhjHospital b)hjMOB
WhichhjofhjthehjfollowinghjOR'shjinhjthehjsmallesthjORhjmeetinghjthehjminimumhjrequirementshjofhjthehj20
10hjFGIhjguidelineshjforhjdesignhjandhjconstructionhjofhjhealthhjcarehjfacilitieshjforhjahjclasshjChjORhjinhjahjge
neralhjhospital?
a)hj17'9x22'9
b)hj19'6x19'6
c)hj19'3x21'3
d)hj20'x20'6 d)hj20'x20'6
Ahjsmokehjcompartmenthjofhjahjhospitalhjbuilthjinhj2001hjishjapproximatelyhj125'x150'.hjYouhjarehjaskedhjt
ohjrefithjthehjnursinghjresource,hjbreakhjroomhjandhjmedicationhjsupplyhjareashjonhjonehjunithjwhichhjmeasu
reshjapproximatelyhj50'x75'.hjWhichhjishjmorehjlikely?
a)hjThehjAHJhjwillhjconsiderhjthishjahjmajorhjrehabilitationhjandhjrequirehjcompliancehjtohjchapterhj18hjofhjt
hehjNFPAhj101hj(2000hjEdition)
b)ThehjAHJhjwillhjconsiderhjthishjahjmajorhjrehabilitationhjandhjrequirehjcompliancehjtohjchapterhj18hjofhjth
ehjNFPAhj101hj(2000hjEdition)
c)hjThehjAHJhjwillhjconsiderhjthishjahjminorhjrehabilitationhjandhjrequirehjcompliancehjtohjchapterhj18hjofhj
NFPAhj101hj(2000hjEdition)
d)hjThehjAHJhjwillhjconsiderhjthishjahjminorhjrehabilitationhjandhjrequirehjcompliancehjtohjchapterhj19hjofhj
NFPAhj101hj(2000hjEdition)

d)hjThehjAHJhjwillhjconsiderhjthishjahjminorhjrehabilitationhjandhjrequirehjcompliancehjtohjchapterhj19hjofhj
NFPAhj101hj(2000hjEdition)-Lesshjthanhj50%,hjchapterhj18hjNew,hjchapterhj19hjremodel
WhichhjofhjthehjfollowinghjcouldhjbehjincludedhjinhjthehjICRMR?
a)hjAdditionalhjfirehjdrills,hjconductedhj(2)hjtimeshjperhjquarter.
b)hjNegativehjpressurehjofhjthehjworkspacehjinhjthehjrelationshiphjtohjthehjsurroundinghjareas.
c)hjSchedulinghjworkhjtohjminimizehjthehjimpacthjofhjnoisehjandhjvibration
d)hjDeterminationhjofhjpatienthjriskhjlevels
b)hjNegativehjpressurehjofhjthehjworkspacehjinhjthehjrelationshiphjtohjthehjsurroundinghjareas.hj-
Monitoring
INhjorderhjtohjupgradehjanhjelectricalhjpanel,hjthehjpanelhjmusthjbehjremovedhjfromhjservice.hjThehjworkhjwi
llhjtakehj40hjworkinghjhourshjtohjcomplete.hjElectricalhjlaborhjcostshj120/hr.hj(M-Fhj8-17)hjorhj180/
hr.hj(allhjotherhjhours),hjandhjthehjlaborhjcontracthjlimitshjyouhjtohjtwohj10-
hourhjshiftshjperhjdayhjmaximum.hjGivenhjthathjthehjhospitalhjestimateshjrevenuehjlosseshjofhj250/hr.hj(M-
Fhj7-19)hjandhj100/hr.hjallhjothers,hjwhathjishjthehjminhjcosthj(laborhj+hjlosses)hjtohjcompletehjthehjwork?
a)hj8,800
b)hj11,200
c)hj11,600

, d)hj11,600 c)hj11,600hj
120x40=4800
180x40=7200
YouhjarrivehjonsitehjandhjarehjtoldhjthehjTJChjishjtherehjforhjanhjinspection.hjHowhjcanhjyouhjbesthjassisthjthehj
hospitalhjduringhjthishjtime?
a)Inspecthjyourhjworkhjsitehjtohjinsurehjthathjthehjprojectshjimpacthjonhjlifehjsafetyhjishjminimized.
b)hjInspecthjyourhjworksitehjtohjensurehjthathjthehjprojectshjimpacthjonhjinfectionhjcontrolhjishjminimized.
c)hjGatherhjILSMhjrecordshjforhjreviewhjbyhjthehjsurveyhjteam
d)hjReducehjworkhjlevelhjtohjthehjminimumhjpossible,hjsendinghjashjmanyhjworkershjhomehjashjpossible.
c)hjGatherhjILSMhjrecordshjforhjreviewhjbyhjthehjsurveyhjteam
BeforehjbeginninghjworkhjinhjahjBMT,hjyouhjarehjaskedhjtohjverifyhjroomhjpressureshjwithhjahjsmokehjgener
ator.hjStandinghjonhjthehjcorridorhjsidehjofhjthehjdoorhjtohjahjpatienthjroom,hjwhichhjwayhjshouldhjthehjsmokeh
jtrail hjflow?

a)hjNeitherhjintohjthehjroomhjnorhjouthjofhjthehjroom
b)hjintohjthehjpatienthjroom
c)hjAwayhjfromhjthehjpatienthjroom
d)hjEitherhjdirectionhjishjacceptable c)hjAwayhjfromhjthehjpatienthjroom
WhichhjofhjthehjfollowinghjishjhehjmosthjlikelyhjsourcehjofhjLegionellahjbacteriumhjinhjahjhospitalhjsetting?
a)hjHothjwaterhjsystems
b)hjDuctwork
c)hjOxygenhjSystems
d)hjSanitaryhjSewer a)hjHothjwaterhjsystems
NIOSHhjrecommendshjanhj8hrhjtimehjweighedhjnoisehjexposurehjlimithjofhj85dbBAhjwithhjahj3dBAhjexcha
ngehjrate.hjYourhjworkershjarehjnearhjanhjambulancehjaccesshjroute.hjThehjAmbulanceshjrunninghjhothjgene
ratehjahjsoundhjpressurehjofhj120dBA,hjhowhjlonghjshouldhjconstructionhjworkershjworkhjinhjthishjareahjwit
houthjhearhjprotection?
a)hj85hjmins
b)hj8.5hjmins
c)hj8.5hjseconds
d)hj85hjseconds c)hj8.5hjseconds
Whichhjofhjthehjfollowinghjoffershjthehjbesthjchronologicalhjorderhjforhjahjhospitalhjconstructionhjproject?
a)hjFunctionalhjprogram,hjarchitecturalhjprogram,hjdesignhjdevelopment,hjconstructionhjdrawings.
b)hjArchhjprogram,hjfunctionalhjprogram,hjdesignhjdevelopment,hjconstructionhjdrawings.
c)hjDesignhjdevelopment,hjarchitecturalhjprogram,hjconstructionhjdrawings,hjfunctionalhjprogram.
d)hjArchhjprogram,hjconstructionhjdrawings,hjdesignhjdevelopment,hjfunctionalhjprogram.

a)hjFunctionalhjprogram,hjarchitecturalhjprogram,hjdesignhjdevelopment,hjconstructionhjdrawings.
YouhjcurrenthjprojecthjishjinhjL&D,hjnexthjtohjthehjNICU,hjandhjtakinghjplacehjoverhjthehjhospitalshjBMT.hjY
ourhjnexthjphasehjcallshjforhjdemolitionhjofhjahjportionhjofhjfloorhjslab.hjWhichhjstatementhjbesthjdescribeshjt
hehjrisk.
a)hjNoisehjandhjvibrationhjinhjthehjL&DhjandhjNICU.
b)hjDusthjgenerationhjinhjL&DhjandhjnoisehjandhjvibrationhjinhjthehjNICU
c)hjNoisehjandhjvibrationhjinhjBMThjandhjNICU
d)hjDusthjgenerationhjinhjthehjBMThjandhjnoisehjandhjvibrationhjinhjthehjNICU.
d)hjDusthjgenerationhjinhjthehjBMThjandhjnoisehjandhjvibrationhjinhjthehjNICU.

Escuela, estudio y materia

Institución
CHC Practice
Grado
CHC Practice

Información del documento

Subido en
17 de enero de 2025
Número de páginas
44
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
gracewairimu

Conoce al vendedor

Seller avatar
gracewairimu alpha book
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
1 año
Número de seguidores
0
Documentos
48
Última venta
1 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes