100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Nicet Level 1 Highway Construction (Question and answers)

Puntuación
-
Vendido
-
Páginas
9
Grado
A
Subido en
16-01-2025
Escrito en
2024/2025

Acceptance - The written acceptance by the Department of the Work. acceptance testing - Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - The computed cost using calculations provided addendum - A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - The quantity of a completed Item eligible for payment authorized funding amount - The amount of funds authorized by the Department for the Contract Bidder - The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department.

Mostrar más Leer menos
Institución
Grado

Vista previa del contenido

Nicet level 1 highway construction



Nicet Level 1 Highway Construction
(Question and answers)
Acceptance - ✔✔The written acceptance by the Department of the Work.


acceptance testing - ✔✔Testing conducted by the Department to measure
the degree of compliance to the Contract


actual cost - ✔✔The computed cost using calculations provided


addendum - ✔✔A Contract revision or response to a Contractor inquiry
issued after advertisement and before the opening of bids.


as-built quantity - ✔✔The quantity of a completed Item eligible for payment


authorized funding amount - ✔✔The amount of funds authorized by the
Department for the Contract


Bidder - ✔✔The individual, firm, partnership, corporation, joint venture, or
any acceptable combination thereof that submits a bid to the Department.


bridge - ✔✔. A structure, other than a culvert, including supports, erected
over a depression or an obstruction, such as water, highway, or railway, and
having a track or passageway for carrying traffic or other moving loads and
having a length 3 measured along the center of the structure of more than
20 feet between undercopings of abutments or extreme ends of openings for
multiple boxes. Structure dimensions are defined as follows:


bridge length - ✔✔The overall length measured along the line of survey
stationing from back to back of backwalls of abutments, if present, otherwise
end to end of the bridge floor; but, in no case less than the total clear
opening of the structure



pg. 1

, Nicet level 1 highway construction




bridge width - ✔✔The clear width measured at right angles to the
longitudinal centerline of the bridge between the bottom of curbs, or in the
case of multiple height of curbs, between the bottoms of the lower risers or,
if curbs are not used, between inner faces of parapet or railing


Change Order. - ✔✔A written order issued by the Department to the
Contractor after execution of the Contract authorizing one or more of the
following: 1. Changes in the Work. 2. Modifications in the basis of payment.
3. Modifications to Contract Time.


Commercially Useful Function - ✔✔Occurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract
and carrying out its responsibilities by actually performing, managing, and
supervising the work involved, and with respect to materials and supplies
used on the contract, prepares the estimate, negotiates price, determines
quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.


Completion - ✔✔When all of the following have occurred: 1. The Work has
been satisfactorily completed in all respects according to the Contract. 2.
The Project is ready for use by the Department as required by the Contract.
3. The Contractor has satisfactorily executed and delivered to the RE all
documents, certificates, and proofs of compliance required by the Contract
including the Notice of Completion.


construction operations - ✔✔Physical work done in the performance of the
Contract within the Project Limits. Does not include off-site mobilization,
procurement and off-site storage of materials and plants, engineering,
performance bond and payment bond, surveys, working drawings, off-site
field offices, schedules, certificates, forms, or documents


Contract - ✔✔The written integrated agreement between the Department
and the Contractor setting forth the obligations of the parties, including, but
not limited to, the performance of the Work and the basis of payment. It
includes the advertisement, Proposal, Certification as to Publication and
Notice of Advertisement for Proposal, bid, Appointment of Agent by


pg. 2

Escuela, estudio y materia

Grado

Información del documento

Subido en
16 de enero de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ProfessorJazz

Conoce al vendedor

Seller avatar
ProfessorJazz Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
3 año
Número de seguidores
0
Documentos
92
Última venta
7 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes