100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Asphalt Paving Level 2 Exam Questions With Correct Answers.

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
14-01-2025
Escrito en
2024/2025

Asphalt Paving Level 2 Exam Questions With Correct Answers. (T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on the basis of visual inspection, the Engineer may run acceptance tests to determine the acceptability of the material. - AnswerTrue If the resolution test results compare favorably with the Contractor's QC test results: A. The Lot is accepted at full pay B. The Contractor is required to remove and replace the Lot in question C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing D. The Contractor's QC results are used for pay for that Lot and the Department pays for the testing E. The Contractor pays for the Resolution testing - Answer(D.) The Contractor's QC results are used for pay for that Lot and the Department pays for testing What materials are approved for use for tack application? A. SS-1 or CSS-1, SS-1H or CSS-1H B. RS-1, RS-2, MC-250, SS-4 C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500 D. All the Above E. None of the Above - Answer(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500 The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer of asphalt is: A. 40°F B. 45°F C. 50°F ©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e D. 65°F and rising - Answer(A.) 40°F A quality of Asphalt Mix will be: A. Constructable B. Conform to specifications C. Satisfy the functional requirements D. All the above - Answer(D. All the above) - Constructable, conform to specifications, and satisfy the functional requirements Which condition will result in more time available for compaction? A. SP-19 coarse mix during the day B. FC-9.5 fine mix at night C. FC-9.5 coarse mix during the day D. SP-12.5 fine mix with PG76-22 - Answer(A.) SP-19 coarse mix during the day The fallowing statement is true about trucks used to haul asphalt mix: A. Truck drivers must be certified to haul asphalt mix B. Truck beds need to be clean and smooth C. Hole must be present in both sides of truck bed D. All the above E. Both B & C - Answer(E. Both B & C) - Truck beds need to be clean and smooth and hole must be present in both sides of the truck bed When using a vibratory roller, which is generally correct? A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot B. Run low frequency, high amplitude, and 10-12 impacts per foot C. Vibrate only when the lift of mix is less than 1.25 inches D. Both A and C E. Both B and C - Answer(B.) Run low frequency, high amplitude, and 10-12 impacts per foot If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction tolerance for the layer thickness? - Answer-+ 8.3 lbs/sq yds On the structural layer prior to the friction course, correct any deficiencies before placing the friction course.

Mostrar más Leer menos
Institución
Asphalt
Grado
Asphalt

Vista previa del contenido

©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED.




Asphalt Paving Level 2 Exam Questions
With Correct Answers.


(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for
Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on
the basis of visual inspection, the Engineer may run acceptance tests to determine the
acceptability of the material. - Answer✔True
If the resolution test results compare favorably with the Contractor's QC test results:
A. The Lot is accepted at full pay
B. The Contractor is required to remove and replace the Lot in question
C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing
D. The Contractor's QC results are used for pay for that Lot and the Department pays for the
testing

E. The Contractor pays for the Resolution testing - Answer✔(D.) The Contractor's QC results are
used for pay for that Lot and the Department pays for testing
What materials are approved for use for tack application?
A. SS-1 or CSS-1, SS-1H or CSS-1H
B. RS-1, RS-2, MC-250, SS-4
C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
D. All the Above

E. None of the Above - Answer✔(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer of
asphalt is:
A. 40°F
B. 45°F
C. 50°F

1|Page

, ©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED.

D. 65°F and rising - Answer✔(A.) 40°F
A quality of Asphalt Mix will be:
A. Constructable
B. Conform to specifications
C. Satisfy the functional requirements

D. All the above - Answer✔(D. All the above) - Constructable, conform to specifications, and
satisfy the functional requirements
Which condition will result in more time available for compaction?
A. SP-19 coarse mix during the day
B. FC-9.5 fine mix at night
C. FC-9.5 coarse mix during the day

D. SP-12.5 fine mix with PG76-22 - Answer✔(A.) SP-19 coarse mix during the day
The fallowing statement is true about trucks used to haul asphalt mix:
A. Truck drivers must be certified to haul asphalt mix
B. Truck beds need to be clean and smooth
C. Hole must be present in both sides of truck bed
D. All the above

E. Both B & C - Answer✔(E. Both B & C) - Truck beds need to be clean and smooth and hole
must be present in both sides of the truck bed
When using a vibratory roller, which is generally correct?
A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot
B. Run low frequency, high amplitude, and 10-12 impacts per foot
C. Vibrate only when the lift of mix is less than 1.25 inches
D. Both A and C

E. Both B and C - Answer✔(B.) Run low frequency, high amplitude, and 10-12 impacts per foot
If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction tolerance for the
layer thickness? - Answer✔-+ 8.3 lbs/sq yds
On the structural layer prior to the friction course, correct any deficiencies before placing the
friction course.

2|Page

Escuela, estudio y materia

Institución
Asphalt
Grado
Asphalt

Información del documento

Subido en
14 de enero de 2025
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
202
Miembro desde
1 año
Número de seguidores
7
Documentos
12554
Última venta
12 horas hace
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reseñas

5
10
4
4
3
8
2
3
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes