API 653 Data Sheets Exam Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
10-01-2025
Escrito en
2024/2025

API 653 Data Sheets Exam Questions and Answers 100% Pass Fitness For Service - API 579 Low Pressure Storage Tanks - API 620 Risked Based Inspection - API 580 Cathodic Protection - API 651 Tank Bottom Linings - API 652 Welding on in service equipment containing flammables - API 2201 NDE Procedure Guidlines - ASME Section V Acceptance Standards for RT of welds - ASME Section 8, Div. 1 Alternative evaluation for pits and LTA's - ASME Section 8, Div. 2 Welder Qualification - ASME Section IX Weld Procedure Qualification - ASME Section IX Impact testing method and equipment requirements - ASTM A370 EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2 Requirement for new welding electrodes - AWS NDE personnel qualification (RT and UT flaw detection) - ASNT SNT-TC-1A API 650 Appendix for frangible roofs - Appendix F API 650 Appendix for hot tanks - Appendix M Maximum allowed vertical length of pits on a tank shell - 2" in 8" Line Max allowed length of pits in the critical zone th

Mostrar más Leer menos
Institución
Api 653
Grado
Api 653










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Api 653
Grado
Api 653

Información del documento

Subido en
10 de enero de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

API 653 Data Sheets Exam
Questions and Answers 100% Pass

Fitness For Service - ✔✔API 579


Low Pressure Storage Tanks - ✔✔API 620


Risked Based Inspection - ✔✔API 580


Cathodic Protection - ✔✔API 651


Tank Bottom Linings - ✔✔API 652


Welding on in service equipment containing flammables - ✔✔API 2201


NDE Procedure Guidlines - ✔✔ASME Section V


Acceptance Standards for RT of welds - ✔✔ASME Section 8, Div. 1


Alternative evaluation for pits and LTA's - ✔✔ASME Section 8, Div. 2


Welder Qualification - ✔✔ASME Section IX


Weld Procedure Qualification - ✔✔ASME Section IX


Impact testing method and equipment requirements - ✔✔ASTM A370




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 1

,Requirement for new welding electrodes - ✔✔AWS


NDE personnel qualification (RT and UT flaw detection) - ✔✔ASNT SNT-TC-1A


API 650 Appendix for frangible roofs - ✔✔Appendix F


API 650 Appendix for hot tanks - ✔✔Appendix M


Maximum allowed vertical length of pits on a tank shell - ✔✔2" in 8" Line


Max allowed length of pits in the critical zone that can be repaired by weld build up -

✔✔2" in 8" arc


Radial length of critical zone measured from shell - ✔✔3"


Bottoms- suggested pad thickness - ✔✔3-4"


Minimum distance between clusters of surface porosity - ✔✔4"


Minimum dimension of shell lap-patch - ✔✔4"


Minimum radius of shell flush-patch - ✔✔6"


When calculating tmin for shell LTA, minimum distance away from a rivet where "E" is

always 1.0 - ✔✔6"


Minimum size of a bottom lap-patch that does NOT cross a bottom seam - ✔✔6"


Minimum distance between a bottom lap patch and the shell for patches that do NOT

extend to the shell - ✔✔6"




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2

, If reusing shell plates, minimum distance to cut from existing shell welds (if plates are

not deseamed) - ✔✔6"


Minimum diagnostic length of RT for vertical or horizontal welds - ✔✔6"


Minimum length of RT when qualifying a welder with RT using a coupon or 1st

production weld - ✔✔6"


Minimum length of RT when qualifying a weld operator with a test coupon - ✔✔6"


Minimum distance to overlap a shell weld when using a lap patch - ✔✔6"


Area to dig when checking for soil-to-air corrosion - ✔✔6-12"


Typical size of a vacuum box - ✔✔6"X30"


Minimum dimension of a shell flush patch - ✔✔12" or 12 times thickness of replacement

plate, whichever is greater


Bottoms-minimum distance a 3 lap joint can be from: other 3 lap joints, the shell or

annular plate joints - ✔✔12"


Minimum dimension of bottom lap patch that crosses a bottom seam - ✔✔12"


Foundations- suggested height above grade for new tank bottoms - ✔✔12"


When adding a shell flush patch that extends to a horizontal shell weld, minimum

distance to cut the horizontal weld past the new vertical welds - ✔✔12"




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 3
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmilyCharlene Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
443
Miembro desde
2 año
Número de seguidores
138
Documentos
21009
Última venta
1 día hace
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.6

97 reseñas

5
45
4
13
3
15
2
7
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes