100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PLC LADDER LOGICS AND BOOLEAN EXPRESSIONS

Puntuación
-
Vendido
-
Páginas
19
Grado
A+
Subido en
10-01-2025
Escrito en
2024/2025

Which of the following two broad categories are PLC memories divided into? Program and data files Which of the following is the type of PLC memory file used to address hardwired inputs? Input image Which of the following components does a PLC processor normally not contain? Relay Which of the following is referred to by the tag name "local"? Module defined Which of the following is the purpose of the input interface module? it connects the CPU to signals from the process Which of the following is a consideration for selecting an output module for a PLC? The type of low voltage load driven Fuse indicator may be located on the _____ Output modules Which of the following modules must be used with a current sourcing sensor? A current sinking input module Which of the following is the type of load that a triac output module is used to control? To directly control an AC device Which of the following is the type of load that a relay output module is used to control? An AC power source Which of the following type of switching device is used on VDC discrete output modules? A transistor Which of the following is one advantage to using discrete wiring to connect a PLC to another control The connection can be tested with a simple meter After connecting a limit switch to the input of a PLC, the proper operation of the switch can be tested by _____ Checking for 24 volts at the ground connection of the switch A solenoid is connected to the_____ Output terminal of an output module A newly added electronic sensor doesn't seem to be working properly. Which of the following is the first thing to check? The wiring of the switch The best way to test the handshake signal provided by the output module of a robot controller is ____ To operate the robot to turn on the output to be tested, then verifying the PLC input The best way to test the handshake signal provided by the output module of a PLC to a robotic controller is ____ Cause the PLC output to actuate, and verify that the signal is present in the robot interface The main use of input/output diagram is ____ To document the physical connections of the PLC to the machine electrical hardware Which of the following rules apply when creating an interface diagram between a PLC and a machine control? All connections between PLC and the machine control must be included Which of the following best describes serial communication The function of transferring data between two processor-based devices Which of the following does the term "baud rate" describe in serial communications? How quickly data is exchanged Which of the following is not critical for online program editing? A wireless connection Which of the following best describes the difference between online and offline program editing? Online editing relies on an active serial communication between devices Which of the following is the difference between online editing and program monitoring? Online editing enables the user to change the active program, but program monitoring does not Which of the following is why program documentation is a feature provided to end users? To provide a copy of the PLC program that can be referenced without the use of PLC editing software Which of the following stores the status of input and output devices? Random-access memory (RAM) Which of the following does the remote function of a PLC allow the user to perform? Allowing the PLC operation status to be changed online The process of opening a PLC program with an application program assumes ____ That you have the correct software Which of the following is a basic rule of a PLC program The program that is currently used is the only one in the PLC memory Which of the following is not an example of the PLC programming language project? Edit window Which of the following is the indication method used to show logic/power flow when monitoring a PLC program with a personal computer? The symbols are highlighted When the processor does not find a continuous path of true input instructions in a rung, the output instruction will become or remain _____ False If the rung evaluates to a true condition, the output instruction will____ energize Which of the following is the number of true inputs a four-input AND must have to have a true output? 4 Which of the following is the numbering system used to display timing and counter values? Decimal Which of the following are the states of bit instructions with a binary numbering system? 0, 1 Which of the following is decimal 23 in binary? 10111 Which of the following is the binary equivalent to the decimal number 47? 101111 Which of the following describes how an input device can reference multiple input instructions? Ladder logic can address an input bit as many times as the program requires There are 25 output connected to a PLC. The speed that it can turn any individual output on or off is limited by ____ All the above The speed of the microprocessor The scan times set up in the PLC The speed of the I/O buss Attempting to determine the correct time base, a technician activates the sensor to start the time and notices that the motor the timer controls turns on 15 seconds after the sensor is activated. Which of the following would indicate the correct time base and preset? Time base = 0.01, Preset = 1500 An on-delay timer is set to time when input condition "A" is true. In the time frame of 10 minutes, "A" is true for 10 milliseconds every minute. Which of the following is the accumulated time after the 10 minutes if the time is non-retentive? 10 milliseconds

Mostrar más Leer menos
Institución
PLC
Grado
PLC










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PLC
Grado
PLC

Información del documento

Subido en
10 de enero de 2025
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PLC LADDER LOGICS AND BOOLEAN
EXPRESSIONS QUESTIONS AND ANSWERS A+
Explain the primary purpose of a Programmable Logic Controller (PLC).
To automate industrial processes by controlling machinery and equipment.

What are the main components of a PLC system?
Processor (CPU), input modules, output modules, power supply, and communication interface.

Describe how ladder logic represents control logic.
It uses graphical symbols that resemble electrical relay logic diagrams, with rungs representing control
sequences.

How does an AND logic gate operate in ladder logic?
The output is true only when all input conditions are true.

What is the function of an OR gate in Boolean expressions?
The output is true when at least one input condition is true.

Explain the difference between NO (Normally Open) and NC (Normally Closed) contacts in PLC
programming.
NO contacts pass current when activated, while NC contacts interrupt current when activated.

What is the purpose of a timer in a PLC program?
To introduce a delay or measure the duration of an event.

Describe the role of a counter in ladder logic.
To count occurrences of specific events, either incrementing or decrementing a value.

What happens in a ladder logic rung when a coil is energized?
The output device connected to the coil is activated.

How does a latch work in PLC programming?
A latch maintains the energized state of a coil until an explicit reset condition occurs.

Explain the purpose of an interlock in a PLC system.
To prevent conflicting operations or ensure safety by enabling specific actions only under defined
conditions.

What does a NOT gate do in a Boolean expression?
It inverts the input signal; if the input is true, the output is false, and vice versa.

Describe the scan cycle of a PLC.
The PLC reads inputs, processes the logic, updates outputs, and repeats this cycle continuously.

How are analog signals different from digital signals in PLCs?
Analog signals vary continuously, while digital signals are discrete, representing only on/off states.

,What is the significance of the XIC (Examine If Closed) instruction in ladder logic?
It checks if a specified input or memory location is in the true state.

Explain the role of the XIO (Examine If Open) instruction.
It checks if a specified input or memory location is in the false state.

What is the function of a memory bit in PLC programming?
To store the state of a process or intermediate results for use in the control logic.

How can a PLC be programmed to execute a repetitive task?
By using loops or repetitive rungs in the ladder logic program.

Describe the concept of redundancy in PLC systems.
Redundancy involves duplicating critical components to ensure system reliability in case of failure.



Which of the following is not a suitable application for a PLC?

To control a computer numerical control (CNC) machine

PLC are _____ designed for use in the control of a wide variety of manufacturing machines and systems

Special-purpose industrial computers

When comparing a relay-based control system to a PLC, which of the following is not an advantage of the
PLC?

Capable of switching higher output currents

The part of a PLC that executes the logic program is the _____

Processor

The purpose of a digital output module is _____

To energize loads in response to PLC instructions

Which of the following is the proper sequence of operation within a PLC?

Examine inputs, perform logic, update outputs

Which of the following is how input and output modules communicate with the CPU?

By a series of electrical connections in the backplane

Which of the following does not apply to the optical isolator circuit in the I/O modules?

Converting analog signals to digital signals for processing

Which of the following is a common language used to program PLCs that uses a graphical representation
of relay circuits?

Ladder logic

, Which of the following two broad categories are PLC memories divided into?

Program and data files

Which of the following is the type of PLC memory file used to address hardwired inputs?

Input image

Which of the following components does a PLC processor normally not contain?

Relay

Which of the following is referred to by the tag name "local"?

Module defined

Which of the following is the purpose of the input interface module?

it connects the CPU to signals from the process

Which of the following is a consideration for selecting an output module for a PLC?

The type of low voltage load driven

Fuse indicator may be located on the _____

Output modules

Which of the following modules must be used with a current sourcing sensor?

A current sinking input module

Which of the following is the type of load that a triac output module is used to control?

To directly control an AC device

Which of the following is the type of load that a relay output module is used to control?

An AC power source

Which of the following type of switching device is used on VDC discrete output modules?

A transistor

Which of the following is one advantage to using discrete wiring to connect a PLC to another control

The connection can be tested with a simple meter

After connecting a limit switch to the input of a PLC, the proper operation of the switch can be tested by
_____

Checking for 24 volts at the ground connection of the switch

A solenoid is connected to the_____

Output terminal of an output module
$4.81
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ProfBarnnet

Conoce al vendedor

Seller avatar
ProfBarnnet Massachusetts Institute Of Technology
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
11 meses
Número de seguidores
0
Documentos
87
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes