Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

Unrestricted CSL Practice Questions And All Correct Answers.

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

Who is authorized to enforce the provisions of 780 CMR, review/issue permit applications, issue noticed/orders, and make required inspections? - Answer Building official IRC Amendments R104.1 General Who shall receive and issue permits? - Answer Building official IRC Amendments R104.2 Application and Permits Who shall issue notices and orders? - Answer Building official IRC Amendments R104.3 who shall make the required inspections? - Answer Building official IRC Amendments R104.4 A permit is required for work including but not limited to repairs for substantial cutting of walls - Answer IRC Amendments R105.2.2 Repairs The building official shall issue or deny a permit within ___ days of filing - Answer 30 days IRC Amendments R105.3.1 Action on Application How many days does a building inspector have to act on a permit application a.) 180 days b.) 90 days c.) 30 days d.) 60 days - Answer c.) 30 days IRC Amendments R105.3.1 Action on Application

Vista previa del contenido

Unrestricted CSL Practice Questions
And All Correct Answers.
Who is authorized to enforce the provisions of 780 CMR, review/issue permit applications, issue
noticed/orders, and make required inspections? - Answer Building official

IRC Amendments R104.1 General



Who shall receive and issue permits? - Answer Building official

IRC Amendments R104.2 Application and Permits



Who shall issue notices and orders? - Answer Building official

IRC Amendments R104.3



who shall make the required inspections? - Answer Building official

IRC Amendments R104.4



A permit is required for work including but not limited to repairs for substantial cutting of walls - Answer
IRC Amendments R105.2.2 Repairs



The building official shall issue or deny a permit within ___ days of filing - Answer 30 days

IRC Amendments R105.3.1 Action on Application



How many days does a building inspector have to act on a permit application

a.) 180 days

b.) 90 days

c.) 30 days

d.) 60 days - Answer c.) 30 days

IRC Amendments R105.3.1 Action on Application

, Every permit issued shall become invalid unless the work authorized by such permit is commended
within ___ days. The building official can grant one or more extensions for periods not more than ____
days - Answer 180 days, 90 days

IRC Amendments R105.3.2 Time Limitation on Application



A permit may be suspended or revoked for all of the following reasons, except

a.) where it is issued in error

b.) on the basis of incomplete information

c.) where issued in violation of jurisdictional ordinance

d.) where other permits by the contractor have been voided - Answer d.) where other permits by the
contractor have been voided

IRC Amendments R105.6



Submittal documents consisting of construction documents, and other data shall be submitted in ____ or
more sets with each application for a permit - Answer two sets

IRC Amendments R107.1 Submittal Documents



Townhouse buildings greater than 35,000 square feet require a ______ - Answer registered design
professional

IRC Amendments R107.1.6 Townhouse buildings greater than 35,000 square feet



On which drawing will you find the building location and lot lines? - Answer Site plan/plot plan

IRC Amendments R107.2 Site Plan or Plot Plan



Who should the building official notify inspections for on-site construction? - Answer permit holder

R109.1 Type of inspections



What is required for a certificate of occupancy

1a) building permit number

b.) assessed value of the structure

Información del documento

Subido en
9 de enero de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.69

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestSolver9
3.5
(165)
Vendido
958
Seguidores
128
Artículos
30723
Última venta
2 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes