Who is authorized to enforce the provisions of 780 CMR, review/issue permit applications, issue
noticed/orders, and make required inspections? - Answer Building official
IRC Amendments R104.1 General
Who shall receive and issue permits? - Answer Building official
IRC Amendments R104.2 Application and Permits
Who shall issue notices and orders? - Answer Building official
IRC Amendments R104.3
who shall make the required inspections? - Answer Building official
IRC Amendments R104.4
A permit is required for work including but not limited to repairs for substantial cutting of walls - Answer
IRC Amendments R105.2.2 Repairs
The building official shall issue or deny a permit within ___ days of filing - Answer 30 days
IRC Amendments R105.3.1 Action on Application
How many days does a building inspector have to act on a permit application
a.) 180 days
b.) 90 days
c.) 30 days
d.) 60 days - Answer c.) 30 days
IRC Amendments R105.3.1 Action on Application
, Every permit issued shall become invalid unless the work authorized by such permit is commended
within ___ days. The building official can grant one or more extensions for periods not more than ____
days - Answer 180 days, 90 days
IRC Amendments R105.3.2 Time Limitation on Application
A permit may be suspended or revoked for all of the following reasons, except
a.) where it is issued in error
b.) on the basis of incomplete information
c.) where issued in violation of jurisdictional ordinance
d.) where other permits by the contractor have been voided - Answer d.) where other permits by the
contractor have been voided
IRC Amendments R105.6
Submittal documents consisting of construction documents, and other data shall be submitted in ____ or
more sets with each application for a permit - Answer two sets
IRC Amendments R107.1 Submittal Documents
Townhouse buildings greater than 35,000 square feet require a ______ - Answer registered design
professional
IRC Amendments R107.1.6 Townhouse buildings greater than 35,000 square feet
On which drawing will you find the building location and lot lines? - Answer Site plan/plot plan
IRC Amendments R107.2 Site Plan or Plot Plan
Who should the building official notify inspections for on-site construction? - Answer permit holder
R109.1 Type of inspections
What is required for a certificate of occupancy
1a) building permit number
b.) assessed value of the structure