100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CLCL 010 Technical Data Management Credential Capstone Assessment Answered Winter 2025.

Puntuación
-
Vendido
-
Páginas
4
Grado
A+
Subido en
07-01-2025
Escrito en
2024/2025

CLCL 010 Technical Data Management Credential Capstone Assessment Answered Winter 2025. A radar subassembly is now obsolete, but the depot team found a replacement subassembly. What two pieces of Logistic Product Data need to be developed or modified for the new subassembly? Select two that apply. • Updated System Requirement Specifications • Technical manual • Supply support information • Engineering drawings What logistics product data would be requested by submitting a completed CDRL for a new four-ton fork-lift to be delivered to the Army? • Preservation and Packaging Data • Interface Control Drawings • System Requirement Specification • Test Reports What is the Data Item Description for an Engineering Change Proposal (ECP)? Go to the ASSIST database to confirm. • DI-PACK-80120 latest revision • DI-SESS-80294 latest revision • DI-SESS-80639 latest revision • DI-NDTI-80603 latest revision What must a Logistician do with the Logistics Product Database once the database has been successfully initialized with data provided by the OEM? • Ensure the data accurately reflect system-level mission profile requirements in the Key Performance Parameters (KPPs) as listed in the Capability Development Document (CDD) • All answers are correct • Validate that the data is present and valid in the database structure • Ensure the database has a product structure with levels of indenture consistent with Technical Design data After the Army’s new software-defined radio is developed and deployed, we want to solicit alternative sources for sustaining it in the field. Which of the following data rights will enable use to share the necessary technical data with an alternative product support provider? Select two that apply. • None of the answers are correct • Limited Rights • Government Purpose Rights • Unlimited Right What technical data items would consist of a Technical Data Package (TDP) for a Rapid Prototyping program? • Final design requirements; Technical data necessary for a competent manufacture to produce the item; Technical data to reflect the approved, test, and accepted configuration of the defined delivered item • Simple sketches; Artist renderings; System performance specifications • Developmental design data; Unique item specifications; Final design requirements; Technical data necessary for a competent manufacture to produce the item • Sufficient technical data to support the analysis of a specific design approach; Developmental design data; Unique item specifications; Fabrication of the prototype materiel for test or experimentation You are assigned to review the data right markings for a noncommercial technical drawing as shown in the attached graphic. What are you finding? • Unjustified marking, need to contact the Contracting Officer • Nonconforming marking, need to contact the Contracting Officer • Correct marking, no action necessary • Both unjustified and nonconforming marking. Need to contact the Contracting Officer How should technical data be delivered from the contractor to the Program Office? • The Program Office will ask for the delivery of the technical data from the contractor based on the need for the technical data. The Program Office will not submit any Contract Data Requirements List (CDRLs). • The Program Office will include Contract Data Requirements List (CDRLs) for all essential, proper and necessary technical data in the Request for Proposal and the subsequent contract. The CDRLs will list the address and the point of contact for the delivery of the technical data • The technical data will be delivered based on the contractor’s costs to develop the technical data. The contractor will provide the Program Office the deliverable only when requested • All technical data will be stored at the contractor’s facility and the program Office will only have access to the technical data based on the contractor’s direction How does configuration management promote effective support in Sustainment in regards technical data? Select two choices. • Providing the physical configuration and basis for repair documentation and acquisition of replacement parts • Minimizing program cost and risk associated with complete, inaccurate, and/or missing maintenance, repair, and spares re-procurement of technical data • Providing the data right markings on all the technical data • Enabling the technical data for the earned value reports What metadata would you select to identify, search for, and access the technical data needed in an Integrated Digital Environment? Select three. • Title of technical data • Version identifier • General topic key words • Cost of the technical data What are three technical data items that go into a product Technical Data Package (TDP) for a new Army tank entering production? • Parts list of the fuel pump • Engineering 2D drawings of the engine • Computer software source code for the navigation system • Packing details of an electric motor After importing a GEIA-STD-0007-compliant Logistics Product Database file, your PowerLOG-J presents an error screen with a message calling out a violation. What is the most effective and proper way to correct this identified violation? • Report the error through your IPT so the violation can be evaluated for contract compliance and corrective action can be taken as necessary Which paragraph is correct about Data Rights for noncommercial technical data under a DoD procurement contract? • The Program Office will not obtain any Data Rights, since the sustainment strategy is for the contractor to perform all the necessary sustainment efforts • All technical data will have Government Purpose Rights (GPR) as defined by Defense Federal Acquisition Regulation Supplement (DFARS). Any technical data that does not have GPR will not be accepted. The Acquisition Strategy and the Life Cycle Sustainment Plan will also state that all technical data will be delivered with GPRs • Data Rights will depend on a few factors. First, the Program Office will clearly identify data deliverables via a Contract Data Requirements Lists (CDRLs). Once the technical data is delivered, the Government Subject Matter experts will review the Data Rights Markings What would be the Configuration Management Baseline for Navy’s ship fuel pump that would contain the full list of performance specifications, material/process specifications, all engineering drawings, and associated lists? (This is essentially all of the technical data necessary to acquire or manufacture the pump.) • Allocated • Functional • Product • Derived What is the correct Work Breakdown Structure (WBS) for a new Navy Destroyer ship? Use the WBS containing alternatives “a,” “b,” “c,” and “d,” to choose your answer • a • b • c • d What are three technical data items for the M3R vehicle that will be ordered with a Contract Data Requirement List (CDRL)? • Instructions for installing the split screen viewing application on the warfighter’s laptop enable him/her to see what the M3R’s cameras are seeing • Firmware and computer source code that enable the M3R vehicle to avoid obstacles • 3D design drawings of the arm & gripper • Instructions for installing the cameras for nighttime viewing You are assigned to review the engineering drawing for the correct format. The drawing is for a type 3D native model. What is your response about the model? • Not a 3D native model • None of these responses is correct • Drawing is correct; a 3D native model • Drawing is almost correct since it is a blue print

Mostrar más Leer menos
Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
7 de enero de 2025
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

A radar subassembly is now obsolete, but the depot team found a replacement subassembly.
What two pieces of Logistic Product Data need to be developed or modified for the new
subassembly? Select two that apply.
• Updated System Requirement Specifications
• Technical manual
• Supply support information
• Engineering drawings

What logistics product data would be requested by submitting a completed CDRL for a new
four-ton fork-lift to be delivered to the Army?
• Preservation and Packaging Data
• Interface Control Drawings
• System Requirement Specification
• Test Reports

What is the Data Item Description for an Engineering Change Proposal (ECP)? Go to the
ASSIST database to confirm.
• DI-PACK-80120 latest revision
• DI-SESS-80294 latest revision
• DI-SESS-80639 latest revision
• DI-NDTI-80603 latest revision

What must a Logistician do with the Logistics Product Database once the database has been
successfully initialized with data provided by the OEM?
• Ensure the data accurately reflect system-level mission profile requirements in the Key
Performance Parameters (KPPs) as listed in the Capability Development Document (CDD)
• All answers are correct
• Validate that the data is present and valid in the database structure
• Ensure the database has a product structure with levels of indenture consistent with
Technical Design data
After the Army’s new software-defined radio is developed and deployed, we want to solicit
alternative sources for sustaining it in the field. Which of the following data rights will enable use
to share the necessary technical data with an alternative product support provider? Select two
that apply.

• None of the answers are correct
• Limited Rights
• Government Purpose Rights
• Unlimited Right

What technical data items would consist of a Technical Data Package (TDP) for a Rapid
Prototyping program?
• Final design requirements; Technical data necessary for a competent manufacture to
produce the item; Technical data to reflect the approved, test, and accepted configuration of
the defined delivered item
• Simple sketches; Artist renderings; System performance specifications
• Developmental design data; Unique item specifications; Final design requirements;
Technical data necessary for a competent manufacture to produce the item
• Sufficient technical data to support the analysis of a specific design approach;
Developmental design data; Unique item specifications; Fabrication of the prototype materiel
for test or experimentation
$16.84
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Topscorer london
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
116
Miembro desde
5 año
Número de seguidores
13
Documentos
454
Última venta
1 día hace
Top Scorer

Helping all Students fulfill their educational, career and personal goals.

4.3

24 reseñas

5
16
4
3
3
3
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes