100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Massachusetts oil burner study guide with complete solutions

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
31-12-2024
Escrito en
2024/2025

Massachusetts oil burner study guide with complete solutions

Institución
Massachusetts Oil Burner
Grado
Massachusetts oil burner









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Massachusetts oil burner
Grado
Massachusetts oil burner

Información del documento

Subido en
31 de diciembre de 2024
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Massachusetts oil burner study guide
with complete solutions 2024-2025
6 oil burners have been installed in a large room which is of tight construction and which
must be kept closed at all times there is decidedly not enough combustion air for proper
burner operation there burner sizes are 1.35 gallons per hour under these conditions
what is the minimum free area of an opening connecting to the outdoors which must be
provided - ANSWER-567 inch by 2 inch vent going to outside

A combustion efficiency test includes measurements of - ANSWER-Stack temperature
smoke test and excess of air

A fuel deaerator - ANSWER-eliminates the need for a return line back to the tank

a layer of Ash 1/16 inch thick will increase fuel consumption by - ANSWER-4%

A single stationary conductor in the flux of a permanent magnet will - ANSWER-induce
a current flow.

A steam pigtail should always be installed between the pressuretrol and the boiler too -
ANSWER-To Place a water seal between the boiler and the pressure troll.

About 21% of air is made of - ANSWER-Oxygen

According to code when is a low water cut off required on a steam boiler - ANSWER-
Steam boilers and hot water boilers above 400000 BTUs

According to code when is a low water cut off required on a water boiler - ANSWER-
Always

Advantage of PSC Motors over conventional split phase Motors is they - ANSWER-Are
protected by an overload switch

All petroleum products are chemical compounds of - ANSWER-Hydrogen and carbon

An advantage of flame retention burner is - ANSWER-The high static pressure enables
boilers and furnaces with tighter more efficient heat exchanger passages

Are compression fittings allowed on oil lines - ANSWER-No

Before using an electronic analyzer you must - ANSWER-Performers smoke test to be
sure you're bringing at 0 to trace of smoke

, blank is a good insulator at 120 volts but a good conductor at 10000 volts - ANSWER-
Air

Can a series 10 .3 wire thermostat be used with a 2-wire control? explain. - ANSWER-
Yes by jumping out the ground

Can a series 80 dryer thermostat be wired into a 3-wire control - ANSWER-No

Can an overflow pipe from the auxiliary tank have a valve or obstruction - ANSWER-No

Can stack switches be used as a primary control - ANSWER-Yes

Can Teflon tape be used on oil line connections - ANSWER-No

Can two supply tanks be provided with only one fill pipe and vent pipe - ANSWER-Yes

Compared to wet kits digital electronic conversion kits instruments are - ANSWER-Are
faster and can create a printed record

Dirt & Lint built up in the bevel of the burner fan blades will - ANSWER-Reduce the
amount of combustion air

Electrical current the amount of electricity flowing in a circuit is measured in - ANSWER-
Amps

Energizing the ignition circuit during the entire burn cycle - ANSWER-Significantly
reduces ignition component life

Excessive draft drop through the heat exchanger indicates - ANSWER-Heavy set and
scale deposits in the heat exchanger

Explain how a burner should be piped when the supply tank is located below the burner
- ANSWER-2. Pipe dual stage with a bypass plug

Explain interrupted ignition - ANSWER-the ignition Transformer drops out of the circuit
once a flame is established

Explain two different types of differentials used by thermostat - ANSWER-In heating
anticipates heat leftover.in cold turns on compressor early

How are primary controls wired - ANSWER-L Black L2 white Terminal 3 goes to the
burner motor Terminal 4 goes to interrupted ignition all must be flexible

How high on the wall should thermostat be installed - ANSWER-5 feet from the ground

how is a cad cell primary control relay put in step - ANSWER-The reset button
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLOUND Exam
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
607
Miembro desde
2 año
Número de seguidores
389
Documentos
11183
Última venta
4 días hace
PROF MM

HELLO WELCOME TO THIS PAGE WHERE YOU WILL FIND ALL EXAMS ,STUDY GUIDE ,CASE, TESTBANKS AND ANY OTHER STUDY MATERIALS,

3.9

116 reseñas

5
58
4
16
3
29
2
3
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes