QSP Exam questions with correct answers latest update All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks - ANSWER -C Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO - ANSWER -B Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States: a. Clean Water Act (CWA) b. Porter-Cologne Water Quality Control Act c. Endangered Species Act d. U.S. Environmental Protection Agency (USEPA) e. California Environmental Quality Act (CEQA) - ANSWER -A Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such discharges provided they meet the following conditions except: a. Meet the NALs for pH and turbidity b. Not cause or contribute to a violation of water quality standards c. Comply with BMPs as described in the SWPPP d. Be infeasible to eliminate e. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER -E When possible, use erosion controls as the ___ protection, with sediment controls as a ___system. a. primary, secondary b. secondary, primary - ANSWER -A A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is... a. erosion control b. run on/ run off control c. sediment control - ANSWER -B The amount of eroded soil that settles out at a point in the watershed that is remote from the origin of the detached soil particles is... a. Rainfall Erosivity Factor b. Slope Length and Steepness Factors c. Soil Cover Factor d. Sediment Yield - ANSWER -D What is turbidity? a. The degree to which the water loses its transparency due to the presence of suspended particulates b. the acidity or alkalinity of a solution c. the degree to which a chemical substance or a particular mixture of substances can damage an organism - ANSWER -A The removal of a uniform thin layer of soil by raindrop splash or water run-off is... a. Splash Erosion b. Rill Erosion c. Sheet Erosion d. Wind Erosion - ANSWER -C What elements of RUSLE are independent of location? a. K b. R c. LS d. C & P - ANSWER -D What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)? a. Soil erodibility factor b. Management operations and support practices (sediment controls) c. Rainfall-runoff erosivity factor d. Length-slope factor e. Cover factor (erosion controls) - ANSWER -B What is the difference of an LUP project in comparison to traditional projects? a. Erosion control is not needed. b. "Run-On/Run-Off" is not an objective. c. Sampling is not required. - ANSWER -B TRUE OR FALSE: The SWPPP is a "living document" that is amended/updated to reflect conditions & reduce pollutants - ANSWER -True Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after __days of inactivity. a. 3 b. 7 c. 10 d. 14 - ANSWER -D Once identified, dischargers shall begin implementing repairs or design changes to BMPs: a. Immediately b. Within24 hours c. Within48 hours d. ASAP, but not more than 72 hours - ANSWER -D The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours prior to any likely precipitation event. a. Immediately b. 24 hours c. 48 hours d. ASAP but not more than 72 hours - ANSWER -C A likely precipitation event is any weather pattern that is forecasted to have a __% or greater probability of producing precipitation in the project area. a. 10 b. 25 c. 50 d. 75 e. 99 - ANSWER -C TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water monitoring is required if the receiving water monitoring trigger exceeded pH, turbidity and SSC. Bioassessment for sites 30 acres or larger. - ANSWER -False (Risk level 3 only) Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk Levels? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. All of the above e. Risk Level 1 & 2 - ANSWER -D A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event c. Inactive storm event d. Unsafe monitoring event - ANSWER -A Upload photos to SMARTS that are taken during daily inspections of the LUP site before, during, and after every ___ storm event a. Firs

Mostrar más Leer menos
Institución
QSP
Grado
QSP









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
QSP
Grado
QSP

Información del documento

Subido en
28 de diciembre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

QSP Exam questions with correct answers latest
update
All NAL data must be uploaded within ___ after NAL exceedance has been identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - ANSWER -C

Who must file Permit Registration Documents (PRDs) prior to the commencement of
construction activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - ANSWER -B

Which regulation establishes a framework for regulating municipal and industrial storm
water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - ANSWER -A

Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER -E

When possible, use erosion controls as the ___ protection, with sediment controls as a
___system.
a. primary, secondary
b. secondary, primary - ANSWER -A

A temporary or permanent structural BMP that directs concentrated flows away from
disturbed areas and prevents erosion is...
a. erosion control
b. run on/ run off control
c. sediment control - ANSWER -B

, The amount of eroded soil that settles out at a point in the watershed that is remote
from the origin of the detached soil particles is...
a. Rainfall Erosivity Factor
b. Slope Length and Steepness Factors
c. Soil Cover Factor
d. Sediment Yield - ANSWER -D

What is turbidity?
a. The degree to which the water loses its transparency due to the presence of
suspended particulates
b. the acidity or alkalinity of a solution
c. the degree to which a chemical substance or a particular mixture of substances can
damage an organism - ANSWER -A

The removal of a uniform thin layer of soil by raindrop splash or water run-off is...
a. Splash Erosion
b. Rill Erosion
c. Sheet Erosion
d. Wind Erosion - ANSWER -C

What elements of RUSLE are independent of location?
a. K
b. R
c. LS
d. C & P - ANSWER -D

What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)?
a. Soil erodibility factor
b. Management operations and support practices (sediment controls)
c. Rainfall-runoff erosivity factor
d. Length-slope factor
e. Cover factor (erosion controls) - ANSWER -B

What is the difference of an LUP project in comparison to traditional projects?
a. Erosion control is not needed.
b. "Run-On/Run-Off" is not an objective.
c. Sampling is not required. - ANSWER -B

TRUE OR FALSE: The SWPPP is a "living document" that is amended/updated to
reflect conditions & reduce pollutants - ANSWER -True

Stockpiles require a linear sediment barrier at all times, and must be covered prior to a
rain event or when inactive. A stockpile is inactive after __days of inactivity.
a. 3
b. 7
c. 10
$8.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheExamMaestro Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
121
Miembro desde
1 año
Número de seguidores
5
Documentos
3167
Última venta
1 semana hace
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reseñas

5
7
4
2
3
1
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes