Updated 2024-2025.
The only way to create an Xactimate estimate is through XactAnalysis. - Answer: False
With an Internet connection, you can download and upload a XactAnalysis assignment. -
Answer: True
What are the steps in the 4-Step Estimating Process? - Answer: 1.Claim Info
2.Sketch
3.Estimate Items
4.Complete
Before dragging a wall handle, holding down the ______ key on your keyboard will create a new
room. - Answer: Control
Page 1 of 5
, What does a number in parentheses represent when it follows a room name? e.g., Closet (1) -
Answer: Subgroup
The Undo button can only be used twice. - Answer: False
The variable PF stands for floor perimeter. - Answer: True
This Quick Entry field represents a two-letter code for each item quantity. For example, SF
(square feet), EA (each), UN (unit), etc. - Answer: Unites of Measure
Which Quick Entry field determines the item's unit price by describing exactly what is to happen
to that specified item? - Answer: Item Activity (Act) Field
Two feature options appear once you click on an item in a Reference Search image. Which ones
are they? - Answer: Refined Topics and Search Results
When an estimate is marked Completed, you can still modify it. - Answer: False
In some instances, you may leave items in violation if they are correct for the scope of the
estimate. - Answer: True
If you want to make changes to an estimate that has a status of completed, you must: - Answer:
Change the estimate status to In Progress.
Once a roof has been placed, the roof type can be changed in the _________ Window -
Answer: Properties
What variable can be used to place drip edge around the entire perimeter of a roof? - Answer: P
Page 2 of 5