minimum anchor spacing and edge distance, as well as minimum member thickness, must comply with
the values given - Answers In the products ICC-ES Report
The registered design professional in responsible charge and the engineers of record involved in the
design of the project are permitted to act as the - Answers Approved Agency
If reinforcing bars are encountered during drilling the correct action would be - Answers Consulting with
the EOR
for adhesive anchors, the characteristics bond stresses and suitability for structural applications are
established by testing in accordance with - Answers ACI 355.4
Special inspections and tests shall be required for proposal work that is, in the opinion of the building
official, unusual in its nature, as such, but not limited to - Answers All of the above
ACI 355.4, qualification of post installed adhesive anchors in concrete, is applicable to anchors with a
specified minimum embedment depth of - Answers 1 - 5/8 inches
Proof loads are usually determined as a - Answers Percentage of the anchor ultimate tensile strength
True or False: The contractor is permitted to employ the approved agencies for special inspection where
the contractor is also the owner of the project? - Answers True
The effective embedment depth, measure from the concrete surface to the deepest point at which bond
to the concrete is established is identified as - Answers h subscript(ef)
True or false: Powers PE1000+ epoxy adhesive are recognized for use to resist short-term and long-term
loads, including wind and earthquake loads, subject to conditions of the ICC-ES Evaluation report? -
Answers True
Short sections of anchor rods the have been burned or sawed are indictive of: - Answers Incorrect
embedment
The elapsed time after mixing adhesive material components to onset of significant chemical reaction as
characterized by an increase in viscosity is - Answers Gel Time
Periodic and final inspection reports are required to be summited to the - Answers Building official and
engineer or architect of record
Powers PE1000+ epoxy adhesive anchors must be installed in accordance with? - Answers The
manufacturers published installation instructions
ACI 355.4-11 qualification of post installed adhesive anchors in concrete standard applies to anchors
with diameter of 1/4in or larger and an embedment depth not exceeding: - Answers 20d(a)
, The( ) ensures that the components are well mixed so the adhesive resin is activated by the hardener -
Answers Mixing Nozzle
The ICC-ES evaluation report for the powers 1000+ product specifies that holes drilled in concrete be
cleaned out by using? - Answers Steel wire brush
ACI 355.4 requires the manufacturer to provide inspection procedures for each type of anchoring
system, to verify proper usage of their products (true or false) - Answers True
An observant inspector can derive clues about the quality of the installations from tell-tale signs at the
site of the installation, some of which include - Answers 1. packaging from no-specified adhesive
products
2. discarded mixing nozzles that have been cut off
3. lack of evidence of expressing adhesive when starting a new cartridge
The ICC-ES evaluation report for the Powers 1000+ product requires that drilled holes for threaded rod
diameter greater than 3/4in be cleaned out using compressed air at a minimum of: - Answers 90 psi
An anchor system is made up of an: - Answers adhesive, anchor, drilling equipment, cleaning equipment,
installation equipment, MPII, and MSDS
An anchor connection includes - Answers an attachment, an anchor, and the substrate
Adhesive anchors are cast in concrete before the concrete hardens(true or false) - Answers False
What piece of equipment has a static mixing element? - Answers Mixing nozzle
Adhesive anchor failure in tension does NOT occur by - Answers concrete pryout failure
Adhesive anchor failure modes in shear include: - Answers steel failure, concrete pryout failure, and
concrete breakout failure
Installation factors that influence the strength of the adhesive anchor bond include: - Answers drilling of
the hole following MPII
cleaning of the hole following MPII
injecting the adhesive following the MPII
Adhesive should be stored at: - Answers As directed by the MPII
Gel time is? - Answers 1. the amount of time between first mixing the adhesive and when it becomes a
noon-flowing material