CSST EXAM STUDY GUIDE || QUESTIONS AND ANSWERS (GRADED A+) CSST EXAM STUDY GUIDE || QUESTIONS AND ANSWERS (GRADED A+) A building owner of a building constructed before 1979, who knows the building contains ACCM, shall provide all employees in that building with the following: - ANSWER - Any Asbestos Surveys - Specific ACCM locations - General Procedures and handling restrictions - Summary of bulk sampling results. - Health Risks. At a multi-employer worksite, an employer performing work requiring the establishment of a regulated area shall...? - ANSWER - - Inform other employers on the site of the nature of the employers work with asbestos or PACM - Inform other employers of the existence of & requirements pertaining to regulated areas. - Inform other employers of measures taken to ensure their employees are not exposed to asbestos. Water Spray Process System Work Practices (4) - ANSWER - 1. System shall run for 10 mins before removal begins. 2. All removal shall take place within the water barrier. 3. System shall be operated by 3 persons, one of whom shall not perform removal, but maintains equipment. 4. After removal ACM/PACM shall be bagged while still inside the water barrier. Water Spray Process System Specifications (3) - ANSWER - 1. Piping shall be surrounded on 3 sides by rigid framing. 2. A 360 degree water spray on a separate high pressure water line. 3. The spray shall collide to form a fine aerosol, creating a liquid barrier between ACM & workers. Medical Exam shall include: - ANSWER - 1. Medical & work history 2. Questionnaire 3. Chest x-ray 4.PFT 5. Any other exams requested by DR. NESHAP Cat. I - ANSWER - Asbestos containing packings, gaskets, resilient floor covering, & asphalt roof products. Class IV Asbestos Work - ANSWER - Maintenance & custodial activities during which employees contact but do not disturb ACM or PACM, and activities to clean up dust, waste & debris resulting from class I, II & III activities. PACM - ANSWER - Presumed Asbestos Containing Material TSI and surfacing material found in blogs. constructed no later than 1980 Asbestos - Containing Material (ACM) - ANSWER - Any material or product containing more than 1% Asbestos. Amended Water - ANSWER - water with a surfactant in it. Air Flow Tests should be performed when?

Mostrar más Leer menos
Institución
Csst
Grado
Csst










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Csst
Grado
Csst

Información del documento

Subido en
22 de diciembre de 2024
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CSST EXAM STUDY GUIDE || QUESTIONS
AND ANSWERS (GRADED A+)




Conceptial Research


,CSST EXAM STUDY GUIDE || QUESTIONS
AND ANSWERS (GRADED A+)
A building owner of a building constructed before 1979, who knows the building
contains ACCM, shall provide all employees in that building with the following: -
ANSWER - Any Asbestos Surveys
- Specific ACCM locations
- General Procedures and handling restrictions
- Summary of bulk sampling results.
- Health Risks.

At a multi-employer worksite, an employer performing work requiring the establishment
of a regulated area shall...? - ANSWER - - Inform other employers on the site of the
nature of the employers work with asbestos or PACM
- Inform other employers of the existence of & requirements pertaining to regulated
areas.
- Inform other employers of measures taken to ensure their employees are not exposed
to asbestos.

Water Spray Process System Work Practices
(4) - ANSWER - 1. System shall run for 10 mins before removal begins.
2. All removal shall take place within the water barrier.
3. System shall be operated by 3 persons, one of whom shall not perform removal, but
maintains equipment.
4. After removal ACM/PACM shall be bagged while still inside the water barrier.

Water Spray Process System Specifications
(3) - ANSWER - 1. Piping shall be surrounded on 3 sides by rigid framing.
2. A 360 degree water spray on a separate high pressure water line.
3. The spray shall collide to form a fine aerosol, creating a liquid barrier between ACM &
workers.


Medical Exam shall include: - ANSWER - 1. Medical & work history
2. Questionnaire
3. Chest x-ray
4.PFT
5. Any other exams requested by DR.

NESHAP Cat. I - ANSWER - Asbestos containing packings, gaskets, resilient floor
covering, & asphalt roof products.

Class IV Asbestos Work - ANSWER - Maintenance & custodial activities during which
employees contact but do not disturb ACM or PACM, and activities to clean up dust,
waste & debris resulting from class I, II & III activities.

, PACM - ANSWER - Presumed Asbestos Containing Material

TSI and surfacing material found in blogs. constructed no later than 1980

Asbestos - Containing Material (ACM) - ANSWER - Any material or product containing
more than 1% Asbestos.

Amended Water - ANSWER - water with a surfactant in it.

Air Flow Tests should be performed when? - ANSWER - -Before operation begins
-At least once per operating shift
-anytime there is a question regarding the integrity of the enclosure.

For Class I Jobs: Negative Pressure must be established for how long? - ANSWER - 24
hrs a day for entire duration of project.

DOT (Department of Transportation) - ANSWER - 49 CFR Parts 171 &172

Pink Book - ANSWER - Bulk Sampling

Before removing work clothing - ANSWER - Clean with a HEPA Vacuum

Where are respirators removed? - ANSWER - The Shower

Green Book - ANSWER - Management Plan

Formula for # of negative air machines - ANSWER - Volume of Area/15 mins
------------------------------
CFM of Unit

+ Backup Machine

1. Warning labels shall be attached in buildings, where?
2. What should they say? - ANSWER - 1.Immediately adjacent to any ACBM,
Suspected ACBM or assumed ACBM in routine maintenance areas.
2. Caution: Asbestos. Hazardous. Do not disturb without proper training and equipment.

For removing asphalt and vinyl flooring which contain ACM, or are in bldg. constructed
no later than 1980 and not tested... employees shall follow these work practices
(9) - ANSWER - 1. No sanding flooring or its backing.
2. Use HEPA vacs, disposable dust bags & metal floor tool (no brush) to clean floors.
3. Resilient sheeting shall be removed by cutting & wet methods.
4. Scraping of adhesives shall be wet.
5. No dry sweeping.
6. No mechanical chipping without neg. pressure enclosure.
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DocuProf University Of Texas - Austin
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
55
Miembro desde
2 año
Número de seguidores
27
Documentos
207
Última venta
1 mes hace
Docu Prof.

Have a paper due or exam coming up? Why fret? I\'ve got you covered. Welcome to Docu Prof. I offer you 100% verified study materials for your verified study materials for your quizzes, exams, assignments, and general school work. All the study material here are top rated (Graded A & A+) to help you get the best grade. I am also a very approachable and friendly person so, please, don\'t hesitate to send a message in case you have a query. Please remember to leave a review if my study material are helpful. I wish you Luck.

Lee mas Leer menos
4.3

6 reseñas

5
4
4
0
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes